Table 10 to Subpart IIIII of Part 63 - Applicability of General Provisions to Subpart IIIII  


Latest version.
  • Table 10 to Subpart IIIII of Part 63 - Applicability of General Provisions to Subpart IIIII

    As stated in § 63.8262, you must comply with the applicable General Provisions requirements according to the following table:

    Citation Subject Applies to subpart IIIII Explanation
    § 63.1 Applicability Yes
    § 63.2 Definitions Yes
    § 63.3 Units and Abbreviations Yes
    § 63.4 Prohibited Activities Yes
    § 63.5 Construction/Reconstruction Yes
    § 63.6(a)-(g), (i), (j), except for (e)(1)(i) and (ii), (e)(3), and (f)(1) Compliance with Standards and Maintenance Requirements Yes
    § 63.6(e)(1)(i) and (ii), (e)(3), and (f)(1) SSM Requirements Yes Only applies until the date specified in § 63.8186(a)(3).
    § 63.6(h) Compliance with Opacity and Visible Emission Standards No Subpart IIIII does not have opacity and visible emission standards.
    § 63.7(a)-(h), except for (a)(2) and (e)(1) Performance Testing Requirements Yes Subpart IIIII specifies additional requirements related to site-specific test plans and the conduct of performance tests.
    § 63.7(a)(2) Applicability and Performance Test Dates No Subpart IIIII requires the performance test to be performed on the compliance date.
    § 63.7(e)(1) Performance Test Conditions No See § 63.8232(a).
    § 63.8(a)(1), (a)(3); (b); (c)(1)(ii), (2)-(4), (6)-(8); (d)(1)-(2); (e); and (f)(1)-(5) Monitoring Requirements Yes Only applies for CEMS, except Subpart IIIII specifies how and when the performance evaluation results are reported.
    § 63.8(a)(2) Continuous Monitoring System (CMS) Requirements No Subpart IIIII requires a site-specific monitoring plan in lieu of a promulgated performance specification for a mercury concentration CMS.
    § 63.8(a)(4) Additional Monitoring Requirements for Control Devices in § 63.11 No Subpart IIIII does not require flares.
    § 63.8(c)(1)(i) and (iii) CMS Operation and SSM Plan Yes Only applies until the date specified in § 63.8186(a)(3).
    § 63.8(c)(5) COMS Minimum Procedures No Subpart IIIII does not have opacity and visible emission standards.
    § 63.8(d)(3) Written Procedures for CMS No See § 63.8242(a)(3)(v).
    § 63.8(f)(6) Alternative to Relative Accuracy Test No Subpart IIIII does not require CEMS.
    § 63.8(g) Data Reduction No Subpart IIIII specifies mercury concentration CMS data reduction requirements.
    § 63.9(a)-(e), (g)-(j) Notification Requirements Yes
    § 63.9(f) Notification of VE/Opacity Test No Subpart IIIII does not have opacity and visible emission standards.
    § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).
    § 63.10(a); (b)(1); (b)(2)(vi)-(xii), (xiv); (b)(3); (c)(1)-(14); (d)(1), (4); (e); (f) Recordkeeping/Reporting Yes
    § 63.10(b)(2)(i)-(v) Recordkeeping/Reporting Associated with Startup, Shutdown, and Malfunctions Yes Only applies until the date specified in § 63.8186(a)(3).
    § 63.10(b)(2)(xiii) CMS Records for RATA Alternative No Subpart IIIII does not require CEMS.
    § 63.10(c)(15) Use of SSM Plan Yes Only applies until the date specified in § 63.8186(a)(3).
    § 63.10(d)(2) Performance Test Results No This subpart at 63.8232(g) specifies how and when the performance test results are reported electronically.
    § 63.10(d)(3) Reporting Opacity or VE Observations No Subpart IIIII does not have opacity and visible emission standards.
    § 63.10(d)(5) Startup, Shutdown, and Malfunction Reports No
    § 63.10(e)(2)(i) CEM Reporting Yes Except this subpart specifies how and when the performance evaluation results are reported.
    § 63.11 Flares No Subpart IIIII does not require flares.
    § 63.12 Delegation Yes
    § 63.13 Addresses Yes
    § 63.14 Incorporation by Reference Yes
    § 63.15 Availability of Information Yes

    [87 FR 27024, May 6, 2022]