Code of Federal Regulations (Last Updated: October 10, 2024) |
Title 33 - Navigation and Navigable Waters |
Chapter I - Coast Guard, Department of Homeland Security |
SubChapter J - Bridges |
Part 117 - Drawbridge Operation Regulations |
Subpart B - Specific Requirements |
Georgia |
§ 117.371 - Savannah River.
-
§ 117.371 Savannah River.
(a) The draw of the Houlihan bridge (US 17) Bridge, mile 21.6 at Savannah Port Wentworth, Georgia, shall open on signal if at least three hours a 24-hour advance notice is given to the . Openings can be arranged by contacting Georgia Department of Transportation Area Engineer in SavannahSavannah Area Office at 1-912-651-2144.
(b) The draw of the Seaboard System CSX Transportation Railroad bridgeBridge, mile 27.4 near Hardeeville, South Carolina, shall open on a signal if at least three hours a 24-hour advance notice is given. VHF radiotelephone communications will be maintained at the railroad's chief dispatcher's office in SavannahOpenings can be arranged by contacting CSX Transportation at 1-800-232-0144.
(c) The draw of the CSX Transportation railroad bridge, mile 60.9, near Clyo, Georgia, shall open on signal if at least 48 hours advance notice is given. Openings can be arranged by contacting CSX Transportation on Channel 16 VHF or by telephone at 1 800 232-0146. VHF radiotelephone communications will be maintained at the dispatcher's office in Savannah, Georgia.
(d) The draw of the Seaboard System Railroad bridge, mile 195.4 near Augusta, shall open on signal if at least three hours notice is given.
[CGD7-84-21, 49 FR 43955, Nov. 1, 1984, as amended by CGD7-84-01, 50 FR 25073, June 17, 1985; CGD7-87-45, 53 FR 4394, Feb. 16, 1988; CGD7-90-08, 56 FR 16008, Apr. 19, 1991; USCG-2021-0012, 86 FR 27520, May 21, 2021]