Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart RRRR - National Emission Standards for Hazardous Air Pollutants: Surface Coating of Metal Furniture |
Table 2 to Subpart RRRR of Part 63 - Applicability of General Provisions to Subpart RRRR
Latest version.
-
Table 2 to Subpart RRRR of Part 63 - Applicability of General Provisions to Subpart RRRR
[You must comply with the applicable General Provisions requirements according to the following table:]
Citation Subject Applicable to subpart Explanation § 63.1(a)(1)-(12) General Applicability Yes § 63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability to subpart RRRR is also specified in § 63.4881. § 63.1(c)(1) Applicability After Standard Established Yes § 63.1(c)(2)-(3) Applicability of Permit Program for Area Sources No Area sources are not subject to subpart RRRR. § 63.1(c)(4)-(5) Extensions and Notifications Yes § 63.1(c)(6) Reclassification Yes § 63.1(e) Applicability of Permit Program Before Relevant Standard is Set Yes § 63.2 Definitions Yes Additional definitions are specified in § 63.4981. § 63.3(a)-(c) Units and Abbreviations Yes § 63.4(a)(1)-(5) Prohibited Activities Yes § 63.4(b)-(c) Circumvention/Severability Yes § 63.5(a) Construction/Reconstruction Yes § 63.5(b)(1)-(6) Requirements for Existing, Newly Constructed, and Reconstructed Sources Yes § 63.5(d) Application for Approval of Construction/Reconstruction Yes § 63.5(e) Approval of Construction/Reconstruction Yes § 63.5(f) Approval of Construction/Reconstruction Based on Prior State Review Yes § 63.6(a) Compliance With Standards and Maintenance Requirements - Applicability Yes § 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes Section 63.4883 specifies the compliance dates. § 63.6(c)(1)-(5) Compliance Dates for Existing Sources Yes Section 63.4883 specifies the compliance dates. § 63.6(e)(1)(i) Operation and Maintenance Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4900(b) for general duty requirement. § 63.6(e)(1)(ii) Operation and Maintenance Yes, before September 12, 2019. No, on and after September 12, 2019 § 63.6(e)(1)(iii) Operation and Maintenance Yes § 63.6(e)(3) Startup, shutdown, and malfunction Plan (SSMP) Yes, before September 12, 2019. No, on and after September 12, 2019 § 63.6(f)(1) Compliance Except During Startup, Shutdown, and Malfunction Yes, before September 12, 2019. No, on and after September 12, 2019 § 63.6(f)(2)-(3) Methods for Determining Compliance Yes § 63.6(g)(1)-(3) Use of Alternative Standards Yes § 63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart RRRR does not establish opacity standards and does not require continuous opacity monitoring systems (COMS). § 63.6(i)(1)-(16) Extension of Compliance Yes § 63.6(j) Presidential Compliance Exemption Yes § 63.7(a)(1) Performance Test Requirements - Applicability Yes Applies to all affected sources using an add-on control device to comply with the standards. Additional requirements for performance testing are specified in §§ 63.4963, 63.4964, and 63.4965. § 63.7(a)(2) Performance Test Requirements - Dates Yes Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standards. Section 63.4960 specifies the schedule for performance test requirements that are earlier than those specified in § 63.7(a)(2). § 63.7(a)(3) Performance Tests Required by the Administrator Yes § 63.7(b)-(d) Performance Test Requirements - Notification, Quality Assurance, Facilities Necessary Safe Testing, Conditions During Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards. § 63.7(e)(1) Conduct of performance tests Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4963(a). § 63.7(e)(2)-(4) Conduct of performance tests Yes. § 63.7(f) Performance Test Requirements - Use of Alternative Test Method Yes Applies to all test methods except those used to determine capture system efficiency. § 63.7(g)-(h) Performance Test Requirements - Data Analysis, Recordkeeping, Reporting, Waiver of Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards. § 63.8(a)(1)-(3) Monitoring Requirements - Applicability Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for monitoring are specified in § 63.4967. § 63.8(a)(4) Additional Monitoring Requirements No Subpart RRRR does not have monitoring requirements for flares. § 63.8(b) Conduct of Monitoring Yes § 63.8(c)(1) Continuous Monitoring Systems (CMS) Operation and Maintenance Yes, before September 12, 2019. No, on and after September 12, 2019 § 63.8(c)(2)-(3) CMS Operation and Maintenance Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for CMS operations and maintenance are