§ 1794.60 - Normal sequence.  


Latest version.
  • For proposed actions requiring an EIS (see §1794.25), the NEPA process shall proceed in the same manner as for proposed actions requiring an EA with scoping through the point at which the scoping process is completed (see §1794.52).