Table 8 to Subpart ZZZZ of Part 63 - —Applicability of General Provisions to Subpart ZZZZ  


Latest version.
  • Table 8 to Subpart ZZZZ of Part 63 - Applicability of General Provisions to Subpart ZZZZ.

    As stated in § 63.6665, you must comply with the following applicable general provisions.

    General provisions citation Subject of citation Applies to subpart Explanation
    § 63.1 General applicability of the General Provisions Yes.
    § 63.2 Definitions Yes Additional terms defined in § 63.6675.
    § 63.3 Units and abbreviations Yes.
    § 63.4 Prohibited activities and circumvention Yes.
    § 63.5 Construction and reconstruction Yes.
    § 63.6(a) Applicability Yes.
    § 63.6(b)(1)-(4) Compliance dates for new and reconstructed sources Yes.
    § 63.6(b)(5) Notification Yes.
    § 63.6(b)(6) [Reserved]
    § 63.6(b)(7) Compliance dates for new and reconstructed area sources that become major sources Yes.
    § 63.6(c)(1)-(2) Compliance dates for existing sources Yes.
    § 63.6(c)(3)-(4) [Reserved]
    § 63.6(c)(5) Compliance dates for existing area sources that become major sources Yes.
    § 63.6(d) [Reserved]
    § 63.6(e) Operation and maintenance No.
    § 63.6(f)(1) Applicability of standards No.
    § 63.6(f)(2) Methods for determining compliance Yes.
    § 63.6(f)(3) Finding of compliance Yes.
    § 63.6(g)(1)-(3) Use of alternate standard Yes.
    § 63.6(h) Opacity and visible emission standards No Subpart ZZZZ does not contain opacity or visible emission standards.
    § 63.6(i) Compliance extension procedures and criteria Yes.
    § 63.6(j) Presidential compliance exemption Yes.
    § 63.7(a)(1)-(2) Performance test dates Yes Subpart ZZZZ contains performance test dates at §§ 63.6610, 63.6611, and 63.6612.
    § 63.7(a)(3) CAA section 114 authority Yes.
    § 63.7(b)(1) Notification of performance test Yes Except that § 63.7(b)(1) only applies as specified in § 63.6645.
    § 63.7(b)(2) Notification of rescheduling Yes Except that § 63.7(b)(2) only applies as specified in § 63.6645.
    § 63.7(c) Quality assurance/test plan Yes Except that § 63.7(c) only applies as specified in § 63.6645.
    § 63.7(d) Testing facilities Yes.
    § 63.7(e)(1) Conditions for conducting performance tests No. Subpart ZZZZ specifies conditions for conducting performance tests at § 63.6620.
    § 63.7(e)(2) Conduct of performance tests and reduction of data Yes Subpart ZZZZ specifies test methods at § 63.6620.
    § 63.7(e)(3) Test run duration Yes.
    § 63.7(e)(4) Administrator may require other testing under section 114 of the CAA Yes.
    § 63.7(f) Alternative test method provisions Yes.
    § 63.7(g) Performance test data analysis, recordkeeping, and reporting Yes.
    § 63.7(h) Waiver of tests Yes.
    § 63.8(a)(1) Applicability of monitoring requirements Yes Subpart ZZZZ contains specific requirements for monitoring at § 63.6625.
    § 63.8(a)(2) Performance specifications Yes.
    § 63.8(a)(3) [Reserved]
    § 63.8(a)(4) Monitoring for control devices No.
    § 63.8(b)(1) Monitoring Yes.
    § 63.8(b)(2)-(3) Multiple effluents and multiple monitoring systems Yes.
    § 63.8(c)(1) Monitoring system operation and maintenance Yes.
    § 63.8(c)(1)(i) Routine and predictable SSM No
    § 63.8(c)(1)(ii) SSM not in Startup Shutdown Malfunction Plan Yes.
    § 63.8(c)(1)(iii) Compliance with operation and maintenance requirements No
    § 63.8(c)(2)-(3) Monitoring system installation Yes.
    § 63.8(c)(4) Continuous monitoring system (CMS) requirements Yes Except that subpart ZZZZ does not require Continuous Opacity Monitoring System (COMS).
    § 63.8(c)(5) COMS minimum procedures No Subpart ZZZZ does not require COMS.
    § 63.8(c)(6)-(8) CMS requirements Yes Except that subpart ZZZZ does not require COMS.
