Table 10 to Subpart AAAAA of Part 63 - —Applicability of General Provisions to Subpart AAAAA  


Latest version.
  • Table 10 to Subpart AAAAA of Part 63—XXX

    Cross Reference
    Link to an amendment published at

    63—Applicability of General Provisions to Subpart AAAAA

    [As required in § 63.7140, you must comply with the applicable General Provisions requirements according to the following table.]

    CitationSummary of
    requirement
    Am I subject to this requirement?Explanations
    § 63.1(a)(1) through (4)ApplicabilityYes
    § 63.1(a)(5)No
    § 63.1(a)(6)ApplicabilityYes
    § 63.1(a)(7) through (9)No
    § 63.1(a)(10) through (14)ApplicabilityYes
    § 63.1(b)(1)Initial Applicability DeterminationYes§§ 63.7081 and 63.7142 specify additional applicability determination requirements.
    § 63.1(b)(2)No
    § 63.1(b)(3)Initial Applicability DeterminationYes
    § 63.1(c)(1)Applicability After Standard EstablishedYes
    § 63.1(c)(2)Permit RequirementsNoArea sources not subject to this subpart, except all sources must make initial applicability determination.
    § 63.1(c)(3) and (4)No
    § 63.1(c)(5)Area Source Becomes MajorYes
    § 63.1(c)(6)ReclassificationYes
    § 63.1(d)No
    § 63.1(e)Applicability of Permit ProgramYes
    § 63.2DefinitionsYesAdditional definitions in § 63.7143.
    § 63.3(a) through (c)Units and AbbreviationsYes
    § 63.4(a)(1) and (2)Prohibited ActivitiesYes
    § 63.4(a)(3) through (5)No
    § 63.4(b) and (c)Circumvention, SeverabilityYes
    § 63.5(a)(1) and (2)Construction/ReconstructionYes
    § 63.5(b)(1)Compliance DatesYes
    § 63.5(b)(2)No
    § 63.5(b)(3) and (4)Construction Approval, ApplicabilityYes
    § 63.5(b)(5)No
    § 63.5(b)(6)ApplicabilityYes
    § 63.5(c)No
    § 63.5(d)(1) through (4)Approval of Construction/ReconstructionYes
    § 63.5(e)Approval of Construction/ReconstructionYes
    § 63.5(f)(1) and (2)Approval of Construction/ReconstructionYes
    § 63.6(a)Compliance for Standards and MaintenanceYes
    § 63.6(b)(1) through (5)Compliance DatesYes
    § 63.6(b)(6)No
    § 63.6(b)(7)Compliance DatesYes
    § 63.6(c)(1) and (2)Compliance DatesYes
    § 63.6(c)(3) and (4)No
    § 63.6(c)(5)Compliance DatesYes
    § 63.6(d)No
    § 63.6(e)(1)(i)General Duty to Minimize EmissionsYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7100 for general duty requirement.
    § 63.6(e)(1)(ii)Requirement to Correct Malfunctions ASAPYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    § 63.6(e)(1)(iii)Operation and Maintenance RequirementsYes
    § 63.6(e)(2)No[Reserved].
    § 63.6(e)(3)Startup, Shutdown Malfunction PlanYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), the OM&M plan must address periods of startup and shutdown. See § 63.7100(d).
    § 63.6(f)(1)SSM exemptionNoSee § 63.7100. For periods of startup and shutdown, see § 63.7090(c).
    § 63.6(f)(2) and (3)Methods for Determining ComplianceYes
    § 63.6(g)(1) through (3)Alternative StandardYes
    § 63.6(h)(1)SSM exemptionNoSee § 63.7100. For periods of startup and shutdown, see § 63.7090(c).
    § 63.6(h)(2)Methods for Determining ComplianceYes
    § 63.6(h)(3)No
    § 63.6(h)(4) through (h)(5)(i)Opacity/VE StandardsYesThis requirement only applies to opacity and VE performance checks required in table 5 to this subpart.
    § 63.6(h)(5)(ii) and (iii)Opacity/VE StandardsNoTest durations are specified in this subpart; this subpart takes precedence.
    § 63.6(h)(5)(iv)Opacity/VE StandardsNo
    § 63.6(h)(5)(v)Opacity/VE StandardsYes
    § 63.6(h)(6)Opacity/VE StandardsYes
    § 63.6(h)(7)COM UseYes
    § 63.6(h)(8)Compliance with Opacity and VEYes
    § 63.6(h)(9)Adjustment of Opacity LimitYes
    § 63.6(i)(1) through (14)Extension of ComplianceYes
    § 63.6(i)(15)No
    § 63.6(i)(16)Extension of ComplianceYes
    § 63.6(j)Exemption from ComplianceYes
    § 63.7(a)(1) through (3)Performance Testing RequirementsYes§ 63.7110 specifies deadlines; § 63.7112 has additional specific requirements.
    § 63.7(b)NotificationYes
    § 63.7(c)Quality Assurance/Test PlanYes
    § 63.7(d)Testing FacilitiesYes
    § 63.7(e)(1)Conduct of TestsYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7112(b).
    § 63.7(e)(2) through (4)Conduct of TestsYes
    § 63.7(f)Alternative Test MethodYes
    § 63.7(g)Data AnalysisYes
    § 63.7(h)Waiver of TestsYes
    § 63.8(a)(1)Monitoring RequirementsYesSee § 63.7113.
    § 63.8(a)(2)MonitoringYes
    § 63.8(a)(3)No
    § 63.8(a)(4)MonitoringNoFlares not applicable.
