97-7075. Rewrite of the NASA FAR Supplement (NFS)  

  • [Federal Register Volume 62, Number 57 (Tuesday, March 25, 1997)]
    [Rules and Regulations]
    [Pages 14016-14035]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-7075]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
    
    48 CFR Parts 1803, 1805, 1812, 1815, 1835, 1842, 1843, 1844, 1846, 
    1847, 1848, 1849, 1850, 1851, and 1852
    
    
    Rewrite of the NASA FAR Supplement (NFS)
    
    AGENCY: Office of Procurement, National Aeronautics and Space 
    Administration (NASA).
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Parts 1842 through 1851, except 1845, and clauses affected by 
    these parts are revised in their entirety. Part 1815, Contracting by 
    Negotiation, is revised by relocating the existing coverage on source 
    selection evaluation plans from 1815.612-70(g) to a new separately 
    titled section 1815.605-71, and by establishing a new section 1815.612, 
    Formal source selection. The revision to part 1842 also incorporates 
    the changes published as a proposed rule (61 FR 55264-55266, October 
    25, 1996). No public comments were received in response to the proposed 
    rule, and the proposed changes are adopted as final except for the 
    deletion of extraneous paragraph 1842.7201(d). Also included in this 
    final rule are editorial changes to 1803 and 1815; a revision to 
    1805.402 to reflect the prohibition in FAR 15.1005(f) on preaward 
    disclosure of the identify of offerors; a change to 1812 to authorize 
    use of an NFS contract clause in commercial acquisitions; and the 
    adoption as final rule the proposed changes to 1852.223-70 and 
    1852.247-73 described in the proposed rule to eliminate non-statutory 
    contractor certification requirements (61 FR 66643-66646).
    
    EFFECTIVE DATE: March 25, 1997.
    
    FOR FURTHER INFORMATION CONTACT:
    Tom O'Toole, (202) 358-0478.
    
    SUPPLEMENTARY INFORMATION:
    
    Background
    
        The National Performance Review urged agencies to streamline and 
    clarify their regulations. The NFS rewrite initiative was established 
    to pursue these goals by conducting a section by section review of the 
    NFS to verify its accuracy, relevancy, and validity. The NFS will be 
    rewritten in blocks of parts. Upon completion of all parts, the NFS 
    will be reissued in a new edition.
    
    Impact
    
        NASA certifies that this regulation will not have a significant 
    impact on a substantial number of small entities under the Regulatory 
    Flexibility Act (5 U.S.C. 602 et seq.). This rule does not impose any 
    reporting or record keeping requirements subject to the Paperwork 
    Reduction Act.
    
    List of Subjects in 48 CFR Parts 1803, 1805, 1812, 1815, 1835, 
    1842, 1843, 1844, 1846, 1847, 1848, 1849, 1850, 1851, and 1852
    
        Government procurement.
    Tom Luedtke,
    Deputy Associate Administrator for Procurement.
    
        Accordingly, 48 CFR Parts 1803, 1805, 1812, 1815, 1835, 1842, 1843, 
    1844, 1846, 1847, 1848, 1849, 1850, 1851, and 1852 are amended as 
    follows:
        1. The authority citation for 48 CFR 1803, 1805, 1812, 1815, 1835, 
    1842, 1843, 1844, 1846, 1847, 1849, 1850, 1851, and 1852 continues to 
    read as follows:
    
        Authority: U.S.C. 2473(c)(1).
    
    PART 1803--IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF 
    INTEREST
    
    
    1803.101-1  [Amended]
    
        2. The first sentence in section 1803.101-1 is revised to read as 
    follows:
    
    
    1803.101-1  General.
    
        The statutory prohibitions and their application to NASA personnel 
    are discussed in the Standards of Ethical Conduct for Employees of the 
    Executive Branch, 5 CFR part 2635, and the Supplemental Standards of 
    Ethical Conduct for Employees of the National Aeronautics and Space 
    Administration, 5 CFR part 6901.* * *
    
    
    1803.101-2  [Amended]
    
        3. In section 1803.101-2, the phrase ``(See Standards of Conduct 
    for NASA Employees, NHB 1900.1.)'' is removed.
    
    
    1803.104-5  [Amended]
    
        4. In paragraph (d)(1)(A) of section 1803.104-5, the phrase ``under 
    1870.303, App. I,'' is revised to read ``(see 1815.612-70)''.
    
    PART 1805--PUBLICIZING CONTRACT ACTIONS
    
    
    1805.402  [Amended]
    
        5. Section 1805.402 is revised to read as follows:
    
    
    1805.402  General public. (NASA paragraphs (1) and (2))
    
        (1) Unless the head of the contracting activity determines that 
    disclosure would be prejudicial to the interests of NASA, the following 
    information on NASA acquisitions may be released:
        (i) The names of firms invited to submit offers, and
    
    [[Page 14017]]
    
        (iii) The names of firms that attended any pre-bid or pre-proposal 
    conferences.
        (2) Other requests for information under the Freedom of Information 
    Act shall be processed in accordance with FAR 24.2 and 1824.2.
    
    PART 1812--ACQUISITION OF COMMERCIAL ITEMS
    
    
    1812.301  [Amended]
    
        6. In section 1812.301, a new paragraph (f)(i)(J) is added to read 
    as follows:
    
    
    1812.301  Solicitation provisions and contract clauses for the 
    acquisition of commercial items. (NASA Supplement paragraph (f))
    
        (f)(i) * * *
        (J) 1852.246-72, Material Inspection and Receiving Report. * * *
    
    PART 1815--CONTRACTING BY NEGOTIATION
    
    
    1815.605-71  [Added]
    
        7. Section 1815.605-71 is added to read as follows:
    
    
    1815.605-71  Source selection evaluation plan.
    
        (a) A source selection evaluation plan shall be prepared for each 
    source selection. The plan shall include, as a minimum the general and 
    specific evaluation guidelines (and special standards of 
    responsibility, where applicable) established to assess each offeror's 
    proposal against the RFP evaluation factors, subfactors, and elements. 
    The evaluation guidelines are designed to focus the evaluators' 
    assessment. They are not weighted and are not listed in the RFP. 
    However, the substance of the guidelines may be included in a narrative 
    description of the subfactors and elements. In addition, the plan 
    includes the system used in conducting the evaluation (and scoring, if 
    applicable) of each offeror's proposal.
        (b) The source selection evaluation plan shall be approved by the 
    source selection authority or other personnel designated in accordance 
    with installation procedures before the formal RFP is issued.
        (c) For formal source selections, see 1815.612(c).
    
    
    1815.612  [Added]
    
        8. Section 1815.612 is added to read as follows:
    
    
    1815.612  Formal source selection. (NASA supplements paragraph (c))
    
        (c) The requirement for a source selection evaluation plan may be 
    satisfied by incorporating the information required by 1815.605-71 into 
    the source selection plan. The consolidated plan shall be approved by 
    the source selection authority.
    
    
    1815.612-70  [Amended]
    
        9. In section 1815.612-70, the designated paragraph (g) is removed, 
    and the designated paragraphs (h) through (k) are redesignated as 
    paragraphs (g) though (j).
    
    PART 1835--RESEARCH AND DEVELOPMENT CONTRACTING
    
    
    1835.016-70  [Amended]
    
        10. In paragraph (b)(2) of section 1835.016-70, the citation 
    ``1815.201'' is revised to read ``1805.201''.
        11. Part 1842 is revised to read as follows:
    
    PART 1842--CONTRACT ADMINISTRATION
    
    Subpart 1842.1--Interagency Contract Administration and Audit Services
    
    1842.101  Policy.
    1842.102  Procedures.
    1842.102-70  Review of administration and audit services.
    1842.170  Assignment of NASA personnel at contractor plants.
    
    Subpart 1842.2--Assignment of Contract Administration
    
    1842.202  Assignment of contract administration.
    1842.203  Retention of contract administration.
    1842.270  Contracting officer technical representative (COTR) 
    delegations.
    1842.271  NASA clause.
    
    Subpart 1842.5--Postaward Orientation
    
    1842.503  Postaward conferences.
    
    Subpart 1842.7--Indirect Cost Rates
    
    1842.705  Final indirect cost rates.
    1842.705-1  Contracting officer determination procedure.
    1842.708  Quick-closeout procedure.
    1842.708-70  NASA quick-closeout procedure.
    
    Subpart 1842.8--Disallowance of Costs
    
    1842.803  Disallowing costs after incurrence.
    
    Subpart 1842.12--Novation and Change-of-Name Agreements
    
    1842.1203  Processing agreements.
    1842.1203-70  DOD processing of novation and change-of-name 
    agreements on behalf of NASA.
    
    Subpart 1842.13--Suspension of Work, Stop-Work Orders, and Government 
    Delay of Work
    
    1842.1305  Contract clauses.
    
    Subpart 1842.14--Traffic and Transportation Management
    
    1842.1405  Discrepancies incident to shipment of supplies.
    
    Subpart 1842.70--Additional NASA Contract Clauses
    
    1842.7001  Observance of legal holidays.
    1842.7002  Travel outside of the United States.
    
    Subpart 1842.71--Submission of Vouchers
    
    1842.7101  Submission of vouchers.
    
    Subpart 1842.72--NASA Contractor Financial Management Reporting
    
    1842.7201  General.
    1842.7202  Contract clause.
    
    Subpart 1842.73--Audit Tracking and Resolution
    
    1842.7301  NASA external audit follow-up system.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1842.1--Interagency Contract Administration and Audit 
    Services
    
    
    1842.101  Policy. (NASA supplements paragraph (a))
    
        (a)(i) The Defense Contract Audit Agency (DCAA) has been designated 
    as the DOD agency responsible for the performance of audit functions 
    for NASA contracts, except those awarded to educational institutions 
    for which other agencies have audit cognizance under OMB Circular No. 
    88, those with Canadian contractors, and those for which NASA will 
    perform audits.
        (ii) Cross-servicing arrangements are the responsibility of the 
    Headquarters Office of External Relations (Code ID). Contracting 
    officers should direct questions to the Headquarters Office of 
    Procurement (Code HS).
    
    
    1842.102  Procedures.
    
    
    1842.102-70  Review of administration and audit services.
    
        (a) NASA installations shall assess their delegations to DOD 
    semiannually to determine changes in delegation patterns that could (1) 
    result in significant changes in DOD manpower requirements or (2) have 
    other important impacts on DOD contract administration activities. 
    Events such as major program cutbacks or expansions, changes in 
    locations of major programs, and sizable new acquisitions should be 
    considered in the assessment.
        (b) A summary of significant changes shall be submitted to the 
    Headquarters Office of Procurement (Code HK). The summary shall 
    include--
        (1) A description of the change in work requirements or delegation 
    pattern;
        (2) The estimated duration of the impact;
    
    [[Page 14018]]
    
        (3) The results of discussions with affected DOD contract 
    administration offices including agreement and disagreements on the 
    predicted impact on DOD in terms of changes in manpower requirements or 
    other costs; and
        (4) Any other significant impact on DOD or NASA resources or 
    contract performance risk.
    
    
    1842.170  Assignment of NASA personnel at contractor plants.
    
        (a)(1) NASA personnel normally shall not be assigned at or near a 
    contractor's facility to perform any contract administration functions 
    listed in FAR 42.302(a). Before such an assignment is made, a written 
    request shall be forwarded to the cognizant program director for 
    approval with the concurrence of the Associate Administrator for 
    Procurement (Code HS). The following supporting information shall be 
    forwarded with the request to make the assignment:
        (i) A statement of the special circumstances that necessitate the 
    assignment.
        (ii) The contract administration serves to be performed.
        (iii) A summary of any discussions held with the cognizant contract 
    administration organization.
        (iv) A staffing plan covering three years or such shorter period as 
    may be appropriate.
        (2) The provisions of this paragraph (a) do not apply to NASA audit 
    personnel assigned to the field installations, to NASA technical 
    personnel covered by 1842.101 and paragraph (b) of this section, unless 
    they are performing any contract administration functions listed in FAR 
    42.302(a), or to personnel assigned to contractors' plants on NASA or 
    other Federal installations.
        (b) NASA may assign technical personnel (such as quality assurance, 
    reliability, or engineering representatives) to contractors' plants or 
    laboratories to provide direct liaison with NASA and technical 
    assistance and guidance to the contractor and DOD. The duties and 
    responsibilities of these technical representatives shall be clearly 
    defined and shall not conflict with, duplicate, or overlap with 
    functions delegated to DOD personnel. NASA shall advise appropriate DOD 
    and contractor organizations of the duties and responsibilities of NASA 
    technical personnel.
        (c) When a NASA resident office, including any assigned technical 
    personnel, and a DOD contract administration office are performing 
    contract administration functions for NASA contracts at the same 
    contractor's facility, the two offices shall execute a written 
    agreement clearly establishing the relationship between the two 
    organizations and the contractor. The agreement should eliminate 
    duplication in the performance of contract administration functions and 
    minimize procedural misunderstandings between the two organizations. 
    Such agreements shall be consistent with existing delegations to the 
    contract administration offices concerned and shall specify the 
    relationship of NASA nonprocurement resident personnel to their DOD and 
    contractor counterparts if such personnel will be involved in any 
    aspect of contract administration.
    
