Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart MMMMM - National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations |
Table 7 to Subpart MMMMM of Part 63 - Applicability of General Provisions to Subpart MMMMM
Latest version.
-
Table 7 to Subpart MMMMM of Part 63 - Applicability of General Provisions to Subpart MMMMM
As stated in § 63.8826, you must comply with the applicable General Provisions requirements according to the following table:
Citation Requirement Applies to subpart MMMMM Explanation § 63.1 Initial applicability determination; applicability after standard established; permit requirements; extensions; notifications Yes § 63.2 Definitions Yes Additional definitions are found in § 63.8830. § 63.3 Units and abbreviations Yes § 63.4 Prohibited activities; compliance date; circumvention, severability Yes § 63.5 Construction/reconstruction applicability; applications; approvals Yes § 63.6(a) Compliance with standards and maintenance requirements-applicability Yes § 63.6(b)(1)-(4) Compliance dates for new or reconstructed sources Yes § 63.8786 specifies compliance dates. § 63.6(b)(5) Notification if commenced construction or reconstruction after proposal Yes § 63.6(b)(6) [Reserved] Yes § 63.6(b)(7) Compliance dates for new or reconstructed area sources that become major Yes § 63.8786 specifies compliance dates. § 63.6(c)(1)-(2) Compliance dates for existing sources Yes § 63.8786 specifies compliance dates. § 63.6(c)(3)-(4) [Reserved] Yes § 63.6(c)(5) Compliance dates for existing area sources that become major Yes § 63.8786 specifies compliance dates. § 63.6(d) [Reserved] Yes § 63.6(e)(1)(i) General duty to minimize emissions No § 63.8794(c) specifies general duty requirements. § 63.6(e)(1)(ii) Requirement to correct malfunctions as soon as possible No § 63.6(e)(1)(iii) Enforceability of requirements independent of other regulations Yes § 63.6(e)(2) [Reserved] Yes § 63.6(e)(3) SSM plans No § 63.6(f)(1) Compliance except during SSM No § 63.6(f)(2)-(3) Methods for determining compliance Yes § 63.6(g) Use of an alternative nonopacity emission standard Yes § 63.6(h) Compliance with opacity/visible emission standards No Subpart MMMMM does not specify opacity or visible emission standards. § 63.6(i) Extension of compliance with emission standards Yes § 63.6(j) Presidential compliance exemption Yes § 63.7(a)(1)-(2) Performance test dates Yes Except for loop slitter affected sources as specified in § 63.8798(a). § 63.7(a)(3) Administrator's section 114 authority to require a performance test Yes § 63.7(b) Notification of performance test and rescheduling Yes § 63.7(c) Quality assurance program and site-specific test plans Yes § 63.7(d) Performance testing facilities Yes § 63.7(e)(1) Conditions for conducting performance tests No Requirements for performance test conditions are found in § 63.8800(b) and (c). § 63.7(e)(2)-(3) Performance test data reduction and number of test runs Yes § 63.7(f) Use of an alternative test method Yes § 63.7(g) Performance test data analysis, recordkeeping, and reporting Yes § 63.7(h) Waiver of performance tests Yes § 63.8(a)(1)-(2) Applicability of monitoring requirements Yes Unless otherwise specified, all of § 63.8 applies only to new or reconstructed flame lamination sources. Additional monitoring requirements for these sources are found in §§ 63.8794(f) and (g) and 63.8804. § 63.8(a)(3) [Reserved] Yes § 63.8(a)(4) Monitoring with flares No Subpart MMMMM does not refer directly or indirectly to § 63.11. § 63.8(b) Conduct of monitoring and procedures when there are multiple effluents and multiple monitoring systems Yes § 63.8(c)(1)-(3) Continuous monitoring system (CMS) operation and maintenance No CMS requirements are found in § 63.8794(f) and (g). § 63.8(c)(4) Continuous monitoring system requirements during breakdown, out-of-control, repair, maintenance, and high-level calibration drifts Yes Applies as modified by § 63.8794(g). § 63.8(c)(5) Continuous opacity monitoring system (COMS) minimum procedures No Subpart MMMMM does not have opacity