§ 148.215 - What if a port has plans for a deep draft channel and harbor?  


Latest version.
  • § 148.215 What if a port has plans for a deep draft channel and harbor?

    (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a deep draft channel and harbor, a representative of the port may request a determination under 33 U.S.C. 1503(d).

    (b) The request must be sent, in writing, to the Commandant (CG-5P) within 30 days after the date that the notice of application for the deepwater port is published in the Federal Register.

    (c) The request must contain:

    (1) A signature of the highest official of the port submitting the request;

    (2) A copy of the existing plans for the construction of a deep draft channel and harbor;

    (3) Certification that the port has an active study by the Secretary of the Army for the construction of a deep draft channel and harbor, or that the port has an application pending for a permit under 33 U.S.C. 403 for the construction;

    (4) Any available documentation on:

    (i) Initial costs, by phases if development is staged, for the proposed onshore project, including dredging, ship terminal, and attendant facilities;

    (ii) Estimated annual operating expenses, by phases if development is staged, including labor, for 30 years for all elements of the project;

    (iii) Estimated completion time for all elements of the project;

    (iv) Estimated vessel traffic volume, and the volume and variety of the tonnage;

    (v) Potential traffic congestion conditions in the port, and the port's ability to control vessel traffic as a result of the proposed dredging project;

    (vi) Estimated economic benefits of the project, including:

    (A) Economic contribution to the local and regional area;

    (B) Induced industrial development;

    (C) Increased employment; and

    (D) Increases in tax revenues;

    (vii) Environmental and social impacts of the project on the local and regional community; and

    (viii) An estimate of the economic impact that the deepwater port license will have on the proposed project.

    (d) A statement whether the port seeks a determination that the port best serves the national interest.

    [USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, as amended by USCG-2013-0397, 78 FR 39176, July 1, 2013]