specified in § 63.4967. § 63.8(c)(4) CMS No Section 63.4967 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply. § 63.8(c)(5) COMS No Subpart RRRR does not have opacity or visible emissions standards. § 63.8(c)(6) CMS Requirements No Section 63.4967 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply. § 63.8(c)(7) CMS Out-of-Control Periods Yes § 63.8(c)(8) CMS Out-of-Control Periods Reporting No Section 63.4920 requires reporting of CMS out-of-control periods. § 63.8(d)-(e) Quality Control Program and CMS Performance Evaluation No Subpart RRRR does not require the use of CEMS. § 63.8(f)(1)-(5) Use of an Alternative Monitoring Method Yes. § 63.8(f)(6) Alternative to Relative Accuracy Test No Subpart RRRR does not require the use of CEMS. § 63.8(g)(1)-(5) Data Reduction No Sections 63.4966 and 63.4967 specify monitoring data reduction. § 63.9(a)-(d) Notification Requirements Yes § 63.9(e) Notification of Performance Test Yes Applies only to capture system and add-on control device performance tests at sources using these to comply with the standards. § 63.9(f) Notification of Visible Emissions/Opacity Test No Subpart RRRR does not have opacity or visible emission standards. § 63.9(g)(1)-(3) Additional Notifications When Using CMS No Subpart RRRR does not require the use of CEMS. § 63.9(h) Notification of Compliance Status Yes Section 63.4910 specifies the dates for submitting the notification of compliance status. § 63.9(i) Adjustment of Submittal Deadlines Yes § 63.9(j) Change in Previous Information Yes § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j). § 63.10(a) Recordkeeping/Reporting - Applicability and General Information Yes § 63.10(b)(1) General Recordkeeping Requirements Yes Additional requirements are specified in §§ 63.4930 and 63.4931. § 63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4930(j). § 63.10(b)(2)(ii) Recordkeeping of Failures to Meet Standards Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4930(j). § 63.10(b)(2)(iii) Recordkeeping Relevant to Maintenance of Air Pollution Control and Monitoring Equipment Yes § 63.10(b)(2)(iv)- (v) Actions Taken to Minimize Emissions During SSM Yes, before September 12, 2019.
No, on and after September 12, 2019See § 63.4930(j)(4) for a record of actions taken to minimize emissions during a deviation from the standard. § 63.10(b)(2)(vi) Recordkeeping for CMS malfunctions Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4930(j) for records of periods of deviation from the standard, including instances where a CMS is inoperative or out-of-control. § 63.10(b)(2)(vii)-(xi) Records Yes § 63.10(b)(2)(xii) Records Yes § 63.10(b)(2)(xiii) No Subpart RRRR does not require the use of CEMS. § 63.10(b)(2)(xiv) Yes § 63.10(b)(3) Recordkeeping Requirements for Applicability Determinations Yes § 63.10(c)(1)-(6) Additional Recordkeeping Requirements for Sources with CMS Yes § 63.10(c)(7)-(8) Additional Recordkeeping Requirements for Sources with CMS No See § 63.4930(j)(1) for records of periods of deviation from the standard, including instances where a CMS is inoperative or out-of-control. § 63.10(c)(10)-(14) Additional Recordkeeping Requirements for Sources with CMS Yes § 63.10(c)(15) Records Regarding the SSMP Yes, before September 12, 2019. No, on and after September 12, 2019 § 63.10(d)(1) General Reporting Requirements Yes Additional requirements are specified in § 63.4920. § 63.10(d)(2) Report of Performance Test Results Yes Additional requirements are specified in § 63.4920(b). § 63.10(d)(3) Reporting Opacity or Visible Emissions Observations No Subpart RRRR does not require opacity or visible emissions observations. § 63.10(d)(4) Progress Reports for Sources With Compliance Extensions Yes § 63.10(d)(5) Startup, Shutdown, and Malfunction Reports Yes, before September 12, 2019. No, on and after September 12, 2019 See § 63.4920(a)(7). § 63.10(e)(1)-(2) Additional CMS Reports No Subpart RRRR does not require the use of CEMS. § 63.10(e)(3) Excess Emissions/CMS Performance Reports No Section 63.4920(a) specifies the contents of periodic compliance reports. § 63.10(e)(4) COMS Data Reports No Subpart RRRR does not specify requirements for opacity or COMS. § 63.10(f) Recordkeeping/Reporting Waiver Yes § 63.11 Control Device Requirements/Flares No Subpart RRRR does not specify use of flares for compliance. § 63.12 State Authority and Delegations Yes § 63.13 Addresses Yes § 63.14 Incorporation by Reference Yes § 63.15 Availability of Information/Confidentiality Yes [84 FR 9642, Mar. 15, 2019, as amended at 85 FR 73908, Nov. 19, 2020]