    § 63.8(d) CMS quality control Yes.
    § 63.8(e) CMS performance evaluation Yes Except for § 63.8(e)(5)(ii), which applies to COMS.
    Except that § 63.8(e) only applies as specified in § 63.6645.
    § 63.8(f)(1)-(5) Alternative monitoring method Yes Except that § 63.8(f)(4) only applies as specified in § 63.6645.
    § 63.8(f)(6) Alternative to relative accuracy test Yes Except that § 63.8(f)(6) only applies as specified in § 63.6645.
    § 63.8(g) Data reduction Yes Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§ 63.6635 and 63.6640.
    § 63.9(a) Applicability and State delegation of notification requirements Yes.
    § 63.9(b)(1)-(5) Initial notifications Yes Except that § 63.9(b)(3) is reserved.
    Except that § 63.9(b) only applies as specified in § 63.6645.
    § 63.9(c) Request for compliance extension Yes Except that § 63.9(c) only applies as specified in § 63.6645.
    § 63.9(d) Notification of special compliance requirements for new sources Yes Except that § 63.9(d) only applies as specified in § 63.6645.
    § 63.9(e) Notification of performance test Yes Except that § 63.9(e) only applies as specified in § 63.6645.
    § 63.9(f) Notification of visible emission (VE)/opacity test No Subpart ZZZZ does not contain opacity or VE standards.
    § 63.9(g)(1) Notification of performance evaluation Yes Except that § 63.9(g) only applies as specified in § 63.6645.
    § 63.9(g)(2) Notification of use of COMS data No Subpart ZZZZ does not contain opacity or VE standards.
    § 63.9(g)(3) Notification that criterion for alternative to RATA is exceeded Yes If alternative is in use.
    Except that § 63.9(g) only applies as specified in § 63.6645.
    § 63.9(h)(1)-(6) Notification of compliance status Yes Except that notifications for sources using a CEMS are due 30 days after completion of performance evaluations. § 63.9(h)(4) is reserved.
    Except that § 63.9(h) only applies as specified in § 63.6645.
    § 63.9(i) Adjustment of submittal deadlines Yes.
    § 63.9(j) Change in previous information Yes.
    § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).
    § 63.10(a) Administrative provisions for recordkeeping/reporting Yes.
    § 63.10(b)(1) Record retention Yes Except that the most recent 2 years of data do not have to be retained on site.
    § 63.10(b)(2)(i)-(v) Records related to SSM No.
    § 63.10(b)(2)(vi)-(xi) Records Yes.
    § 63.10(b)(2)(xii) Record when under waiver Yes.
    § 63.10(b)(2)(xiii) Records when using alternative to RATA Yes For CO standard if using RATA alternative.
    § 63.10(b)(2)(xiv) Records of supporting documentation Yes.
    § 63.10(b)(3) Records of applicability determination Yes.
    § 63.10(c) Additional records for sources using CEMS Yes Except that § 63.10(c)(2)-(4) and (9) are reserved.
    § 63.10(d)(1) General reporting requirements Yes.
    § 63.10(d)(2) Report of performance test results Yes.
    § 63.10(d)(3) Reporting opacity or VE observations No Subpart ZZZZ does not contain opacity or VE standards.
    § 63.10(d)(4) Progress reports Yes.
    § 63.10(d)(5) Startup, shutdown, and malfunction reports No.
    § 63.10(e)(1) and (2)(i) Additional CMS Reports Yes.
    § 63.10(e)(2)(ii) COMS-related report No Subpart ZZZZ does not require COMS.
    § 63.10(e)(3) Excess emission and parameter exceedances reports Yes. Except that § 63.10(e)(3)(i) (C) is reserved.
    § 63.10(e)(4) Reporting COMS data No Subpart ZZZZ does not require COMS.
    § 63.10(f) Waiver for recordkeeping/reporting Yes.
    § 63.11 Flares No.
    § 63.12 State authority and delegations Yes.
    § 63.13 Addresses Yes.
    § 63.14 Incorporation by reference Yes.
    § 63.15 Availability of information Yes.

    [75 FR 9688, Mar. 3, 2010, as amended at 78 FR 6720, Jan. 30, 2013; 85 FR 73912, Nov. 19, 2020]