§ 216.163 - Mitigation.  


Latest version.
  • (a) Under a Letter of Authorization issued pursuant to §216.106, the U.S. Navy may incidentally, but not intentionally, take marine mammals in the course of the activity described in §216.161(a) provided all requirements of these regulations and such Letter of Authorization are met.

    (b) The activity identified in paragraph §216.161(a) of this section must be conducted in a manner that minimizes, to the greatest extent practicable, adverse impacts on marine mammals and their habitat. When detonating explosives, the following mitigation measures must be implemented:

    (1) Except as provided under the following paragraph (2), if any marine mammals are visually detected within the designated 3.5 nm (6.5 km) Safety Range surrounding the USS MESA VERDE, detonation must be delayed until the marine mammals are positively resighted outside the Safety Range either due to the animal(s) swimming out of the Safety Range or due to the Safety Range moving beyond the mammal's last verified location.

    (2) If a North Atlantic right whale or other marine mammal listed under the Endangered Species Act (ESA) is seen within the Safety Range, detonation must not occur until the animal is positively resighted outside the Safety Range and at least one additional aerial monitoring of the Safety Range shows that no other right whales or other ESA-listed marine mammals are present;

    (3) If the sea state exceeds 3 on the Beaufort scale (i.e., whitecaps on 33 to 50 percent of surface; 2 ft (0.6 m) to 3 ft (0.9 m) waves), the visibility is equal to or less than 3 nm (5.6 km), or the aircraft ceiling (i.e., vertical visibility) is equal to or less than 1,000 ft (305 m), detonation must not occur until conditions improve sufficiently for aerial surveillance to be undertaken.

    (4) A detonation must not be conducted earlier than 3 hours after sunrise or later than 3 hours prior to sunset to ensure adequate daylight for conducting the pre-detonation and post-detonation monitoring requirements in §216.165;

    (5) If post-detonation surveys determine that an injury or lethal take of a marine mammal has occurred,

    (i) the Director, Office of Protected Resources, National Marine Fisheries Service must be notified within 24 hours of the taking determination,

    (ii) the FSST procedures and monitoring methods must be reviewed in coordination with the National Marine Fisheries Service, and

    (iii) appropriate changes to avoid future injury or mortality must be made prior to conducting the next detonation.