Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 30 - Mineral Resources |
Chapter II - Bureau of Safety and Environmental Enforcement, Department of the Interior |
SubChapter B - Offshore |
Part 250 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf |
Subpart G - Well Operations and Equipment |
§ 250.704 - Site clearance verification. |
Coiled Tubing Operations |
§ 250.750 - xxx |
§ 250.751 - xxx |
Records and Reporting |
§ 250.740 - What records must I keep? |
§ 250.741 - How long must I keep records? |
§ 250.742 - What well records am I required to submit? |
§ 250.743 - What are the well activity reporting requirements? |
§ 250.744 - What are the end of operation reporting requirements? |
§ 250.745 - What other well records could I be required to submit? |
§ 250.746 - What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers? |
Blowout Preventer (BOP) System Requirements |
§ 250.730 - What are the general requirements for BOP systems and system components? |
§ 250.731 - What information must I submit for BOP systems and system components? |
§ 250.732 - What are the independent third party requirements for BOP systems and system components? |
§ 250.733 - What are the requirements for a surface BOP stack? |
§ 250.734 - What are the requirements for a subsea BOP system? |
§ 250.735 - What associated systems and related equipment must all BOP systems include? |
§ 250.736 - What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves? |
§ 250.737 - What are the BOP system testing requirements? |
§ 250.738 - What must I do in certain situations involving BOP equipment or systems? |
§ 250.739 - What are the BOP maintenance and inspection requirements? |
Snubbing Operations |
§ 250.760 - xxx |
Well Operations |
§ 250.720 - When and how must I secure a well? |
§ 250.721 - What are the requirements for pressure testing casing and liners? |
§ 250.722 - What are the requirements for prolonged operations in a well? |
§ 250.723 - What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow? |
§ 250.724 - What are the real-time monitoring requirements? |
General Requirements |
§ 250.700 - What operations and equipment does this subpart cover? |
§ 250.701 - May I use alternate procedures or equipment during operations? |
§ 250.702 - May I obtain departures from these requirements? |
§ 250.703 - What must I do to keep wells under control? |
Rig Requirements |
§ 250.710 - What instructions must be given to personnel engaged in well operations? |
§ 250.711 - What are the requirements for well-control drills? |
§ 250.712 - What rig unit movements must I report? |
§ 250.713 - What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations? |
§ 250.714 - Do I have to develop a dropped objects plan? |
§ 250.715 - Do I need a global positioning system (GPS) for all MODUs? |