    § 63.8(b)(1) through (3)Conduct of MonitoringYes
    § 63.8(c)(1)(i)CMS Operation/MaintenanceYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7100 for OM&M requirements.
    § 63.8(c)(1)(ii)CMS Spare PartsYes
    § 63.8(c)(1)(iii)Requirement to Develop SSM Plan for CMSYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), no longer required.
    § 63.8(c)(2) and (3)CMS Operation/MaintenanceYes
    § 63.8(c)(4)CMS RequirementsNoSee § 63.7121.
    § 63.8(c)(4)(i) and (ii)Cycle Time for COM and CEMSYesNo CEMS are required under this subpart; see § 63.7113 for CPMS requirements.
    § 63.8(c)(5)Minimum COM proceduresYesCOM not required.
    § 63.8(c)(6)CMS RequirementsNoSee § 63.7113.
    § 63.8(c)(7) and (8)CMS RequirementsYes
    § 63.8(d)(1) and (2)Quality ControlYesSee also § 63.7113.
    § 63.8(d)(3)Quality ControlYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    § 63.8(e)Performance Evaluation for CMSYesSee also § 63.7113.
    § 63.8(f)(1) through (5)Alternative Monitoring MethodYes
    § 63.8(f)(6)Alternative to Relative Accuracy Test for CEMSNoNo CEMS required in this subpart.
    § 63.8(g)(1) through (5)Data Reduction; Data That Cannot Be UsedNoSee data reduction requirements in §§ 63.7120 and 63.7121.
    § 63.9(a)Notification RequirementsYesSee § 63.7130.
    § 63.9(b)Initial NotificationsYes
    § 63.9(c)Request for Compliance ExtensionYes
    § 63.9(d)New Source Notification for Special Compliance RequirementsYes
    § 63.9(e)Notification of Performance TestYes
    § 63.9(f)Notification of VE/Opacity TestYesThis requirement only applies to opacity and VE performance tests required in table 5 to this subpart. Notification not required for VE/opacity test under table 7 to this subpart.
    § 63.9(g)Additional CMS NotificationsNoNot required for operating parameter monitoring.
    § 63.9(h)(1) through (3)Notification of Compliance StatusYes
    § 63.9(h)(4)No
    § 63.9(h)(5) and (6)Notification of Compliance StatusYes
    § 63.9(i)Adjustment of DeadlinesYes
    § 63.9(j)Change in Previous InformationYes
    § 63.9(k)Electronic reporting proceduresYesOnly as specified in § 63.9(j).
    § 63.10(a)Recordkeeping/Reporting General RequirementsYesSee §§ 63.7131 through 63.7133.
    § 63.10(b)(1)RecordsYes
    § 63.10(b)(2)(i)Recordkeeping of Occurrence and Duration of Startups and ShutdownsYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    § 63.10(b)(2)(ii)Recordkeeping of Failures to Meet a StandardYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7132 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
    § 63.10(b)(2)(iii)Maintenance RecordsYes
    § 63.10(b)(2)(iv) and (v)Actions Taken to Minimize Emissions During SSMYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7100 for OM&M requirements.
    § 63.10(b)(2)(vi) through (xii)Recordkeeping for CMSYes
    § 63.10(b)(2)(xiii)Records for Relative Accuracy TestNo
    § 63.10(b)(2)(xiv)Records for NotificationYes
    § 63.10(b)(3)Applicability DeterminationsYes
    § 63.10(c)Additional CMS RecordkeepingNoSee § 63.7132.
    § 63.10(d)(1)General Reporting RequirementsYes
    § 63.10(d)(2)Performance Test ResultsYes
    § 63.10(d)(3)Opacity or VE ObservationsYesFor the periodic monitoring requirements in table 7 to this subpart, report according to § 63.10(d)(3) only if VE observed and subsequent visual opacity test is required.
    § 63.10(d)(4)Progress ReportsYes
    § 63.10(d)(5)(i)Periodic Startup, Shutdown, Malfunction ReportsYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    On and after the relevant compliance date for your source as specified in § 63.7083(e), see § 63.7131 for malfunction reporting requirements.
    § 63.10(d)(5)(ii)Immediate Startup, Shutdown, Malfunction ReportsYes before the relevant compliance date for your source as specified in § 63.7083(e)
    No on and after the relevant compliance date for your source as specified in § 63.7083(e)
    § 63.10(e)Additional CMS ReportsNoSee specific requirements in this subpart, see § 63.7131.
    § 63.10(f)Waiver for Recordkeeping/ReportingYes
    § 63.11(a) and (b)Control Device and Work Practice RequirementsNoFlares not applicable.
    § 63.12(a) through (c)State Authority and DelegationsYes
    § 63.13(a) through (c)State/Regional AddressesYes
    § 63.14(a) and (b)Incorporation by ReferenceNo
    § 63.15(a) and (b)Availability of Information and ConfidentialityYes
    § 63.16Performance Track ProvisionsYes

    [89 FR 57766, July 16, 2024

    .

    ]