§ 3405.202 - Exceptions.  


Latest version.
  • 3405.202 Exceptions.

    (a) (15) FSA - Issuance of a synopsis is not required when the firm to be solicited has previously provided a module for the system under a contract that contained cost, schedule, and performance goals and the contractor met those goals.