    Subpart 1842.2--Assignment of Contract Administration
    
    
    1842.202  Assignment of contract administration. (NASA supplements 
    paragraphs (b) and (d))
    
        (b) Withholding normal functions. (1) The following functions are 
    normally retained by the contracting office.
        (A) Approval of the final voucher (FAR 42.302(a)(7)).
        (B) Countersigning NASA Form 456, Notice of Contract Costs 
    Suspended and/or Disapproved (FAR 42.302(a)(8)).
        (C) Issuance of decisions under the disputes clause (FAR 
    42.302(a)(10)).
        (D) Contract payment (FAR 42.302(a)(13)).
        (E) Execution of supplement agreements involving spare parts or 
    other items selected through provisioning procedures. However, 
    delegation of the negotiation of supplemental agreements for spare 
    parts and other items and forwarding for approval and signature of the 
    NASA contracting officer is permitted (FAR 42.302(a)(22)).
        (F) Executive of supplemental agreements definitizing change orders 
    (see FAR 42.302(b)(1)).
        (G) Issuing termination notices and executing supplemental 
    agreements for settlement of termination for default or for convenience 
    of the Government. However, delegation of the negotiation of 
    termination settlements and forwarding for approval and signature of 
    the NASA contracting officer is permitted using NASA Form 1432 (FAR 
    42.302(a)(23)).
        (H) Consent to placement of subcontracts under FAR 42.302(a)(51). 
    (See 1844.202-1(a)).
        (d) Transmittal and documentation. In addition to the instructions 
    at FAR 42.202(d) (1) through (4), contracting officers shall--
        (i) Send delegations to DOD contract administration offices in 
    accordance with the instructions in the DOD Directory of Contract 
    Administration Services Components (DLAH 4105.4).
        (ii) At time of contract award, prepared and forward NASA Form 
    1430, Letter of Contract Administration Delegation, General, to the 
    contract administration office. NASA Form 1430A, Letter of Contract 
    Administration, Special Instructions, will supplement the NASA Form 
    1430, to modify previously delegated functions and provide additional 
    or particular information considered necessary to ensure clear 
    understanding of all delegated functions.
        (iii) Forward NASA Form 1431, Letter of Acceptance of Contract 
    Administration, with each NASA Form 1430 or 1430A. Contracting officers 
    shall use the returned NASA Form 1431 as contract file documentation 
    that the delegation has been accepted, modified or rejected by the 
    contract administration office and as a reference for points of 
    contract for each of the functional areas delegated.
        (iv) Use NASA Form 1433, Letter of Audit Delegation, to delegate 
    the audit function and to amend previous delegations. Distribute copies 
    of the contract and NASA Form 1433 as follows:
        (A) Audit office: One copy of the contract and three NASA Forms 
    1433. When the Department of Health and Human Services is designated as 
    the audit office, item 12 on NASA Form 1433 shall be marked ``Not 
    applicable.''
        (B) Contractor: One NASA Form 1433.
        (C) Cognizant NASA fiscal or financial management office: One NASA 
    Form 1433.
        (v) For contracts with the Canadian Commercial Corporation (CCC), 
    audits are automatically arranged by the Department of Defense 
    Production (Canada) (DDP) in accordance with agreements between NASA 
    and DDP. Upon advice from DDP, CCC will certify the invoice and forward 
    it with Standard Form 1034, Public Voucher, to the contracting officer 
    for further processing and transmittal to the fiscal or financial 
    management officer.
        (vi) For contracts placed directly with Canadian firms, audits are 
    requested by the contracting officer from the Audit Services Branch, 
    Comptroller of the Treasury, Department of Finance, Ottawa, Ontario, 
    Canada. Invoices are approved by the auditor on a provisional basis 
    pending completion of the contract and final audit. These invoices, 
    accompanied by SF 1034, are forwarded to the contracting officer for 
    further processing and transmittal to the fiscal or financial 
    management officer. Periodic advisory audit reports are
    
    [[Page 14019]]
    
    furnished directly to the contracting officer.
    
    
    1842.203  Retention of contract administration. (NASA supplements 
    paragraph (a))
    
        (a) The assignment of contract administration is optional for the 
    following contracts:
        (i) Research and development study contracts not involving 
    deliverable hardware or Government furnished property.
        (ii) Contracts with delivery schedules for 90 days or less.
        (iii) Purchase orders without Government source inspection 
    requirements.
        (iv) Contracts requiring only on-site performance.
        (v) Contracts requiring work in the vicinity of the awarding center 
    where DOD contract administration services are not reasonably 
    available.
    
    
    1842.270  Contracting officer technical representative (COTR) 
    delegations.
    
        (a) Contracting officers may appoint a qualified Government 
    employee to act as their technical representatives in managing the 
    technical aspects of a particular contract. If necessary, the 
    contracting officer may appoint an alternate COTR to act during short 
    absences of the COTR. Technical organizations are responsible for 
    ensuring that the individual they recommend to the contracting officer 
    possesses training, qualifications and experience commensurate with the 
    duties and responsibilities to be delegated and the nature of the 
    contract.
        (b) NASA Form 1634, Contracting Officer Technical Representative 
    (COTR) Delegation, shall be used to appoint COTRs. A COTR's duties and 
    responsibilities may not be redelegated by the COTR and the COTR may be 
    held personally liable for unauthorized acts. However, this does not 
    prohibit the COTR from receiving assistance for the purpose of 
    monitoring contractor progress and gathering information. When an 
    individual is appointed as a COTR on more than one contract, separate 
    delegations shall be issued for each contract. A separate NASA Form 
    1634 will be used to appoint an alternate COTR.
        (c) A COTR delegation remains in effect throughout the life of the 
    contract unless canceled in writing by the cognizant contracting 
    officer or at any level above that contracting officer. The contracting 
    officer may modify the delegation only by issuance of a new delegation 
    canceling and superseding the existing delegation.
        (d) A COTR shall not be authorized to initiate procurement actions 
    or in any way cause a change to the contract or increase the 
    Government's financial obligations. However, delegations may be made to 
    construction contract COTRs to sign emergency on-site change orders 
    with an estimated value not to exceed the value specified in writing by 
    the contracting officer in the NASA Form 1634 but in no event to exceed 
    $25,000.
        (e) Each COTR shall acknowledge receipt and accept the delegation 
    by signing the original delegation letter. The original of the COTR 
    delegation letter shall be filed in the applicable contract file. 
    Copies of the signed COTR delegation letter shall be distributed to the 
    COTR, the contractor, and each cognizant contract administration 
    office. Acknowledgment and distribution for terminations of COTR 
    delegations and COTR delegations which revise authority, duties and 
    responsibilities shall follow the same rules.
        (f) Mandatory training for COTRs and their alternates shall include 
    the following core topic areas: contracting authority; procurement 
    integrity; performance-based contracting; contract modifications; 
    surveillance plans; contracting for inherently governmental functions, 
    personal services, and NASA policy on the acquisition of services; the 
    Service Contract Act; the Anti-Deficiency Act; contract financial 
    management; the ``Changes'' clause; the ``Disputes'' clause; the 
    ``Inspection'' clause; Government property and policy procedures; and 
    the ``Limitation of Funds'' and ``Limitation of Cost'' clauses. 
    Procurement officers are responsible for assuring that the course(s) 
    utilized by their installation address the mandatory core topics in 
    sufficient detail for the purpose of COTR training.
        (g) The contracting officer shall verify that the COTR has received 
    the mandatory training before signing NASA Form 1634. If an urgent need 
    arises for the appointment of a COTR and no trained and otherwise 
    qualified individual is available, then the procurement officer may 
    make a temporary COTR appointment not to exceed six months. Temporary 
    appointments must be so identified and clearly reflect the appointment 
    expiration date.
        (h) No technical direction may be issued by a COTR relative to 
    performance-based contract requirements or when serving under a 
    temporary appointment.
    
    
    1842.271  NASA clause.
    
        Insert the clause at 1852.242-70, Technical Direction, when 
    paragraph 3(m) of the NASA Form 1634 specifically authorizes a COTR to 
    issue technical direction.
    
    Subpart 1842.5--Postaward Orientation
    
    
    1842.503  Postaward conferences. (NASA paragraphs (1) and (2))
    
        (1) A postaward conference shall be held with representatives of 
    the contract administration office when--
        (i) A contract is expected to exceed $10,000,000;
        (ii) Contract performance is required at or near a NASA 
    installation or NASA-controlled launch site;
        (iii) The delegation will impose an abnormal demand on the 
    resources of the contract administration office receiving the 
    delegation; or
        (iv) Complex contract management problems are expected.
        (2) Procurement officer approval is required to waive a post-award 
    planning conference for contracts meeting any of the criteria in 
    paragraph (1) of this section. The request for procurement officer 
    approval to waive a post-award conference shall address action taken 
    and planned to ensure effective communication with the contract 
    administration office during the performance of the contract.
    
    Subpart 1842.7--Indirect Cost Rates
    
    
    1842.705  Final indirect cost rates.
    
    
    1842.705-1  Contracting officer determination procedure. (NASA 
    supplements paragraph (a))
    
        (a) Applicability and responsibility. (i) Since many NASA 
    contractors are under DOD's final overhead rate determination 
    procedure, NASA's policy is to participate jointly with DOD for those 
    companies where NASA has a major financial interest. The NASA 
    participant shall be a representative from that installation having the 
    predominance of NASA work.
        (ii) When NASA has been assigned the final indirect cost rate 
    determination authority, settlement of indirect costs shall be 
    conducted by the cognizant NASA contracting officer (normally from the 
    installation providing the preponderance of NASA funding).
    
    
    1842.708  Quick-closeout procedure. (NASA supplements paragraph (a))
    
        (a)(2)(ii) The 15 percent parameter does not apply to NASA 
    contracts. Instead, quick-closeout may be used if an individual 
    contract's value, excluding fee, is not greater than $2,000,000. Quick 
    closeout may be used for contracts above $2,000,000 with the prior 
    approval of the installation procurement officer.
    
    [[Page 14020]]
    
    1842.708-70  NASA quick-closeout procedures.
    
        After a decision is made that the use of quick closeout is 
    appropriate, the contracting officer shall:
        (a) Obtain a written agreement from the contractor to participate 
    in the quick-closeout process under FAR 42.708 for the selected 
    contract(s).
        (b) Require the contractor to submit a final voucher and a summary 
    of all costs by cost element and fiscal year for the contract(s) in 
    question, as well as a copy of the contractor's final indirect cost 
    rate proposal for each fiscal year quick closeout is involved.
        (c) Notify the cognizant audit activity in writing, identify the 
    contract(s), and request: (1) the contractor's indirect cost history 
    covering a sufficient number of fiscal years to see the trend of 
    claimed, audit questioned, and disallowed costs; and (2) any other 
    information that could impact the decision to use quick-closeout 
    procedures. Indirect cost histories should be requested from the 
    contractor only when the cognizant audit activity is unable to provide 
    the information.
        (d) Review the contract(s) for indirect cost rate ceilings and any 
    other contract limitations, as well as the rate history information.
        (e) Establish final indirect cost rates using one of the following 
    rates:
        (1) The contract's ceiling indirect cost rates, if applicable, and 
    if less than paragraphs (e)(2) through (e)(6) of this section.
        (2) The contractor's claimed actual rates adjusted based on the 
    contractor's indirect cost history, if less than paragraphs (e)(3) 
    through (e)(6) of this section.
        (3) Recommended rates from the cognizant audit agency, the local 
    pricing office, another installation pricing office, or other 
    recognized knowledgeable source.
        (4) The contractor's negotiated billing rates, if less than 
    paragraphs (e)(5) or (e)(6) of this section.
        (5) The previous year's final rates.
        (6) Final rates for another fiscal year closest to the period for 
    which quick-closeout rates are being established.
        (f) If an agreement is reached with the contractor, obtain a 
    release of all claims and other applicable closing documents.
        (g) For those contracts where the indirect cost rate negotiation 
    function was delegated or falls under the cognizance of another agency, 
    send a copy of the agreement to that office.
    
    Subpart 1842.8--Disallowance of Costs
    
    
    1842.803  Disallowing costs after incurrance. (NASA supplements 
    paragraph (b))
    
        (b) Auditor receipt of vouchers. (1) NASA has designated the 
    contract auditor as the contracting officer's representative for--
        (A) Reviewing vouchers received directly from contractors;
        (B) Approving vouchers for provisional payment and sending them to 
    the disbursing office;
        (C) Reviewing completion/final vouchers and sending them to the 
    designated contracting officer for approval.
        (2)(A) When contract costs are questioned, the auditor shall 
    prepare and send to the cognizant contracting officer NASA Form 456, 
    Notice of Contract Costs Suspended and/or Disapproved.
        (B) After coordination with other NASA and Federal agency 
    contracting officers administering contracts with the same contractor 
    under which a NASA Form 456 or a DCAA Form 1 has been issued for the 
    same items of cost, the NASA contracting officer shall take one of the 
    following actions:
        (a) Assign a notice number and sign the NASA Form 456.
        (b) Issue a new NASA Form 456 suspending the costs rather than 
    disapproving them pending resolution of the issues.
        (c) Return the unsigned NASA Form 456 to the auditor with a 
    detailed explanation of why the suspension or disapproval is not being 
    signed, and process the contractor's claim for payment.
        (C) When more than one NASA contract is affected by a notice, the 
    NASA contracting officer with the largest amount of contract dollars 
    affected is responsible for coordination of the NASA Form 456 with the 
    other contracting officers, including those of other Federal agencies, 
    listed in the notice.
        (D) An original and three copies (which includes two acknowledgment 
    copies, one each for return to the contracting officer and the auditor) 
    of the NASA Form 456 shall be sent to the contractor by certified mail, 
    return receipt requested; one copy shall be attached to the Standard 
    Form 1034 and each copy of the Standard Form 1034A on which the 
    deduction for the suspension/disapproval is made.
        (E)(a) If the amount of the deduction is more than the amount of 
    the public voucher, the installment method of deduction shall be 
    applied to the current and subsequent public vouchers until the amount 
    is fully liquidated. The deductions on any voucher may not exceed the 
    voucher amount to avoid processing of a voucher in a credit amount. 
    Public voucher(s) with zero amounts must be forwarded to the fiscal or 
    financial management office for appropriate action.
        (b) If deductions are in excess of contractor claims, recovery may 
    be made through a direct refund from the contractor, in the form of a 
    check payable to NASA, or by a set-off deduction from the voucher(s) 
    submitted by the contractor under any other contract unless those 
    contracts contain a ``no set-off'' provision. If a set-off is affected, 
    the voucher(s) from which the deduction is made should be annotated to 
    identify the contract and appropriation affected and the applicable 
    NASA Form 456.
    