or visible emission standards. § 63.8(c)(6) Zero and high-level calibration checks Yes Applies as modified by § 63.8794(f). § 63.8(c)(7)-(8) Out-of-control periods, including reporting Yes § 63.8(d)-(e) Quality control program and CMS performance evaluation No CMS requirements are found in § 63.8794(f) and (g). § 63.8(f)(1)-(5) Use of an alternative monitoring method Yes § 63.8(f)(6) Alternative to relative accuracy test No Only applies to sources that use continuous emissions monitoring systems (CEMS). § 63.8(g) Data reduction Yes Applies as modified by § 63.8794(g). § 63.9(a) Notification requirements - applicability Yes § 63.9(b) Initial notifications Yes Except § 63.8816(c) requires new or reconstructed affected sources to submit the application for construction or reconstruction required by § 63.9(b)(1)(iii) in lieu of the initial notification. § 63.9(c) Request for compliance extension Yes § 63.9(d) Notification that a new source is subject to special compliance requirements Yes § 63.9(e) Notification of performance test Yes § 63.9(f) Notification of visible emissions/opacity test No Subpart MMMMM does not have opacity or visible emission standards. § 63.9(g)(1) Additional CMS notifications - date of CMS performance evaluation Yes § 63.9(g)(2) Use of COMS data No Subpart MMMMM does not require the use of COMS. § 63.9(g)(3) Alternative to relative accuracy testing No Applies only to sources with CEMS. § 63.9(h) Notification of compliance status Yes § 63.9(i) Adjustment of submittal deadlines Yes § 63.9(j) Change in previous information Yes § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j). § 63.10(a) Recordkeeping/reporting applicability Yes § 63.10(b)(1) General recordkeeping requirements Yes §§ 63.8820 and 63.8822 specify additional recordkeeping requirements. § 63.10(b)(2)(i) and (ii) Records related to SSM periods and CMS No See § 63.8820 for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. § 63.10(b)(2)(iii) Records of maintenance on air pollution control equipment. Yes § 63.10(b)(2)(iv) and (v) Records related to SSM No § 63.10(b)(2)(vi)-(xi) Records of CMS and other compliance records Yes § 63.10(b)(2)(xii) Records when under waiver Yes § 63.10(b)(2)(xiii) Records when using alternative to relative accuracy test No Applies only to sources with CEMS. § 63.10(b)(2)(xiv) All documentation supporting initial notification and notification of compliance status Yes § 63.10(b)(3) Recordkeeping requirements for applicability determinations Yes § 63.10(c) Additional recordkeeping requirements for sources with CMS Yes Applies as modified by § 63.8794(g). § 63.10(d)(1) General reporting requirements Yes § 63.8818 specifies additional reporting requirements. § 63.10(d)(2) Performance test results Yes § 63.10(d)(3) Opacity or visible emissions observations No Subpart MMMMM does not specify opacity or visible emission standards. § 63.10(d)(4) Progress reports for sources with compliance extensions Yes § 63.10(d)(5) SSM reports No § 63.10(e)(1) Additional CMS reports - general Yes Applies as modified by § 63.8794(g). § 63.10(e)(2)(i) Results of CMS performance evaluations Yes Applies as modified by § 63.8794(g). § 63.10(e)(2) Results of continuous opacity monitoring systems performance evaluations No Subpart MMMMM does require the use of COMS. § 63.10(e)(3) Excess emissions/CMS performance reports Yes Only applies to new or reconstructed flame lamination affected sources. § 63.10(e)(4) Continuous opacity monitoring system data reports No Subpart MMMMM does not require the use of COMS. § 63.10(f) Recordkeeping/reporting waiver Yes § 63.11 Control device requirements - applicability No Facilities subject to subpart MMMMM do not use flares as control devices. § 63.12 State authority and delegations Yes § 63.8828 lists those sections of subparts MMMMM and A that are not delegated. § 63.13 Addresses Yes § 63.14 Incorporation by reference Yes Subpart MMMMM does not incorporate any material by reference. § 63.15 Availability of information/confidentiality. Yes [86 FR 64404, Nov. 18, 2021]