Table 2 to Subpart RRRRR of Part 63 - —Mercury Emission Limits for Indurating Furnaces  


Latest version.
  • Table 2 to Subpart RRRRR of Part 63 - Applicability of General Provisions to Subpart RRRRR of Part 63

    As required in § 63.9650, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table:

    Citation Subject Applies to subpart RRRRR Explanation
    § 63.1(a)(1)-(4) Applicability Yes
    § 63.1(a)(5) [Reserved] No
    § 63.1(a)(6) Applicability Yes
    § 63.1(a)(7)-(9) [Reserved] No
    § 63.1(a)(10)-(12) Applicability Yes
    § 63.1(b)(1) Initial Applicability Determination Yes
    § 63.1(b)(2) [Reserved] No
    § 63.1(b)(3) Initial Applicability Determination Yes
    § 63.1(c)(1)-(2) Applicability After Standard Established, Permit Requirements Yes
    § 63.1(c)(3)-(4) [Reserved] No
    § 63.1(c)(5) Area Source Becomes Major Yes
    § 63.1(c)(6) Reclassification Yes
    § 63.1(d) [Reserved] No
    § 63.1(e) Equivalency of Permit Limits Yes
    § 63.2 Definitions Yes
    § 63.3(a)-(c) Units and Abbreviations Yes
    § 63.4(a)(1)-(2) Prohibited Activities Yes
    § 63.4(a)(3)-(5) [Reserved] No
    § 63.4(b)-(c) Circumvention, Fragmentation Yes
    § 63.5(a)(1)-(2) Construction/Reconstruction, Applicability Yes
    § 63.5(b)(1) Construction/Reconstruction, Applicability Yes
    § 63.5(b)(2) [Reserved] No
    § 63.5(b)(3)-(4) Construction/Reconstruction, Applicability Yes
    § 63.5(b)(5) [Reserved] No
    § 63.5(b)(6) Applicability Yes
    § 63.5(c) [Reserved] No
    § 63.5(d)(1)-(4) Application for Approval of Construction or Reconstruction Yes
    § 63.5(e) Approval of Construction or Reconstruction Yes
    § 63.5(f) Approval Based on State Review Yes
    § 63.6(a) Compliance with Standards and Maintenance Requirements Yes
    § 63.6(b)(1)-(5) Compliance Dates for New/Reconstructed Sources Yes
    § 63.6(b)(6) [Reserved] No
    § 63.6(b)(7) Compliance Dates for New/Reconstructed Sources Yes
    § 63.6(c)(1)-(2) Compliance Dates for Existing Sources Yes
    § 63.6(c)(3)-(4) [Reserved] No
    § 63.6(c)(5) Compliance Dates for Existing Sources Yes
    § 63.6(d) [Reserved] No
    § 63.6(e)(1)(i) Operation and Maintenance Requirements - General Duty to Minimize Emissions Yes, on or before the compliance date specified in § 63.9600(a). No, after the compliance date specified in § 63.9600(a) See § 63.9600(a) for general duty requirement.
    § 63.6(e)(1)(ii) Operation and Maintenance Requirements - Requirement to Correct Malfunction as Soon as Possible No
    § 63.6(e)(1)(iii) Operation and Maintenance Requirements - Enforceability Yes
    § 63.6(e)(2) [Reserved] No
    § 63.6(e)(3) Startup, Shutdown, Malfunction (SSM) Plan Yes, on or before the compliance date specified in § 63.9610(c). No, after the compliance date specified in § 63.9610(c)
    § 63.6(f)(1) SSM Exemption No See § 63.9600(a).
    § 63.6(f)(2)-(3) Methods for Determining Compliance Yes
    § 63.6(g)(1)-(3) Alternative Nonopacity Standard Yes
    § 63.6(h), except (h)(1) Compliance with Opacity and Visible Emission (VE) Standards No Opacity limits in subpart RRRRR are established as part of performance testing in order to set operating limits for ESPs.
    § 63.6(h)(1) Compliance except during SSM No See § 63.9600(a).
    § 63.6(i)(1)-(14) Extension of Compliance Yes
    § 63.6(i)(15) [Reserved] No
    § 63.6(i)(16) Extension of Compliance Yes
    § 63.6(j) Presidential Compliance Exemption Yes
    § 63.7(a)(1)-(2) Applicability and Performance Test Dates No Subpart RRRRR specifies performance test applicability and dates.
    § 63.7(a)(3)-(4) Performance Testing Requirements Yes
    § 63.7(b) Notification Yes
    § 63.7(c) Quality Assurance/Test Plan Yes
    § 63.7(d) Testing Facilities Yes
    § 63.7(e)(1) Conduct of Performance Tests No See § 63.9621.
    § 63.7(e)(2)-(4) Conduct of Performance Tests Yes
    § 63.7(f) Alternative Test Method Yes
    § 63.7(g) Data Analysis Yes Except this subpart specifies how and when the performance test results are reported.
    § 63.7(h) Waiver of Tests Yes
    § 63.8(a)(1)-(2) Monitoring Requirements Yes
    § 63.8(a)(3) [Reserved] No
    § 63.8(a)(4) Additional Monitoring Requirements for Control Devices in § 63.11 No Subpart RRRRR does not require flares.
    § 63.8(b)(1)-(3) Conduct of Monitoring Yes