    Subpart 1842.12--Novation and Change-of-Name Agreements
    
    
    1842.1203  Processing agreements. (NASA supplements paragraphs (b) and 
    (f))
    
        (b) The installation shall immediately notify the Headquarters 
    Office of Procurement (Code HS) of the request to execute a novation 
    (successor-in-interest) or change-of-name agreement.
        (f) The contracting officer shall forward one copy of the agreement 
    to the Code HS.
    
    
    1842.1203-70  DOD processing of novation and change-of-name agreements 
    on behalf of NASA.
    
        (a) Appendix E of the NASA/DOD Agreement for Contract 
    Administration and Contract Audit Services authorizes DOD to process 
    novation and change-of-name agreements on behalf of NASA. Copies of 
    agreements executed by DOD on behalf of NASA are maintained by the 
    Headquarters Office of Procurement (Code HS).
        (b) Code HS is the Agency point of contact for issues related to 
    proposed novation agreements. With the concurrence of Code HS, an 
    installation may execute a separate agreement with the contractor.
    
    Subpart 1842.13--Suspension of Work, Stop-Work Orders, and 
    Government Delay of Work
    
    
    1842.1305  Contract clauses. (NASA supplements paragraph (b))
    
        (b) FAR 52.242-15, Stop-Work Order, shall not be used in 
    solicitations or contracts for research performed by educational or 
    other nonprofit institutions.
    
    [[Page 14021]]
    
    Subpart 1842.14--Traffic and Transportation Management
    
    
    1842.1405  Discrepancies incident to shipment of supplies. (NASA 
    supplements paragraph (a))
    
        (a) NASA personnel shall also report discrepancies and adjust 
    claims for loss of and damage to Government property in transit in 
    accordance with NHB 6200.1, NASA Transportation and General Traffic 
    Management.
    
    Subpart 1842.70--Additional NASA Contract Clauses
    
    
    1842.7001  Observance of legal holidays.
    
        (a) The contracting officer shall insert the clause at 1852.242-72, 
    Observance of Legal Holidays, in contracts when work will be performed 
    at a NASA installation.
        (b) The clause shall be used with its Alternate I in cost-
    reimbursement contracts when it is desired that contractor employees 
    not have access to the installation during Government holidays. This 
    alternate may be appropriately modified for fixed-price contracts.
        (c) The clause may be used with its Alternate II in cost-
    reimbursement contracts when Alternate I is used and it is desired that 
    administrative leave be granted contractor personnel in special 
    circumstances, such as inclement weather or potentially hazardous 
    conditions.
    
    
    1842.7002  Travel outside of the United States.
    
        The contracting officer shall insert the clause at 1852.242-71, 
    Travel Outside of the United States, in cost-reimbursement 
    solicitations and contracts where a contractor may travel outside of 
    the United States and it is appropriate to require Government approval 
    of the travel.
    
    Subpart 1842.71--Submission of Vouchers
    
    
    1842.7101  Submission of vouchers.
    
        (a) Vouchers shall be submitted in accordance with the clause at 
    1852.216-87, Submission of Vouchers for Payment.
        (b) The auditor shall retain an unpaid copy of the voucher.
        (c) When a voucher submitted in accordance with the clause at 
    1852.216-87 contains one or more individual direct freight charges of 
    $100 or more, an additional copy of Standard Form 1034A and Standard 
    Form 1035A shall be submitted and marked for return to the contractor 
    after payment. This copy shall be transmitted quarterly by the 
    contractor with the freight bills to the General Services 
    Administration. When a voucher is identified as the ``Completion 
    Voucher,'' an additional copy shall be submitted for transmittal to the 
    NASA contracting officer.
    
    Subpart 1842.72--NASA Contractor Financial Management Reporting
    
    
    1842.7201  General.
    
        (a) Contracting officer responsibilities. (1) Contracting officers 
    must ensure contracts require cost reporting consistent with both 
    policy requirements and project needs. Contracting Officers shall 
    monitor contractor cost reports on a regular basis to ensure cost data 
    reported is accurate and timely.
        Adverse trends or discrepancies discovered in cost reports should 
    be pursued through discussions with financial and project team members.
        (2) Whenever cost performance threatens contract performance, 
    contracting officers shall require corrective action plans from the 
    contractors.
        (b) Reporting requirements. (1) Use of the NASA Contractor 
    Financial Management Reports, the NASA form 533 series, is required on 
    cost-type, price redetermination, and fixed-price incentive contracts 
    when the following dollar, period of performance, and scope criteria 
    are met:
    
    ----------------------------------------------------------------------------------------------------------------
            Contract value/scope           Period of performance             533M                      533Q         
    ----------------------------------------------------------------------------------------------------------------
    $500K to $999K......................  1 year or more.........  Required................  Optional.              
    $1,000,000 and over.................  Less than 1 year.......  Required................  Optional.              
    $1,000,000 and over.................  1 year or more.........  Required................  Required.              
    ----------------------------------------------------------------------------------------------------------------
    
        (2) When it is probable that a contract will ultimately meet the 
    criteria in paragraph (b)(1) of this section through change orders, 
    supplemental agreements, etc., the reporting requirement must be 
    implemented in the contract based on the estimated final contract value 
    at the time of award.
        (3) NF 533Q reporting may be waived by the contracting officer, 
    with the concurrence of the center chief financial officer and 
    cognizant project manager, for support service or task order contracts, 
    when NF 533M reports and other data are sufficient to ensure accurate 
    monthly cost accruals, evaluation of the contractor's cost performance, 
    and forecasting of resource requirements.
        (4) Where a specific contractual requirement differs from the 
    standard system set forth in NPG 9501.2, NASA Contractor Financial 
    Management Reporting, but is determined to be in the best interests of 
    the Government and does not eliminate any of the data elements required 
    by the standard NF 533 formats, it may be approved by the contracting 
    officer with the concurrence of the center chief financial officer and 
    the project manager. Such approval shall be documented and retained, 
    with the supporting rationale, in the contract file.
        (5) The contractor's internal automated printout reports may be 
    substituted for the 533 reporting formats only if the substitute 
    reports contain all the data elements that would be provided by the 
    corresponding 533's. The contracting officer shall coordinate any 
    proposed substitute with the installation financial management office.
        (c) Contract requirements. (1) Reporting requirements, including a 
    description of reporting categories, shall be detailed in the 
    procurement request, and reports shall be required by inclusion of the 
    clause prescribed in 1842.7202. The contract schedule shall include 
    report addressees and numbers of copies. Reporting categories shall be 
    coordinated with the center financial management office to ensure that 
    data required for agency cost accounting will be provided by the 
    reports. Reporting dates shall be in accordance with NPG 9501.2, except 
    that earlier submission is encouraged whenever feasible. No due date 
    shall be permitted which is later than the date by which the center 
    financial management office needs the data to enter an accurate monthly 
    cost accrual in the accounting system.
        (2) The contractor shall be required to submit an initial report in 
    the NF 533Q format, time phased for the expected life of the contract, 
    within 30 days after authorization to proceed has been granted. NF 533M 
    reporting will begin no later than 30 days after incurrence of cost. NF 
    533Q reporting begins with the initial report.
    
    
    1842.7202  Contract clause.
    
        The contracting officer shall insert the clause at 1852.242-73, 
    NASA
    
    [[Page 14022]]
    
    Contractor Financial Management Reporting, when any of the NASA Form 
    533 series of reports are required from the contractor.
    
    Subpart 1842.73--Audit Tracking and Resolution
    
    
    1842.7301  NASA external audit follow-up system.
    
        (a) This section implements OMB Circular No. A-50, NASA Management 
    Instruction (NMI) 9970.1A, Audit Follow-up, and NASA Audit Follow-up 
    Handbook 9970.2, which provide more detailed guidance. Recommendations 
    for external audits (contracts and OMB Circulars No. A-128, Audits of 
    State and Local Governments, and A-133, Audits of Institutions of 
    Higher Learning and Other Non-Profit Institutions) shall be resolved by 
    formal review and approval procedures analogous to those at 1815.807-
    71.
        (b) The external audit follow-up system tracks all contract and OMB 
    Circular A-128 or A-123 audits where NASA has resolution and 
    disposition authority. The objective of the tracking system is to 
    ensure that audit recommendations are resolved as expeditiously as 
    possible, but a maximum, within 6 months of the date of the audit 
    report.
        (c) (1) The identification and tracking of contract audit reports 
    under NASA cognizance are accomplished in cooperation with DCAA by 
    means of the DCAA form, Contract Audit Follow-up Summary Sheet. The use 
    of this form by DCAA and NASA is covered in Chapter 6 of the NASA Audit 
    Follow-up Handbook.
        (2) Identification and tracking of A-128 and A-133 audit reports 
    are accomplished in cooperation with the NASA Office of the Inspector 
    General (OIG) by means of a transmittal memorandum. A transmittal 
    memorandum is sent by the OIG to the procurement officer of each NASA 
    field installation having an award (contract, grant, or other 
    agreement) covered by the audit report. The transmittal memorandum will 
    identify whether there were any audit findings.
        (d)(1) Chapter 6 of the NASA Audit Follow-up Handbook identifies 
    which contract audit reports are reportable semiannually to the 
    Headquarters Office of Procurement (Code HC).
        (2) Only trackable A-128 and A-133 audit reports involving the 
    following shall be reported semiannually to Code HC--
        (i) A significant management control issue; or
        (ii) For an individual NASA award, either the lower of 10 percent 
    or $10,000 of the costs incurred in the period covered by the audit are 
    questioned; or for institution-wide issues, the lower of 10 percent or 
    $10,000 of the total costs incurred involving Government funds for the 
    period covered by the audit are questioned.
        (e)(1) The resolution and disposition of contract audits is covered 
    by Chapter 6 of the NASA Audit Follow-up Handbook.
        (2) The resolution and disposition of A-128 and A-133 are handled 
    as follows:
        (i) Audit findings pertaining to an individual NASA award are the 
    responsibility of the procurement officer administering that award.
        (ii) Audit findings having an institution-wide impact are the 
    responsibility of the cognizant Federal agency or the agency 
    responsible for oversight. OMB's January 6, 1986, Federal Register 
    Notice (51 FR 552), titled ``Federal Agencies Responsible for Cost 
    negotiation and Audit of State and Local Governments,'' provides 
    cognizant agency assignments for OMB Circular A-128. For organizations 
    subject to OMB Circular A-133, there is either a cognizant agency or an 
    oversight agency. The cognizant agency is the Federal agency that 
    provides the predominant amount of direct funding to the recipient 
    organization unless OMB makes a specific agency cognizant, in which 
    case a notice will be published in the Federal Register. To provide for 
    the continuity of cognizance, the determination of the predominant 
    amount of direct funding will be based on the direct Federal awards 
    expended in the recipient's fiscal years ending in 1996, 2000, and 
    every fifth year thereafter. If there is no cognizant Federal agency, 
    there is an agency responsible for oversight. The oversight agency is 
    that agency which provides the predominant amount of direct funding. 
    When there is no direct funding, the Federal agency with the 
    predominant indirect funding is to assume the oversight 
    responsibilities. In cases where NASA is the cognizant or oversight 
    Federal agency, audit resolution and disposition is the responsibility 
    of the procurement officer for the field installation having the 
    largest amount of direct funding, or, if there is no direct funding, 
    the largest amount of indirect funding for the audited period. A copy 
    of the memorandum disappointing the findings shall be provided by each 
    field installation having resolution responsibility for the particular 
    report to the OIG Center office within whose geographic area of 
    responsibility the audited organization is located.
        12. Part 1843 is revised to read as follows:
    
    PART 1843--CONTRACT MODIFICATIONS
    
    Subpart 1843.2--Change Orders
    
    Sec.
    1843.205  Contract clauses.
    1843.205-70  NASA contract clause.
    
    Subpart 1843.70--Undefinitized Contract Actions
    
    1843.7001  Definitions.
    1843.7002  Policy.
    1843.7003  Procedures.
    1843.7004  Exceptions.
    1843.7005  Definitions.
    
