§ 165.T13-207 - Safety Zones; Sellwood Bridge project, Willamette River; Portland, OR.  


Latest version.
  • (a) Location. The safety zone on the western river bank encompasses all waters of the Willamette River within the following four points:

          
    45-2753.5 N122-4003.5 W
    45-2753.5 N122-3958.5 W
    45-2749.5 N122-3958.5 W
    45-2749.5 N122-4004.5 W

    (b) The safety zone on the eastern river bank encompasses all waters of the Willamette River within the following four points:

          
    45-2753.5 N122-3950.5 W
    45-2753.5 N122-3955.0 W
    45-2749.5 N122-3955.0 W
    45-2749.5 N122-3947.0 W

    (c) Regulations. In accordance with the general regulations in 33 CFR Part 165, subpart C, no person may enter or remain in the safety zones created in this section or bring, cause to be brought, or allow to remain in the safety zones created in this section any vehicle, vessel, or object unless authorized by the Captain of the Port Columbia River or his designated representative. The Captain of the Port Columbia River may be assisted by other federal, state, or local agencies with the enforcement of the safety zones.

    (d) Enforcement period. The safety zones created by this section will be in effect from 11 a.m. on July 1, 2012 through 11:00 p.m. on January 31, 2015.

    Effective Date Note: By USCG-2012-0131, 77 FR 38725, June 29, 2012, temporary §165.T13-207 was added, effective from July 1, 2012 until Jan. 31, 2015.