Table 2 to Subpart X of Part 63 - Emissions Limits for Secondary Lead Smelting Furnaces  


Latest version.
  • Table 2 to Subpart X of Part 63 - Emissions Limits for Secondary Lead Smelting Furnaces

    For vents from these processes . . . You must meet the following emissions limits . . .a
    Total hydrocarbon ppm by volume expressed as propane corrected to 4 percent carbon dioxide Dioxin and furan (dioxins and furans) nanograms/dscm
    expressed as TEQ corrected to
    7 percent O2
    Collocated blast and reverberatory furnaces (new and existing) 20 ppmv 0.50 ng/dscm.
    Collocated blast and reverberatory furnaces when the reverberatory furnace is not operating for units that comments construction or reconstruction before June 9, 1994 360 ppmv 170 ng/dscm.
    Collocated blast and reverberatory furnaces when the reverberatory furnace is not operating for units that commence construction or reconstruction after June 9, 1994 70 ppmv 170 ng/dscm.
    Blast furnaces that commence construction or reconstruction before June 9, 1994 360 ppmv 170 ng/dscm.
    Blast furnaces that commence construction or reconstruction after June 9, 1994 70 ppmv 170 ng/dscm.
    Blast furnaces that commence construction or reconstruction after May 19, 2011 70 ppmv 10 ng/dscm.
    Reverberatory and electric furnaces that commence construction or reconstruction before May 19, 2011 12 ppmv 0.20 ng/dscm.
    Reverberatory and electric furnaces that commence construction or reconstruction after May 19, 2011 12 ppmv 0.10 ng/dscm.