    Subpart 1843.71--Shared Savings
    
    1843.7101  Shared Savings Program.
    1843.7102  Solicitation provision and contract clause.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1843.2--Change Orders
    
    
    1843.205  Contract clauses.
    
        As authorized in the prefaces of clauses FAR 52.243-1, Changes--
    Fixed Price; FAR 52.243-2, Changes--Cost Reimbursement; FAR 52.243-3, 
    Changes--Time-and-Material or Labor-Hours; and FAR 52.243-4, Changes, 
    the period within which a contractor must assert its rights to an 
    equitable adjustment may be varied not to exceed 60 calendar days.
    
    
    1843.205-70  NASA contract clause.
    
        (a) The contracting officer may insert in contracts a clause 
    substantially the same as 1852.243-70, Engineering Change Proposals, 
    when ECPs are expected. Paragraphs (c) and (d) of the basic clause and 
    Alternate I of the clause shall be changed to reflect the specific type 
    of contract. A local format may be substituted for the MIL-STD-973 
    format.
        (b) If it is desirable to preclude a large number of small-dollar, 
    contractor-initiated engineering changes and to reduce the 
    administrative cost of reviewing them, the contracting officer shall 
    use the clause with its Alternate I.
        (c) If the contract is a cost-reimbursement type, the contracting 
    officer shall use the clause with its Alternate II.
    
    Subpart 1843.70--Undefinitized Contract Actions
    
    
    1843.7001  Definitions.
    
        Undefinitized contract action (UCA) means a unilateral or bilateral 
    contract modification or delivery/task order in which the final price 
    or estimated cost and fee have not been negotiated and mutually agreed 
    to by NASA and the contractor. (Issuance of letter contracts
    
    [[Page 14023]]
    
    and their modifications are governed by subpart 1816.6.)
    
    
    1843.7002  Policy.
    
        Undefinitized contract actions shall be executed by contracting 
    officers on an exception basis and shall be limited to the minimum 
    urgent requirements. The contract file for all UCAs shall be documented 
    to justify issuance and shall include a Government estimate for the 
    changed requirements.
    
    
    1843.7003  Procedures.
    
        (a) Issuance of undefinitized contract actions with a Government 
    estimated cost or price over $1,000,000 must be approved in writing by 
    the Center Director. This approval authority is not delegable. Issuance 
    of undefinitized contract actions with a Government estimated cost or 
    price less than or equal to $1,000,000 shall also be minimized but may 
    be approved on an exception basis in accordance with installation 
    procedures.
        (b) (1) Undefinitized contract actions exceeding $1,000,000 
    approved by the Center Director shall be issued as bilateral agreements 
    setting forth a ceiling price or ``not to exceed'' estimated cost 
    figure for the changed contractual requirements. For fixed price 
    contracts the negotiated price for the changed contract requirements 
    shall not exceed the established ceiling price. In the case of cost 
    type contracts any costs eventually negotiated for the changed 
    requirements in excess of the ``not to exceed'' estimated cost figure 
    shall be non-fee bearing. The ceiling price or ``not to exceed'' 
    estimated cost figures shall be separately identified in the UCA 
    instrument from the pricing structure of the basic contract.
        (2) The Center Director may waive the ceiling price or ``not to 
    exceed'' estimated cost figure and bilateral agreement requirements 
    prior to UCA issuance on the basis of urgency. This waiver authority is 
    not delegable. Any waivers shall be documented in the contract file.
        (c) The changed contractual requirements set forth in the UCA shall 
    be clearly defined and shall be limited to the minimum effort required 
    to satisfy urgent program requirements while a cost proposal is 
    prepared, analyzed and negotiated.
        (d) For undefinitized contract actions with a Government estimate 
    greater than $1,000,000 and not excepted under subpart 1843.7004, a 180 
    day funding profile shall be obtained from the contractor prior to 
    execution of the undefinitized contract action.
        (e) Undefinitized contract actions with a Government estimated cost 
    or price greater than $1,000,000 shall include a requirement that the 
    change shall be separately accounted for by the contractor to the 
    degree necessary to provide the contracting officer visibility into 
    actual costs incurred pending definitization. The contracting officer 
    may waive this requirement for individual actions if there is a 
    documented finding that such accounting procedures would not be cost 
    effective. Any such waiver shall not affect existing NASA Form 533 or 
    other financial reporting requirements set forth in the contract.
    
    
    1843.7004  Exceptions.
    
        (a) Exceptions to the requirement for Center Director approval for 
    issuance of undefinitized contract actions are--
        (1) Modifications to facilities contracts;
        (2) Modifications to construction contracts using Construction of 
    Facilities funding;
        (3) Urgent modification resulting from Shuttle manifest changes or 
    that involve immediate issues of safety or damage/loss of property;
        (4) Modifications to decrease the contract value; or
        (5) Modification to letter contracts.
        (b) The contract file for any of the modifications in paragraph (a) 
    of this section shall cite the exception and include complete 
    supporting rational for its applicability.
    
    
    1843.7005  Definitization.
    
        (a) Undefinitized contract actions should be sufficiently complete 
    and detailed as to enable the contractor to begin immediate preparation 
    of a cost proposal for the changed requirement. The NASA goal is to 
    definitive UCAs within 180 from date of issuance.
        (b) Whenever possible, pre-change study efforts or engineering 
    change proposals (ECPs) shall be utilized to negotiate and definitize 
    changes prior to issuance.
    
    Subpart 1843.71--Shared Savings
    
    
    1843.7101  Shared Savings Program.
    
        This subpart establishes and describes the methods for implementing 
    and administering a Shared Savings Program. This program provides an 
    incentive for contractors to propose and implement, with NASA approval, 
    significant cost reduction initiatives. NASA will benefit as the more 
    efficient business practices that are implemented lead to reduced costs 
    on current and follow-on contracts. In return, contractors are entitled 
    to share in cost savings subject to limits established in the contract. 
    The contracting officer may require the contractor to provide periodic 
    reporting, or other justification, or to require other steps (e.g., 
    cost segregation) to ensure projected cost savings are being realized.
    
    
    1843.7102  Solicitation provision and contract clause.
    
        The contracting officer shall insert the clause at 1852.243-71, 
    Shared Savings, in all solicitations and contracts expected to exceed 
    $1,000,000, except those awarded under FAR part 12, NRA and AO 
    procedures, or the SBIR and STTR programs.
        13. Part 1844 is revised to read as follows:
    
    PART 1844--SUBCONTRACTING POLICIES AND PROCEDURES
    
    Subpart 1844.2--Consent to Subcontracts
    
    Sec.
    1844.201  Consent requirements.
    1844.201-1  Fixed-price prime contracts.
    1844.201-2  Cost reimbursement and letter prime contracts.
    1844.202  Contracting officer's evaluation.
    1844.202-1  Responsibilties.
    1844.204  Contract clauses.
    1844.204-70  NASA contract clause.
    
    Subpart 1844.3--Contractors' Purchasing Systems Reviews
    
    1844.302  Requirements.
    1844.302-70  DCMC-conducted contractor purchasing system reviews.
    1844.302.71  NASA-conducted contractor purchasing systems reviews.
    1844.304  Surveillance.
    1844.304-70  Contracting officer surveillance.
    1844.305  Granting, withholding, or withdrawing approval.
    1844.305-70  Review of CPSR report.
    
        Authority: 42 U.S.C. 2473(a)(1).
    
    Subpart 1844.2--Consent to Subcontracts
    
    
    1844.201  Consent requirements.
    
    
    1844.201-1  Fixed-price prime contracts. (NASA supplements paragraph 
    (b))
    
        (b)(2) (A) In determining special surveillance consent 
    requirements, the contracting officer should consider specific 
    subcontract awards, as well as any individual systems, subsystems, 
    components, technologies, and services that should have contracting 
    officer consent prior to being subcontracted.
        (B) For each planned contract award expected to exceed $1 million 
    in total estimated value (inclusive of options), the contracting 
    officer should consider such factors as the following to determine 
    whether certain subcontractors require special surveillance:
        (a) The degree of subcontract pricing uncertainties at the time of 
    contract award;
    
    [[Page 14024]]
    
        (b) The overall quality of the contractor's approach to pricing 
    subcontractors;
        (c) The extent of competition achieved, or to be achieved, by the 
    contractor in the award of subcontracts;
        (d) Technical complexity and the critically of specific supplies, 
    services, and technologies on the successful performance of the 
    contract; and
        (e) The potential impact of planned subcontracts on source 
    selection or incentive arrangements.
        (C) The contracting officer shall document results of the review in 
    the contract file. For contract modifications and change orders, the 
    contracting officer shall make the determination required by paragraph 
    (b)(2)(B) of this section whenever the value of any subcontract 
    resulting from the change order or modification is proposed to exceed 
    $100,000 or is one of the number of subcontracts with a single 
    subcontractor for the same or related supplies or services that are 
    expected cumulatively to exceed $100,000.
    
    
    1844.201-2  Cost reimbursement and letter prime contracts. (NASA 
    supplements paragraph (c))
    
        (c)(2) The policy in 1844.201-1(b)(2) shall be followed to 
    determine whether certain subcontracts require special surveillance. In 
    addition, any subcontract under a cost type prime contract shall be 
    identified for special surveillance if consent was not provided at the 
    time of contract award and cost of pricing data would be required in 
    accordance with FAR 15.806-2(a) (1) or (2).
    
    
    1844.202  Contracting officer's evaluation.
    
    
    1844.202  Responsibilities. (NASA supplements paragraph (a))
    
        (a) NASA contracting officers shall retain consent to subcontract 
    authority unless delegation is approved in writing by the procurement 
    officer.
    
    
    1844.204  Contract clauses.
    
    
    1844.204-70  NASA contract clause.
    
        The contracting officer shall insert the clause at 1852.244-70, 
    Geographic Participation in the Aerospace Program, in all research and 
    development solicitations and contracts of $500,000 or over that will 
    be performed within the United States.
    
    Subpart 1844.3--Contractors' Purchasing Systems Reviews
    
    
    1844.302  Requirements.
    
    
    1844.302-70  DCMC-conducted contractor purchasing system reviews.
    
        For contracts within their cognizance, NASA contracting officers 
    shall be aware of purchasing system approval status and should become 
    actively involved with the Defense Contract Management Command (DCMC) 
    in the Contractor Purchasing System Review (CPSR) process. Involvement 
    should include the following:
        (a) Verifying that CPSRs are being conducted as required for each 
    contractor meeting the thresholds in FAR 44.302.
        (b) Ensuring that purchasing system review specifically includes 
    the business unit performing the NASA contract.
        (c) Actively participating as a team member, or arranging NASA 
    representation, on DCMC CPSRs to review areas of NASA-specific 
    interest. At a minimum, such participation or representation shall be 
    arranged when the DCMC CPSR review involves--
        (1) Contractors with major NASA programs;
        (2) Contractors' business units where the total dollar value of 
    NASA contracts is substantial; or
        (3) Any contractor system where the contracting officer has special 
    concerns.
        (d) Ensuring that the selected CPSR sample to be reviewed reflects 
    the level of NASA business in the contractor's purchasing organization.
        (e) Providing to the cognizant DCMC CPSR team leader any areas of 
    special emphasis regarding the contractor's purchasing system to ensure 
    that the review is tailored to address any NASA concerns.
    
    
    1844.302-71  NASA-conducted contractor purchasing system reviews.
    
        If a NASA activity is the cognizant contract administration 
    officer, or after coordination with the cognizant DCMC CPSR office it 
    is determined that a CPSR is required but cannot be accomplished by 
    DCMC, then a CPSR should be conducted by NASA personnel. The NASA CPSR 
    team leader:
        (a) May use the DOD FAR Supplement, Contractor Purchasing System 
    Review (CPSR) guidance, as a general guide to conducting the CPSR.
        (b) May vary the scope of review depending on the contractor and 
    contracts involved.
        (c) Shall maintain close coordination with the cognizant ACO during 
    CPSRs at contractors under DOD cognizance.
    
    
    1844.304  Surveillance.
    
    
    1844.304-70  Contracting officer surveillance.
    
        (a) In the period between complete CPSRs, NASA contracting officers 
    shall maintain a sufficient level of surveillance to ensure contractor 
    purchasing efforts in support of NASA contracts are accomplished in an 
    appropriate manner and protect the interests of the Agency.
        (b) Surveillance shall be accomplished primarily through 
    performance of subcontract consent reviews. Other methods of 
    surveillance, including periodic reviews of contractor purchasing 
    records, may also be conducted. Contracting officers shall document the 
    results of subcontract consent reviews and periodic reviews, 
    maintaining a record of contractor subcontract or purchase order award 
    performance on NASA contracts. Contractor performance shall be 
    summarized on an annual basis and provided to the ACO cognizant of the 
    contractor's purchasing system. Annual reports should summarize the 
    number of consent reviews and other reviews conducted during the year 
    by NASA representatives, and summarize the types and quantity of 
    deficiencies identified during reviews, the need for special reviews, 
    and recommended areas of emphasis during future CPSRs.
    
    
    1844.305  Granting, withholding, or withdrawing approval.
    
    
    1844.305-70  Review of CPSR reports.
    