    § 63.8(c)(1)(i) Operation and Maintenance of CMS Yes, on or before the compliance date specified in § 63.9632(b)(4). No, after the compliance date specified in § 63.9632(b)(4) See § 63.9632 for operation and maintenance requirements for monitoring. See § 63.9600(a) for general duty requirement.
    § 63.8(c)(1)(ii) Spare parts for CMS Equipment Yes
    § 63.8(c)(1)(iii) SSM Plan for CMS Yes, on or before the compliance date specified in § 63.9632(b)(4). No, after the compliance date specified in § 63.9632(b)(4)
    § 63.8(c)(2)-(3) CMS Operation/Maintenance Yes
    § 63.8(c)(4) Frequency of Operation for CMS No Subpart RRRRR specifies requirements for operation of CMS.
    § 63.8(c)(5)-(8) CMS Requirements Yes CMS requirements in § 63.8(c)(5) and (6) apply only to COMS for dry electrostatic precipitators.
    § 63.8(d)(1)-(2) Monitoring Quality Control Yes
    § 63.8(d)(3) Monitoring Quality Control No See § 63.9632(b)(5).
    § 63.8(e) Performance Evaluation of CMS Yes
    § 63.8(f)(1)-(5) Alternative Monitoring Method Yes
    § 63.8(f)(6) Relative Accuracy Test Alternative (RATA) No Subpart RRRRR does not require continuous emission monitoring systems.
    § 63.8(g)(1)-(4) Data Reduction Yes
    § 63.8(g)(5) Data That Cannot Be Used No Subpart RRRRR specifies data reduction requirements.
    § 63.9 Notification Requirements Yes Additional notifications for CMS in § 63.9(g) apply to COMS for dry electrostatic precipitators.
    § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).
    § 63.10(a) Recordkeeping and Reporting, Applicability and General Information Yes
    § 63.10(b)(1) General Recordkeeping Requirements Yes
    § 63.10(b)(2)(i) Records of SSM No See § 63.9642 for recordkeeping when there is a deviation from a standard.
    § 63.10(b)(2)(ii) Recordkeeping of Failures to Meet Standard No See § 63.9642 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
    § 63.10(b)(2)(iii) Maintenance Records Yes
    § 63.10(b)(2)(iv) Actions Taken to Minimize Emissions During SSM No
    § 63.10(b)(2)(v) Actions Taken to Minimize Emissions During SSM No
    § 63.10(b)(2)(vi) Recordkeeping for CMS Malfunctions Yes
    § 63.10(b)(2)(vii)-(xii) Recordkeeping for CMS Yes
    § 63.10(b)(2)(xiii) Records for Relative Accuracy Test No Subpart RRRRR does not require continuous emission monitoring systems.
    § 63.10(b)(2)(xiv) Records for Notification Yes
    § 63.10(b)(3) Applicability Determinations Yes
    § 63.10(c)(1)-(6) Additional Recordkeeping Requirements for Sources with CMS Yes
    § 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Exceedances for CMS No Subpart RRRRR specifies recordkeeping requirements.
    § 63.10(c)(9) [Reserved] No
    § 63.10(c)(10)-(14) CMS Recordkeeping Yes
    § 63.10(c)(15) Use of SSM Plan No
    § 63.10(d)(1)-(2) General Reporting Requirements Yes Except this subpart specifies how and when the performance test results are reported.
    § 63.10(d)(3) Reporting opacity or VE observations No Subpart RRRRR does not have opacity and VE standards that require the use of EPA Method 9 of appendix A-4 to 40 CFR part 60 or EPA Method 22 of appendix A-7 to 40 CFR part 60.
    § 63.10(d)(5) SSM Reports Yes, on or before the compliance date specified in § 63.9641(b)(4). No, after the compliance date specified in § 63.9641(b)(4) See § 63.9641 for malfunction reporting requirements.
    § 63.10(e) Additional Reporting Requirements Yes, except a breakdown of the total duration of excess emissions due to startup/shutdown in 63.10(e)(3)(vi)(I) is not required and when the summary report is submitted through CEDRI, the report is not required to be titled “Summary Report-Gaseous and Opacity Excess Emission and Continuous Monitoring System Performance.” The electronic reporting template combines the information from the summary report and excess emission report with the Subpart RRRRR compliance report.
    § 63.10(f) Waiver of Recordkeeping or Reporting Requirements Yes
    § 63.11 Control Device and Work Practice Requirements No Subpart RRRRR does not require flares.
    § 63.12(a)-(c) State Authority and Delegations Yes
    § 63.13(a)-(c) State/Regional Addresses Yes
    § 63.14(a)-(t) Incorporations by Reference Yes
    § 63.15(a)-(b) Availability of Information and Confidentiality Yes
    § 63.16 Performance Track Provisions Yes

    [85 FR 45501, July 28, 2020, as amended at 85 FR 73917, Nov. 19, 2020]