Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 30 - Mineral Resources |
Chapter II - Bureau of Safety and Environmental Enforcement, Department of the Interior |
SubChapter B - Offshore |
Part 250 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf |
Subpart K - Oil and Gas Production Requirements |
§ 250.1100 - Definitions for production rates. |
§ 250.1101 - General requirements and classification of reservoirs. |
§ 250.1102 - Oil and gas production rates. |
§ 250.1103 - Well production testing. |
§ 250.1104 - Bottomhole pressure survey. |
§ 250.1105 - Flaring or venting gas and burning liquid hydrocarbons. |
§ 250.1106 - Downhole commingling. |
§ 250.1107 - Enhanced oil and gas recovery operations. |
Classifying Reservoirs |
§ 250.1154 - How do I determine if my reservoir is sensitive? |
§ 250.1155 - What information must I submit for sensitive reservoirs? |
Production Rates |
§ 250.1159 - May the Regional Supervisor limit my well or reservoir production rates? |
General |
§ 250.1150 - What are the general reservoir production requirements? |
Flaring, Venting, and Burning Hydrocarbons |
§ 250.1160 - When may I flare or vent gas? |
§ 250.1161 - When may I flare or vent gas for extended periods of time? |
§ 250.1162 - When may I burn produced liquid hydrocarbons? |
§ 250.1163 - How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain? |
§ 250.1164 - What are the requirements for flaring or venting gas containing H2S? |
Other Requirements |
§ 250.1165 - What must I do for enhanced recovery operations? |
§ 250.1166 - What additional reporting is required for developments in the Alaska OCS Region? |
§ 250.1167 - What information must I submit with forms and for approvals? |
Well Tests and Surveys |
§ 250.1151 - How often must I conduct well production tests? |
§ 250.1152 - How do I conduct well tests? |
§ 250.1153 - When must I conduct a static bottomhole pressure survey? |
§§ 250.1153--250.1155 - [Reserved] |
Approvals Prior to Production |
§ 250.1156 - What steps must I take to receive approval to produce within 500 feet of a unit or lease line? |
§ 250.1157 - How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap? |
§ 250.1158 - How do I receive approval to downhole commingle hydrocarbons? |