        ACO actions related to purchasing system approval have a potential 
    impact on NASA contracting officer consent requirements. Accordingly, 
    NASA contracting officers shall review system deficiencies documented 
    in CPSR reports and when results of consent reviews and other sources 
    conflict with CPSR or DOD surveillance conclusions, formally 
    communicate such concerns to the ACO having cognizance of purchasing 
    system approval. Significant issues or significant conflicts with DOD 
    CPSR results should be formally referred to the Office of Procurement 
    (Code HS).
        14. Part 1846 is revised to read as follows:
    
    PART 1846--QUALITY ASSURANCE
    
    Subpart 1846.3--Contract Clauses
    
    Sec.
    1846.370  NASA contract clauses.
    
    Subpart 1846.4--Government Contract Quality Assurance
    
    1846.470  Contract clause.
    
    Subpart 1846.6--Material Inspection and Receiving Reports
    
    1846.670  Introduction.
    1846.670-1  General.
    1846.670-2  Applicability.
    1846.670-3  Use.
    1846.670-4  Multiple shipments.
    1846.670-5  Forms.
    1846.671  Contract quality assurance on shipments between 
    contractors.
    
    [[Page 14025]]
    
    1846.672  Preparing DD Forms 250 and 250c.
    1846.672-1  Preparation instructions.
    1846.672-2  Consolidated shipments.
    1846.672-3  Multiple consignee instructions.
    1846.672-4  Correction instructions.
    1846.672-5  Invoice instructions.
    1846.672-6  Packing list instructions.
    1846.672-7  Receiving instructions.
    1846.673  Distribution of DD Forms 250 and 250c.
    1846.674  Contract clause.
    
    Subpart  1846.7--Warranties
    
    1846.703  Criteria for use of warranties.
    1846.703-70  Additional criteria.
    1846.704  Authority for use of warranties.
    1846.770  Administration.
    
        Authority: U.S.C. 2473(c)(1).
    
    Subpart 1846.3--Contract Clauses
    
    
    1846.370  NASA contract clauses.
    
        (a) The contracting officer shall insert the clause at 1852.246-70, 
    Mission Critical Space System Personnel Reliability Program, in 
    solicitations and contracts involving critical positions designated in 
    accordance with 14 CFR 1214.5, Mission Critical Space System Personnel 
    Reliability Program.
        (b) The contracting officer shall insert the clause at 1852.246-73, 
    Human Space Flight Item, in solicitations and contracts for human space 
    flight hardware and flight-related equipment if the highest available 
    quality standards are necessary to ensure astronaut safety.
    
    Subpart 1846.4--Government Contract Quality Assurance
    
    
    1846.470  Contrct clause.
    
        The contracting officer may insert a clause substantially as stated 
    at 1852.246-71, Government Contract Quality Assurance Functions, in 
    solicitations and contracts to specify the location(s) of quality 
    assurance functions.
    
    Subpart 1846.6--Material Inspection and Receiving Reports.
    
    
    1846.670  Introduction.
    
    
    1846.670-1  General.
    
        (a) This Subpart contains procedures and instructions for use of 
    the Material Inspection and Receiving Report (MIRR) (DD Form 250 
    series) and commercial shipping/packing lists used to evidence 
    Government contract quality assurance (CQA).
        (b) MIRRs are used to document CQA, acceptance of supplies and 
    services, and shipments. MIRRs are not used for--
        (1) Shipments by subcontractors not made to the Government;
        (2) Shipment of contractor inventory (see FAR 45.601); or
        (3) Movement of Government property unless for original 
    acquisition.
    
    
    1846.670-2  Applicability.
    
        (a) This subpart applies to all deliveries of supplies or services 
    acquired by or for NASA except:
        (1) Acquisitions under FAR part 13;
        (2) Negotiated subsistence acquisitions; or
        (3) Contracts for which the end item is a technical or scientific 
    report.
        (b) The DD Form 250 may be used for imprest fund purchases, 
    purchase orders, delivery orders placed against Federal Supply Schedule 
    contracts, delivery orders placed against indefinite-delivery 
    contracts, or delivery orders placed against blanket purchase 
    agreements, or when the purchasing, requisitioning, or ordering 
    document provides for inspection and/or acceptance.
        (c) When NASA provides CQA and/or acceptance services for non-NASA 
    activities, the MIRR shall be prepared in accordance with the 
    instructions of this subpart unless the contract specifies otherwise.
    
    
    1846.670-3  Use.
    
        The DD Form 250 is a multipurpose report used for--
        (a) Providing evidence of CQA at origin or destination;
        (b) Providing evidence of acceptance at origin or destination;
        (c) Packing list documentation;
        (d) Receiving;
        (e) Shipping;
        (f) Contractor invoice; and
        (g) Contractor invoice support.
    
    
    1846.670-4  Multiple shipments.
    
        (a) If the ``shipped to,'' ``marked for,'' ``shipped from,'' 
    ``CQA,'' and ``acceptance'' data are the same for more than one 
    shipment made on the same day under the same contract in a single car, 
    truck, or other vehicle, one MIRR shall be prepared to cover all such 
    shipments.
        (b) If the volume of the shipments precludes the use of a single 
    car, truck, or other vehicle, a separate MIRR shall be provided for 
    each vehicle.
    
    
    1846.670-5  Forms.
    
        (a) Contractors may obtain MIRR forms from the contracting office 
    at no cost.
        (b) Contractors may print forms, provided their format and 
    dimensions are identical to the MIRR forms printed by the Government.
    
    
    1846.671  Contract quality assurance on shipments between contractors.
    
        (a) The supplier's commercial shipping document/packing list shall 
    indicate performance of required CQA actions at subcontract level.
        The following entries shall be made on the document/packing list:
    
        Required CQA of items has been performed.
    ----------------------------------------------------------------------
    (Signature of Authorized Government Representative)
    
    ----------------------------------------------------------------------
    (Date)
    
    ----------------------------------------------------------------------
    (Typed Name and Office)
    
        (b) Distribution for Government purposes shall be one copy each--
        (1) With shipment;
        (2) For the Government representative at consignee (via mail); and
        (3) For the Government representative at consignor.
    
    
    1846.672  Preparing DD Forms 250 and 250c.
    
    
    1846.672-1  Preparation instructions.
    
        (a) General. (1) Dates shall utilize seven spaces consisting of the 
    last two digits of the year, three-alpha month abbreviation, and two 
    digits for the day (e.g., 96SEP24).
        (2) Addresses shall consist of the name, street address/P.O. box, 
    city, State, and ZIP code.
        (3) The data entered in the blocks at the top of DD Form 250C shall 
    be identical to the comparable entries in Blocks 1, 2, 3, and 6 of the 
    DD Form 250.
        (4) Overflow data of the DD Form 250 shall be entered in Block 16 
    or in the body of the DD Form 250c with block cross reference. 
    Additional DD Form 250c sheets solely for continuation of Block 23 data 
    shall not be numbered or distributed as part of the MIRR.
        (b) Classified information. Classified information shall not appear 
    on the MIRR, nor shall the MIRR be classified.
        (c) Block 1--PROC. INSTRUMENT IDEN. (CONTRACT). Enter the contract 
    number, with its identifying center prefix, as contained in the 
    contractual document, including any call/order number.
        (d) Block 2--SHIPMENT NO. (1) The shipment number is a three-alpha 
    character prefix and a four-character numeric or alpha-numeric serial 
    number.
        (i) The prefix shall be controlled and assigned by the prime 
    contractor and shall consist of three alpha characters for each 
    ``shipped from'' address (Block 11). The prefix shall be different for 
    each ``Shipped From'' address and shall remain constant throughout the 
    contract period.
        (ii) The serial number for the first shipment under a prime 
    contract from
    
    [[Page 14026]]
    
    each ``shipped from'' address shall be 0001; subsequent shipments under 
    that prime contract shall be consecutively numbered. Alpha-numerics 
    shall be used when more than 9,999 numbers are required. Alpha-numerics 
    shall be serially assigned, with the alpha in the first position, 
    followed by the three-position numeric serial number. The alpha-numeric 
    sequence shall be (the letters I and O shall not be used) A001 through 
    A999 (10,001 through 10,999); B001 through B999 (11,001 through 
    11,999); to Z999. When this series is completely used, numbering shall 
    revert to 0001.
        (2) The shipment number of the initial shipment shall be reassigned 
    when a ``replacement shipment'' is involved (see paragraph (r)(4)(iv) 
    of this section).
        (3) The prime contractor shall control deliveries and on the last 
    shipment of the contract shall suffix the shipment number with a ``Z'' 
    in addition to that required for line items (see Block 17). If the 
    contract final shipment is from other than the prime contractor's 
    plant, the prime contractor may elect
        (i) To direct the subcontractor to suffix the ``Z'' or
        (ii), On receipt of the subcontractor final shipment information, 
    to correct the DD Form 250 covering the last shipment from the prime 
    contractor's plant by adding a ``Z'' to that shipment number.
        (e) Block 3--DATE SHIPPED. Enter the date the shipment is released 
    to the carrier or the date of completion of services. If the shipment 
    will be released after the date of CQA and/or acceptance, enter the 
    estimated date of release. When the date is estimated, enter an ``E'' 
    after it. Distribution of the MIRR shall not be delayed for entry of 
    the actual shipping date. Reissurance of the MIRR is not required to 
    show the actual shipping date.
        (f) Block 4--B/L TCN. When applicable, enter the commercial or 
    Government bill of lading number after ``B/L''; and the Transportation 
    Control Number after ``TCN.''
        (g) Block 5--DISCOUNT TERMS. (1) The Contractor may enter the 
    discount in terms of percentages on all copies of the MIRR.
        (2) When the MIRR is used as an invoice, see 1846.672-5.
        (h) Block 6--INVOICE. (1) The contractor may enter the invoice 
    number and actual or estimated date on all copies of the MIRR. When the 
    date is estimated, enter an ``E'' after the date. Do not correct MIRRs 
    other than invoice copies to reflect the actual date of invoice 
    submission.
        (2) When the MIRR is used as an invoice, see 1846.672-5.
        (i) Block 7--PAGE/OF. Consecutively number the pages comprising the 
    MIRR. On each page, enter the total number of pages of the MIRR.
        (j) Block 8--ACCEPTANCE POINT. Enter an ``S'' for origin or ``D'' 
    for destination as specified in the contract as the point of 
    acceptance. Enter an alphabetic ``O'' for other if the point of 
    acceptance is not specified in the contract.
        (k) Block 9--PRIME CONTRACTOR. Enter the code and address.
        (l) Block 10--ADMINISTERED BY. Enter the code and address of the 
    contracting office cited in the contract.
        (m) Block 11--SHIPPED FROM/CODE/FOB. (1) Enter the code and address 
    of the ``shipped from'' location. If identical to Block 9, enter ``See 
    Block 9.''
        (2) For performance of services that do not require delivery of 
    items upon completion, enter the code and address of the location at 
    which the services were performed. If the DD Form 250 covers 
    performance at multiple locations or if identical to Block 9, enter 
    ``See Block 9.''
        (3) Enter on the same line and to the right of ``FOB'' an ``S'' for 
    origin or ``D'' for destination as specified in the contract. Enter an 
    alphabetic ``O'' if the FOB point cited in the contract is other than 
    origin or destination.
        (n) Block 12--PAYMENT WILL BE MADE BY. Enter the address of the 
    payment office cited in the contract.
        (o) Block 13--SHIPPED TO/CODE. Enter the code and address from the 
    contract or shipping instructions.
        (p) Block 14--MARKED FOR/CODE. Enter the code and address from the 
    contract or shipping instructions.
        (q) Block 15--ITEM NO. Enter the item number used in the contract. 
    If four or fewer digits are used, position them to the left of the 
    vertical dashed line. Where a six-digit identification is used, enter 
    the last two digits to the right of the vertical dashed line.
        (r) Block 16--STOCK/PART NO./DESCRIPTION. (1) Enter, as applicable, 
    for each item, using single spacing between each line item, the 
    following:
        (i) The Federal Stock Number (FSN) or noncatalog number and, if 
    applicable, prefix or suffix. When a number is not provided or it is 
    necessary to supplement the number, include other identification such 
    as the manufacturer's name or Federal Supply Code (as published in 
    Cataloging Handbook H4-1), and part numbers. Additional part numbers 
    may be shown in parentheses. Also enter the descriptive noun of the 
    item nomenclature and, if provided, the Government-assigned management/
    material control code. In the case of equal-kind supply items, the 
    first entry shall be the description without regard to kind (e.g., 
    ``Resistor''). Below this description, enter the contract item number 
    in Block 15 and stock/part number followed by the size or type in Block 
    16.
        (ii) On the next printing line, if required by the contract for 
    control purposes, enter the make, model, serial number, lot, batch, 
    hazard indicator, and/or similar description.
        (iii) On the next printing line, enter the FEDSTRIP requisition 
    number(s) when provided in the contract or shipping instructions.
        (2) For service items, enter the word ``SERVICE'' followed by a 
    short description of less than 20 characters. Do not complete items 4, 
    13, and 14 when material is not shipped.
        (3) For all contracts administered by the Defense Contract 
    Management Command, with the exception of fast pay procedures, enter 
    and complete the following:
    
    Gross Shipping Wt.____(State weight in pounds only).
    
        (4) Enter on the next line the following as appropriate (entries 
    may be extended through Block 20). When entries apply to more than one 
    item in the MIRR, enter them only once after the last item and 
    reference the applicable item numbers.
        (i) Enter in capital letters any special handling instructions/
    limits for material environmental control (e.g., temperature, humidity, 
    aging, freezing, and shock).
        (ii) When an FSN is required by, but not cited in, a contract and 
    has not been furnished by the Government, shipment may be made at the 
    direction of the contracting officer. Enter the authority for the 
    shipment.
        (iii) When Government-furnished property (GFP) is included with or 
    incorporated into the line item, enter ``GFP''.
        (iv) When the shipment consists of replacements for supplies 
    previously furnished, enter in capital letters ``REPLACEMENT SHIPMENT'' 
    (see paragraph (s)(3) of this section for replacement indicators.)
        (v) For items shipped with missing components, enter and complete 
    the following: ``Item(s) shipped short of the following component(s): 
    FSN or comparable identification ________, Quantity ________, Estimated 
    Value ________, Authority ________.''
        (vi) When shipment is made of components that were short on a prior 
    shipment, enter and complete the following: ``These components were
    
    [[Page 14027]]
    
    listed as shortages on Shipment Number ________, date 
    shipped________.''
        (vii) When shipments involve drums, cylinders, reels, containers, 
    skids, etc., designated as returnable under contract provisions, enter 
    and complete the following: ``Return to ________, Quantity ________, 
    Item ________, Ownership (Government/contractor).''
        (viii) Enter shipping container number(s), the type, and the total 
    number of the shipping container(s) included in the shipment.
        (ix) The MIRR shall be used to record and report the waivers and 
    deviations from contract specifications, including the source and 
    authority for the waiver or deviation (e.g., the contracting office 
    authorizing the waiver or deviation and the identification of the 
    authorizing document).
        (x) For shipments involving discount terms, enter ``DISCOUNT 
    EXPEDITE'' in at least one-inch outline-type letters.
        (xi) When test/evaluation results are a condition of acceptance and 
    are not available before shipment, the following note shall be entered 
    if the shipment is approved by the contracting officer: ``Note: 
    Acceptance and payment are contingent upon receipt of approved test/
    evalution results.'' The contracting officer shall advise (A) the 
    consignee of the results (approval/disapproval) and (B) the contractor 
    to withhold invoicing pending attachment to its invoice of the approved 
    test/evaluation results.
        (xii) The copy of the DD Form 250 required to support payment for 
    destination acceptance (top copy of the four with shipment) or 
    Alternative Release Procedure (ARP) origin acceptance (additional copy 
    furnished to the Quality Assurance Representative (QAR)) shall be 
    identified by entering ``PAYMENT COPY'' in approximately one-half-inch 
    outline-type letters with ``FORWARD TO BLOCK 12 ADDRESS'' in 
    approximately one-quarter-inch letters immediately below. Do not 
    obliterate any other entries.
        (xiii) A double line shall be drawn completely across the form 
    following the last entry.
        (s) Block 17--QUANTITY SHIP/REC'D. (1) Enter the quantity shipped, 
    using the unit of measure indicated in the contract for payment. When a 
    second unit of measure is used for purposes other than payment, enter 
    the appropriate quantity directly below in parentheses.
        (2) Enter a ``Z'' below the first digit of the quantity when the 
    total quantity of the item is delivered, including variations within 
    contract terms; and all shortages on items previously shipped short are 
    delivered.
        (3) If a replacement shipment is involved, enter below the first 
    digit of the quantity the letter ``A'' top designate first replacement, 
    ``B'' for second replacement, and so forth. The final shipment 
    indicator ``Z'' shall not be used when a final line item shipment is 
    replaced.
        (t) Block 18 UNIT. Enter the abbreviation of the unit of measure 
    indicated in the contract for payment. When a second unit of measure is 
    indicated in the contract for purposes other than payment or is used 
    for shipping purposes, enter the abbreviation of the second unit of 
    measure directly below in parentheses. Authorized abbreviations are 
    listed in MIL-STD-129, Marking for Shipping and Storage.
        (u) Block 19--UNIT PRICE. Enter the unit price on all NASA copies 
    whenever the MIRR is used for voucher or receiving purposes.
        (v) Block 20--AMOUNT. Enter the extended amount when the unit price 
    is entered in Block 19.
        (w) Block 21--CONTRACT QUALITY ASSURANCE. The words ``conform to 
    contract'' contained in the printed statements in Blocks A and B relate 
    to contract obligations pertaining to quality and to the quantity of 
    the items on the report. The statements shall not be modified. Notes 
    taking exception shall be entered in Block 16 or on attached supporting 
    documents with block cross reference.
        (1) ``A. ORIGIN.''
        (i) The authorized Government representative shall--
        (A) Place an ``X'' when applicable in the appropriate CQA and/or 
    acceptance box(es) to evidence origin CQA and/or acceptance. When the 
    contract requires CQA at destination in addition to origin CQA, an 
    asterisk shall be entered at the end of the statement and an 
    explanatory note in Block 16;
        (B) Sign and date; and
        (C) Enter the typed, stamped, or printed name of the signer and 
    office code.
        (2) ``B. DESTINATION.''
        (i) When acceptance at origin is indicated in Block 21A, no entries 
    shall be made in Block 21B.
        (ii) When acceptance of CQA and acceptance are at destination, the 
    authorized Government representative shall--
        (A) Place an ``X'' in the appropriate box(es);
        (B) Sign and date; and
        (C) Enter the typed, stamped, or printed name of the signer and 
    office code.
        (x) Block 22--RECEIVER'S USE. This block shall be used by the 
    receiving authority (Government or contractor) to denote receipt, 
    quantity, and condition. The receiving activity shall enter in this 
    block the date the supplies arrived. For example, when off-loading or 
    in-checking occurs subsequent to the day of arrival of the carrier at 
    the installation, the date of the carrier's arrival is the date 
    received for purposes of this block.
        (y) Block 23--CONTRACTOR USE ONLY. This block is provided and 
    reserved for contractor use.
    
    
    1846.672-2  Consolidated shipments.
    
        When individual shipments are held at the contractor's plant for 
    authorized transportation consolidation to a single destination on a 
    single bill of lading, the applicable DD Forms 250 may be prepared at 
    the time of CQA or acceptance prior to the time of actual shipment (see 
    Block 3).
    
    
    1846.672-3  Multiple consignee instructions.
    
        The contractor may prepare one MIRR when the identical item(s) of a 
    contract is to be shipped to more than one consignee, with the same or 
    varying quantities, and the shipment requires origin acceptance. 
    Prepare the MIRR using the procedures in this subpart with the 
    following changes:
        (a) Blocks 2, 4, 13, and, if applicable, 14--Enter ``See Attached 
    Distribution List.''
        (b) Block 15--The contractor may group item numbers for identical 
    stock/part number and description.
        (c) Block 17--Enter the ``total'' quantity shipped by item or, if 
    applicable, grouped identical items.
        (d) Use the DD Form 250c to list each individual ``Shipped To'' and 
    ``Marked For'' with--
        (1) Code(s) and complete shipping address and a sequential shipment 
    number for each;
        (2) Item number(s);
        (3) Quantity;
        (4) The FEDSTRIP requisition number and quantity for each when 
    provided in the contract or shipping instructions; and
        (5) If applicable, bill of lading number and mode of shipment code.
    
    
    1846.672-4  Correction instructions.
    
        When, because of errors or omissions, it is necessary to correct 
    the MIRR after distribution, it shall be revised by correcting the 
    original master and distributing the corrected form. The corrections 
    shall be made as follows:
        (a) Circle the error and place the corrected information in the 
    same block. If space is limited, enter the corrected information in 
    Block 16, referencing the error page and block.
    
    [[Page 14028]]
    
        (b) When corrections are made to Blocks 15 and 17, enter the words 
    ``CORRECTIONS HAVE BEEN VERIFIED'' on page 1. The authorized Government 
    representative shall date and sign immediately below the statement. 
    This verification statement and signature are not required for other 
    corrections.
        (c) MIRRs shall not be corrected for Block 19 and 20 entries.
        (d) Clearly mark pages of the MIRR requiring correction with the 
    words ``CORRECTED COPY'', avoiding obliteration of any other entries. 
    Even though corrections are made on continuation sheets only, also mark 
    page 1 ``CORRECTED COPY''.
        (e) Page 1 and only those continuation pages marked ``CORRECTED 
    COPY'' shall be distributed to the initial distribution. A complete 
    MIRR with corrections shall be distributed to new addressee(s) created 
    by error corrections.
    
    
    1846.672-5  Invoice instructions.
    
        The Government encourages, but does not require, contractors to use 
    copies of the MIRR as an invoice in lieu of a commercial form. If the 
    MIRR is used as an invoice, four copies shall be prepared and forwarded 
    to the payment office as follows:
        (a) Complete Blocks 5, 6, 19, and 20.
        (b) Mark, in letters approximately one inch high, the first copy 
    ``ORIGINAL INVOICE'' and the remaining three copies ``INVOICE COPY''.
        (c) Forward the four copies to the payment office (Block 12 
    address).
    
    
    1846.672-6  Packing list instructions.
    
        Copies of the MIRR may be used as a packing list. The packing list 
    copies shall be in addition to the copies of the MIRR required for 
    distribution (see 1846.673) and shall be marked ``PACKING LIST''.
    
    
    1846.672-7  Receiving instructions.
    
        When the MIRR is used for receiving purposes, procedures shall be 
    as prescribed by local directives. If acceptance or CQA and acceptance 
    of supplies are required upon arrival at destination, see Block 21B for 
    instructions.
    
    
    1846.673  Distribution of DD Forms 250 and 250c.
    
        (a) DD Forms 250 and 250c shall be distributed in accordance with 
    installation procedures.
        (b) The contractor is responsible for distributing DD Forms 250 and 
    250c in accordance with the provisions of the contract or instructions 
    of the contracting officer.
    
    
    1846.674  Contract clause.
    
        The contracting officer shall insert the clause at 1852.246-72, 
    Material Inspection and Receiving Report, in solicitations and 
    contracts, except those using simplified acquisition procedures or 
    where the only deliverable items are technical or scientific reports. 
    Insert the number of copies to be prepared. Paragraph (a) may be 
    changed to specify advance copies or separate distribution of the DD 
    Form 250.
    
    Subpart 1846.7--Warranties
    
    
    1846.703  Criteria for use of warranties.
    
    
    1846.703-70  Additional criteria.
    
        In deciding whether to use a warranty clause, at least the 
    following factors shall be considered in addition to those at FAR 
    46.703:
        (a) Cost of correction or replacement, either by the contractor or 
    by another source, in the absence of a warranty;
        (b) The warranty as a deterrent against the furnishing of defective 
    or nonconforming supplies;
        (c) Whether the contractor's quality program is reliable enough to 
    provide adequate protection without a warranty, or, if not, whether a 
    warranty would cause the contractor to institute an effective quality 
    program;
        (d) Reliance on ``brand-name'' integrity; and
        (e) Whether a warranty is regularly given for a commercial 
    component of a more complex end item.
    
    
    1846.704  Authority for use of warranties. (NASA paragraphs (1), (2) 
    and (3))
    
        (1) A warranty clause may be used when it is found to be in the 
    best interests of the Government, after an analysis of the factors 
    listed in 1846.703-70 and FAR 46.703.
        (2) Except for the warranty of commercial items (see FAR 12.404 and 
    46.709), and warranties contained in Federal, military, or construction 
    specifications, the decision to use a warranty clause or to include a 
    warranty provision in a specification other than a Federal, military, 
    or construction specification shall be made only upon the written 
    authorization of the procurement officer or a designee. This decision 
    may be made either for individual acquisitions or classes of 
    acquisitions.
        (3) Warranties required by applicable architect-engineer 
    specifications shall be included in construction contracts.
    
    
    1846.770  Administration.
    
        When notified of a defect in warranted items, the contracting 
    officer should ascertain whether the warranty is currently in effect 
    and ensure that the contractor is given proper and timely notice of the 
    defect.
        15. Part 1847 is revised to read as follows:
    
    PART 1847--TRANSPORTATION
    
    Subpart 1847.2--Contracts for Transportation or for Transportation-
    Related Services
    
    Sec.
    1847.200  Scope of subpart.
    1847.200-70  Charter of aircraft.
    
    Subpart 1847.3--Transportation in Supply Contracts
    
    1847.304  Determination of delivery terms.
    1847.304-3  Shipments from CONUS for overseas delivery.
    1847.304-370  NASA export privilege.
    1847.305  Solicitation provisions, contract clauses, and 
    transportation factors.
    1847.305-10  Packing, marking, and consignment instructions.
    1847.305-13  Transit arrangements.
    1847.305-70  NASA contract clauses.
    
    Subpart 1847.5--Ocean Transportation by U.S.-Flag Vessels
    
    1847.506  Procedures.
    
    Subpart 1847.70--Protection of the Florida Manatee
    
    1847.7001  Contract clause.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1847.2--Contracts for Transportation or for Transportation-
    Related Services
    
    
    1847.200  Scope of subpart.
    
    
    1847.200-70  Charter of aircraft.
    
        When acquiring aircraft by charter, contracting officers shall 
    comply with NHB 7900.3, Aircraft Operations Management Manual.
    
    Subpart 1847.3--Transportation in Supply Contracts
    
    
    1847.304  Determination of delivery terms.
    
    
    1847.304-3  Shipments from CONUS for overseas delivery.
    
    
    1847.304-370  NASA export privilege.
    
        NASA has export licensing privileges for moving commodities to 
    foreign destinations. Contracting officers shall request the advice of 
    the Center Export Administrator to ensure full and appropriate use is 
    made of these privileges.
    
    
    1847.305  Solicitation provisions, contract clauses, and transportation 
    factors.
    
    
    1847.305-10  Packing, marking, and consignment instructions.
    
        In contracts providing for delivery f.o.b. origin and shipment 
    under Government bills of lading, consignment instructions may be 
    limited to the mail address of the
    
    [[Page 14029]]
    
    consignee (receiving activity), provided the contract instructions 
    state: ``Shipment other than mail shall be consigned as indicated on 
    the Government bill of lading furnished to the contractor.''
    
    
    1847.305-13  Transit arrangements. (NASA supplements paragraph (a))
    
        (a)(3)(ii) When the provision at FAR 52.247-56 is used, the 
    solicitation shall state that offers will be evaluated on the basis of 
    the lowest overall cost to the Government, including transportation 
    costs to NASA from point of origin to final destination, taking into 
    account any applicable transit privileges.
    
    
    1847.305-70  NASA contract clauses.
    
        (a) The contracting officer may insert a clause substantially as 
    stated at 1852.247-72, Advance Notice of Shipment, in solicitations and 
    contracts when the f.o.b. point is destination and special Government 
    assistance is required in the delivery or receipt of the items.
        (b) The contracting officer may insert a clause substantially as 
    stated at 1852.247-73, Shipment of Government Bills of Lading, in 
    f.o.b. origin solicitations and contracts.
    
    Subpart 1847.5--Ocean Transportation by U.S.-Flag Vessels
    
    
    1847.506  Procedures. (NASA supplements paragraph (d))
    
        (d)(i) The transportation officer in each installation shall 
    establish and maintain a register to reflect adherence to the Cargo 
    Preference Act. The register shall contain data related to shipments 
    made by the installation and by NASA contractors. Where no 
    transportation officer is available, it shall be maintained by the 
    contracting office. The register shall contain pertinent details of 
    ocean shipments including, but not limited to, the ports of origin and 
    destination of shipments, commodity descriptions, gross weight, freight 
    revenue, name of vessel, operator of vessel, and date of loading. The 
    register shall be maintained current and organized so that adherence to 
    the Cargo Preference Act can be ascertained at all times. To the 
    maximum practicable extent, compliance with the 50-percent minimum 
    requirements of the Cargo Preference Act shall be maintained on a 
    quarter-year basis; any deficiencies in maintaining compliance shall be 
    corrected by the end of the calendar year.
        (ii) On the basis of the registers maintained under paragraph 
    (d)(i) of this section, the official maintaining the register shall 
    submit quarterly reports reflecting ocean shipments to the Division of 
    National Cargo, Office of Market Development, Maritime Administration, 
    Department of Transportation, Washington, DC, 20590. Negative reports 
    are required when applicable.
    
    Subpart 1847.70--Protection of the Florida Manatee
    
    
    1847.7001  Contract clause.
    
        The contracting officer shall insert the clause at 1852.247-71, 
    Protection of the Florida Manatee, in solicitations and contracts when 
    deliveries or vessel operations, dockside work, or disassembly 
    functions under the contract will involve use of waterways inhabited by 
    manatees. The clause shall also be included in applicable subcontracts 
    (including vendor deliveries).
        16. Part 1848 is revised to read as follows:
    
    PART 1848--VALUE ENGINEERING
    
    Subpart 1848.1--Policies and Procedures
    
    Sec.
    1848.102  Policies.
    1848.103  Processing value engineering change proposals.
    1848.104  Sharing arrangements.
    1848.104-2  Sharing collateral savings.
    
    Subpart 1848.2--Contract Clauses
    
    1848.201  Clauses for supply or service contracts.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1848.1--Policies and Procedures
    
    
    1848.102  Policies. (NASA supplements paragraphs (a) and (f))
    
        (a) The Associate Administrator for Procurement (Code HS) is the 
    approval authority for exemptions.
        (f) In calculating instant or future contract savings on firm-
    fixed-price contracts when the parties have not set out a specific 
    figure for profit, the contracting officer shall use the total contract 
    price as the basis for calculating the savings.
    
    
    1848.103  Processing value engineering change proposals. (NASA 
    supplements paragraph (a))
    
        (a) Upon receipt of a VECP, the contracting officer shall promptly 
    forward it to the technical officer responsible for the contract with 
    the following information:
        (i) Date of VECP receipt;
        (ii) Date for notifying the contractor of VECP acceptance or 
    rejection;
        (iii) Notification of the potential for awarding concurrent, 
    future, or collateral savings to the contractor if the VECP is 
    accepted;
        (iv) Request for a technical evaluation, with complete rationale 
    for recommended acceptance or rejection, to include if acceptance is 
    recommended:
        (A) An estimate of the type of savings, Government costs, etc., 
    that can be expected from its acceptance;
        (B) A procurement request setting forth the specification changes 
    to be used in any contract modification accepting the VECP in whole or 
    in part; and
        (C) Additional funds if acceptance of the VECP results in negative 
    instant contract savings.
        (v) Technical evaluation due date.
    
    
    1848.104  Sharing arrangements.
    
    
    1848.104-2  Sharing collateral savings.
    
        The contracting officer is authorized to make the determination 
    that the cost of calculating and tracking collateral savings will 
    exceed the benefits to be derived.
    
    Subpart 1848.2--Contract Clauses
    
    
    1848.201  Clauses for supply or service contracts. (NASA supplements 
    paragraphs (a), (b), (c), and (d))
    
        (a)(6) The Associate Administrator for Procurement (Code HS) is the 
    approval authority for exemptions.
        (b) The contracting officer shall not insert the clause at FAR 
    52.248-1, Value Engineering, either with or without its Alternates, in 
    an R&D contract where the statement of work is essentially an 
    incorporation by reference of the prospective contractor's proposal. If 
    any other part of the statement of work in such a contract reflects a 
    Government specification that might benefit from application of VE 
    techniques, the contracting officer shall consider inserting the VE 
    incentive clause at FAR 52.248-1 with any applicable Alternate(s), and 
    establish the applicability of the clause to that part.
        (c) Except as prescribed in paragraph (b) of this section, the 
    contracting officer shall insert the clause at FAR 52.248-1 with its 
    Alternate I in initial production contracts for major systems, and 
    major systems R&D contracts for full-scale development, unless the 
    contracting officer determines in writing that its use is 
    inappropriate. Use of Alternate I is appropriate for an R&D major 
    systems contract only if the contract specifications contain detailed 
    requirements that lend themselves to VE.
        (d) The contracting officer shall insert the clause at FAR 52.248-1 
    with its Alternate II under the conditions prescribed in paragraph (c) 
    of this section
    
    [[Page 14030]]
    
        17. Part 1849 is revised to read as follows:
    
    PART 1849--TERMINATION OF CONTRACTS
    
    Subpart 1849.1--General Principles
    
    Sec.
    1849.101  Authorities and responsibilities.
    1849.101-70  NASA authorities and responsibilities.
    1849.101-71  Termination authority.
    1849.102  Notice of termination.
    1849.102-70  Prior clearance of significant contract terminations.
    1849.105  Duties of termination contracting officer after issuance 
    of notice of termination.
    1849.105-70  Termination docket checklist.
    1849.110  Settlement negotiation memorandum.
    1849.110-70  Memorandum contents.
    1849.111  Review of proposed settlements.
    
    Subpart 1849.5--Contract Termination Clauses
    
    1849.505  Other termination clauses.
    1849.505-70  NASA contract clause.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1849.1--General Principles
    
    
    1849.101  Authorities and responsibilities.
    
    
    1849.101-70  NASA authorities and responsibilities.
    
        (a) Installations shall appoint a termination contracting officer 
    (TCO) (see FAR 2.101) to perform specific duties relating to contract 
    termination as one of that individual's primary functions. In addition 
    to the responsibilities described in this part and FAR part 49, such 
    duties should include--
        (1) Reviewing NASA Forms 1412, Termination Authority;
        (2) Reviewing the contract and related documents before issuing the 
    notice of termination, to ensure protection of the Government's rights 
    under the contract; and
        (3) Issuing notices of termination, reinstatement, and recision to 
    contractors;
        (b) Contracting offices shall utilize the services of the 
    Department of Defense and other Government agencies whenever possible 
    to administer and negotiate settlement of terminated contracts. 
    Delegation of the negotiation of termination settlement function shall 
    be made in accordance with FAR subpart 42.2 and 1842.2.
    
    
    1849.101-71  Termination authority.
    
        NASA Form 1412, Termination Authority, is prescribed for use by 
    NASA installations when initiating action to terminate a contract for 
    convenience or default. The project manager or the activity initiating 
    the procurement request should initiate the action by completing NASA 
    Form 1412 and submitting it to the contracting officer.
    
    
    1849.102  Notice of termination.
    
    
    1849.102-70  Prior clearance of significant contract terminations.
    
        (a) Congressional notification is required for any termination 
    involving a reduction in employment of 100 or more contractor 
    employees. Proposed terminations must be cleared through the 
    Headquarters Office of Legislative Affairs (Code LB) before release of 
    the termination notice, or any information on the proposed termination, 
    to the contractor. Proposed terminations expected to result in a 
    reduction of fewer than 100 should be similarly cleared if the 
    installation believes it to be significant.
        (b) The contracting officer shall submit the following information 
    to Code LB, and a copy to the Office of Procurement (Code HS), as soon 
    as possible after the decision to terminate is made. Until clearance is 
    obtained, this information shall be treated as ``For Official Use 
    Only'' unless the information is classified.
        (1) Contract number.
        (2) Date of award.
        (3) Type of award.
        (4) Name of company.
        (5) Nature of contract or end item.
        (6) Reasons for the termination.
        (7) Contract price of items terminated.
        (8) Total number of contractor employees involved, including the 
    Government's estimate of the number that may be discharged.
        (9) Anticipated impact on the company and the community.
        (10) Name of the community affected.
        (11) Area labor category.
        (12) Whether contractor is large or small business.
        (13) Any known impact on disadvantaged employment programs.
        (14) Total number of subcontractors involved and the impact in this 
    area, if known.
        (15) Unclassified draft of suggested press release.
        (c) To minimize termination costs, Code LB shall act promptly on 
    the request and provide a response not later than two working days 
    after receipt of the information in paragraph (b) of this section.
    
    
    1849.105  Duties of termination contracting officer after issuance of 
    notice of termination.
    
    
    1849.105-70  Termination docket checklist.
    
        The termination contracting officer shall complete NASA Form 1413, 
    Termination Docket Checklist.
    
    
    1849.110  Settlement negotiation memorandum.
    
    
    1849.110-70  Memorandum contents.
    
        The TCO shall include the following information in the settlement 
    negotiation memorandum. Contractors and subcontractors are encouraged 
    to use this format appropriately modified for subcontract settlements 
    submitted for review and approval.
        (a) General information--(1) Identification. (i) Name and address 
    of the contractor and any pertinent affiliation between prime 
    contractors and subcontractors relative to the overall settlement.
        (ii) Names and titles of contractor and Government personnel who 
    participated in the negotiation.
        (2) Description of terminated contract.
        (i) Contract number;
        (ii) Date of award;
        (iii) Contract type;
        (iv) General description of contract items;
        (v) Total contract price; and
        (vi) Applicable contract termination provisions and clause.
        (3) Termination notice.
        (i) Date of the termination notice;
        (ii) Effective date of termination;
        (iii) Scope and nature of termination (complete or partial);
        (iv) Items terminated;
        (v) Unit prices;
        (vi) Total price of items terminated for fixed-price contracts or 
    the estimated cost and fee applicable to items terminated for cost-
    reimbursement type contracts;
        (vii) Whether the termination notice was amended and, if so, why;
        (viii) Whether the contractor stopped work on the termination 
    effective date (if it did not, furnish details) and whether 
    subcontracts were terminated promptly;
        (ix) Any redirection of common items and return of goods to the 
    contractor's suppliers; and
        (x) Extent of contract performance and timely deliveries by the 
    contractor.
        (b) Contractor's settlement proposal--(1) Date and amount. Date and 
    location where the claim was filed and its gross amount (if interim 
    settlement proposals were filed, information shall be furnished for 
    each claim).
        (2) Basis of claim. E.g., inventory, total cost, or other basis, 
    including an explanation of any approvals granted in connection with 
    submission on other than an inventory basis.
        (3) Examination of proposal. Types of reviews made and by whom 
    (audit, engineering, legal, or other).
        (c) Tabular summary of contractor's claim and the settlement. The 
    cost
    
    [[Page 14031]]
    
    elements/items, the amounts claimed, the Government recommended 
    position (including auditor, field, and technical personnel 
    recommendations), and the negotiated settlement amounts. This summary 
    shall include, if appropriate, previously reimbursed and unreimbursed 
    costs applicable to the prime contractor and subcontractor, previous 
    profit/fees paid and unpaid; settlement cost less disposal credit or 
    other credits, and a recapitulation of previous settlements. The 
    summary of the negotiated settlement shall include the amount claimed 
    and allowed for contractor and/or subcontractor changes, disposal, 
    prior payment credits, and contract price.
        (d) Settlement narrative summary.
        (1) Contractor's cost.
        (2) Profit/Fee.
        (3) Settlement expenses not included in the audit.
        (4) Number and dollar amount of any subcontractor settlements 
    approved by the TCO and concluded by the contractor under delegation of 
    authority.
        (5) Total amount of any partial payments.
        (6) Total of unliquidated progress or advance payments.
        (7) Claims of the Government against the contractor included in 
    settlement agreement reservations.
        (8) Assignments, including the name and address of each assignee.
        (9) Disposal credits.
        (10) Status of plant clearance actions and all inventory sold, 
    retained, or otherwise properly disposed of in accordance with 
    applicable plant clearance regulations, including a consolidated 
    closing plant clearance report, if applicable.
        (11) Status of Government property accountability.
        (12) Disposition of any special tooling, if applicable.
        (13) Proposed reservations of rights to the Government or to the 
    contractor.
        (e) Recommendation. Amount of the gross settlement recommended and 
    TCO statement that it is fair and reasonable to the Government and the 
    contractor.
        (f) TCO Signature and date.
    
    
    1849.111  Review of proposed settlements. (NASA paragraphs (1) and (2))
    
        (1) Settlements shall be reviewed in accordance with center-
    prescribed procedures.
        (2) The TCO may authorize the contract administration office 
    cognizant of a lower-tier subcontractor grant approval or ratification 
    of proposed subcontractor settlements described in FAR 49.108-3(c) that 
    are first reviewed and referred by the prime contractor to the TCO. 
    This procedure is not applicable to settlements between the contractor 
    and its first tier subcontractors.
    
    Subpart 1849.5--Contract Termination Clauses
    
    
    1849.505  Other termination clause.
    
    
    1849.505-70  NASA contract clause.
    
        The contracting officer shall insert the clause at 1852.249-72, 
    Termination (Utilities), in all solicitations and contracts for 
    utilities services.
        18. Part 1850 is revised to read as follows:
    
    PART 1850--EXTRAORDINARY CONTRACTUAL ACTIONS
    
    Subpart 1850.2--Delegation of and Limitations on Exercise of Authority
    
    Sec.
    1850.202  Contract adjustment boards.
    
    Subpart 1850.3--Contract Adjustments
    
    1850.305  Processing cases.
    1850.305-70  Submission of request to the Contract Adjustment Board.
    1850.306  Disposition.
    1850.306-70  Implementation of the Contract Adjustment Board's 
    decision.
    
    Subpart 1850.4--Residual Powers
    
    1850.403  Special procedures for unusually hazardous or nuclear 
    risks.
    1850.403-1  Indemnification requests.
    1850.403-170  Subcontractor indemnification requests.
    1850.403-2  Action on indemnification requests.
    1850.470  Lead NASA installation.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1850.2--Delegation of and Limitations on Exercise of 
    Authority
    
    
    1850.202  Contract adjustment boards.
    
        14 CFR part 1209, subpart 3, Contract Adjustment Board, establishes 
    the Contract Adjustment Board (CAB) as the approving authority to 
    consider and dispose of requests from NASA contractors for 
    extraordinary contractual actions.
    
    Subpart 1850.3--Contract Adjustments
    
    
    1850.305  Processing cases.
    
    
    1850.305-70  Submission of request to the Contract Adjustment Board.
    
        (a) After investigating the facts and issues relevant to the 
    contractor's request, the contracting officer shall forward the request 
    to the Associate General Counsel for General Law (Code GG), including 
    in the forwarding letter--
        (1) The nature of the case;
        (2) The recommended disposition; and,
        (3) If contractual action is recommended, the contracting officer's 
    opinion that the action will facilitate the national defense.
        (b) The forwarding letter shall enclose the contractor's request, 
    all supporting material submitted by the contractor, and any material 
    the contracting officer has obtained while investigating the facts and 
    issues relevant to the request. Any classified information in the 
    material forwarded shall be so identified.
        (c) Electronic submittal is preferred for unclassified material.
    
    
    1850.306  Disposition.
    
    
    1850.306-70  Implementation of the Contract Adjustment Board's 
    decision.
    
        (a) The contracting officer shall take action authorized in the 
    CAB's decision.
        (b) Immediately upon execution, including any required Headquarters 
    approval, of a contract or contract modification or amendment 
    implementing the CAB decision, the contracting officer shall forward a 
    copy of the contractual document to the Associate General Counsel for 
    General Law (Code GG).
    
    Subpart 1850.4--Residual Powers
    
    
    1850.403  Special procedures for unusually hazardous or nuclear risks.
    
    
    1850.403-1  Indemnification requests. (NASA supplements paragraph (a))
    
        (a) The contractor shall also provide evidence, such as a 
    certificate of insurance or other customary proof of insurance, that 
    such insurance is either in force or is available and will be in force 
    during the indemnified period.
    
    
    1850.403-170  Subcontractor indemnification requests.
    
        Subcontractors shall submit requests for indemnification to the 
    prime contractor and through higher tier subcontractor(s), as 
    applicable. If the prime contractor agrees an indemnity clause should 
    be flowed down to the subcontractor, the prime contractor shall forward 
    its written request for subcontractor indemnification to the cognizant 
    contracting officer for approval in accordance with FAR 50.403-1. The 
    prime contractor's request shall provide information responsive to 
    1850.403-1, FAR 50.403-1, and FAR 50.403-2(a) (1), (2), (4), (5) and 
    (7). The agreed upon definition of the unusually hazardous risk to be 
    incorporated into the subcontract shall be the same as that 
    incorporated in the prime contract.
    
    [[Page 14032]]
    
    1850.403-2  Action on indemnification requests. (NASA supplements 
    paragraphs (a) and (d))
    
        (a) If recommending approval, the contracting officer shall forward 
    the required information to the Associate Administrator for Procurement 
    (Code HS), along with the following:
        (i) For contracts of five years duration or longer, a 
    determination, with supporting rationale, whether the indemnification 
    approval and insurance coverage and premiums should be reviewed for 
    adequacy and continued validity at points in time within the extended 
    contract period.
        (ii) A recommended Memorandum of Decision. In addition to the 
    applicable requirements of FAR 50.306, the Memorandum of Decision shall 
    contain the following:
        (A) The specific definition of the unusually hazardous risk to 
    which the contractor is exposed in the performance of the contract(s);
        (B) A complete discussion of the contractor's financial protection 
    program; and
        (C) The extend to, and conditions under, which indemnification is 
    being approved for subcontracts.
        (d) If approving subcontractor indemnification, the contracting 
    officer shall document the file with a memorandum for record addressing 
    the items set forth in FAR 50.403-2(a) and include an analysis of the 
    subcontractor's financial protection program. In performing this 
    analysis, the contracting officer shall take into consideration the 
    availability, cost, terms and conditions of insurance in relation to 
    the unusually hazardous risk.
    
    
    1850.470  Lead NASA installation.
    
        (a) Contractors applying for indemnification shall determine which 
    NASA installation has the highest dollar amount of contracts for which 
    indemnification is requested. The indemnification request should be 
    submitted to the procurement officer for that installation, who will 
    then designate a cognizant contracting officer. Contractors shall 
    submit a single request and ensure duplicate requests are not submitted 
    by associate divisions, subsidiaries, or central offices of the 
    contractor.
        (b) The receiving installation will become the lead installation 
    and will remain so indefinitely. Lead installation designation may 
    change to another installation if the affected procurement officers 
    agree to the change. Should a change occur in the lead installation, 
    all records related to indemnification of that contractor shall be 
    transferred to the gaining installation.
        19. Part 1851 is revised to read as follows:
    
    PART 1851--USE OF GOVERNMENT SOURCES BY CONTRACTORS
    
    Subpart 1851.1--Contractor Use of Government Supply Sources
    
    Sec.
    1851.101  Policy.
    1851.102  Authorization to use Government supply sources.
    1851.102-70  Contractor acquisition of filing cabinets.
    
        Authority: 42 U.S.C. 2473(c)(1).
    
    Subpart 1851.1--Contractor Use of Government Supply Sources
    
    
    1851.101  Policy.
    
        Use of official Government mailing privileges by NASA contractors 
    is covered in NMI 1450.11, NASA Mail Management Program.
    
    
    1851.102  Authorization to use Government supply sources. (NASA 
    supplements paragraph (e)).
    
        (e) The contracting officer shall use substantially the following 
    format for letters authorizing contractor use of Government supply 
    sources:
    
    SUBJECT: Authorization to Lease, Rent, or Purchase from General 
    Services Administration (GSA) Supply Sources
    (Contractor's name)----------------------------------------------------
    (Address)--------------------------------------------------------------
    
        (1) You are hereby authorized to act for the Government in the 
    following matters:
        (i) The acquisition of supplies and/or services under Contract 
    No. ________ available for purchase by Government agencies either 
    directly from GSA stock or under Federal Supply Schedules, including 
    GSA nonmandatory ADTS/ADP schedule contracts and GSA ADP 
    requirements contracts, subject to the limitations set forth in this 
    authorization.
        (ii) The leasing or rental of equipment for use on Contract No. 
    ________ available for lease or rental by Government agencies under 
    Federal Supply Schedules, including GSA nonmandatory ADTS/ADP 
    schedule contracts and GSA ADP requirements contracts, subject to 
    the limitations set forth in this authorization.
        (iii) The issuance of tax exemption certificates in lieu of the 
    payment of State or other taxes for which the government is not 
    liable on supplies or services purchased under this authorization.
        (2)(i) Purchase orders under GSA schedules and contracts shall 
    be placed in accordance with the terms and conditions of the GSA 
    schedule or contract and this authorization. A copy of this 
    authorization shall be attached to the order (unless a copy was 
    previously furnished to the GSA contractor) and shall contain the 
    following statement:
        ``This order is placed on behalf of the National Aeronautics and 
    Space Administration in furtherance of United States Government 
    Contract No. ________, pursuant to written authorization dated 
    ________, a copy of which (is attached) (you have on file). In the 
    event of any inconsistency between the terms and conditions of this 
    order and those of the applicable GSA schedule/contract, the latter 
    will govern.''
        (ii) Orders for items in the GSA Supply Catalog shall be placed 
    in accordance with the Catalog and this authorization and shall 
    include the address to which billings are to be sent. Bills are not 
    issued by GSA until after shipment has been made and should 
    therefore be paid promptly. Any necessary adjustments will be made 
    by GSA subsequent to payment. All orders shall contain the following 
    statement:
        ``This order is placed on behalf of the National Aeronautics and 
    Space Administration in furtherance of United States Government 
    Contract No. ________, pursuant to written authorization dated 
    ________, a copy of which (is attached) (you have on file).''
        (3) (Insert any other provisions and restrictions.)
        (4) The authority hereby granted is not transferable or 
    assignable.
    
    ----------------------------------------------------------------------
    (Contracting Officer)
    
        (e)(3) Contracting officers shall use NHB 4100.1, NASA Materials 
    Inventory Management Manual, to obtain activity address codes to enable 
    use of FEDSTRIP and MILSTRIP.
    
    
    1851.102-70  Contractor acquisition of filing cabinets.
    
        (a) The Contractor officer must approve any planned contractor 
    acquisition of filing cabinets whose title will vest in the Government. 
    The contracting officer shall ensure that the contractor takes the 
    following actions before submitting a request for approval:
        (1) Transfer inactive records to contractor storage areas;
        (2) Dispose of unnecessary records in accordance with corporate 
    procedures;
        (3) Use less expensive shelf filing methods; and
        (4) Take other actions to reduce the need for filing cabinets.
        (b) If after taking the actions in paragraphs (a)(1) through (4) of 
    this section, the contractor requires additional filing capacity, it 
    shall submit for contracting officer approval a request to order filing 
    cabinets. This request shall include a discussion of why sufficient 
    additional filing capacity is necessary and shall address the results 
    of the actions in paragraphs (a)(1) through (4) of this section. The 
    contracting officer shall review the request in consultation with the 
    Records Management Officer, the Property and Supply Officer, and the 
    project officer, is appropriate.
        (c) If the need for filing cabinets is approved, the contracting 
    officer shall
    
    [[Page 14033]]
    
    attempt to fill the need by providing any available excess items of the 
    type required through appropriate property accountability channels. 
    Approved requests that cannot be filled from excess shall be returned 
    to the contractor with an authorization to obtain file cabinets, 
    preferably through GSA.
    
    PART 1852--SOLICITATION PROVISIONS AND CONTRACT CLAUSES
    
    
    1852.211-72, 1852.211-74  [Removed]
    
        20-21. Sections 1852.211-72 and 1852.211-74 are removed.
    
    
    1852.223-70  [Amended]
    
        22. In the clause to section 1852.223-70, the date ``(FEB 1996)'' 
    is revised to read ``(MAR 1997)'', and in paragraph (g)(2) of the 
    clause the phrase ``A certification program'' is revised to read 
    ``Qualification standards''.
    
    
    1852.223-73  [Amended]
    
        23. In the introductory text to section 1852.223-73, the citation 
    ``1823.7001'' is revised to read ``1823.7001(c)'', and in the 
    introductory text to ALTERNATE I of section 1852.223-73, the citation 
    ``1823-7001'' is revised to read ``1823.7001(d)''.
    
    
    1852.243-70, 1852.243-71  [Amended]
    
        24. Sections 1852.243-70 and 1852.243-71 are revised to read as 
    follows:
    
    
    1852.243-70  Engineering change proposals.
    
        As prescribed in 1843.205-70(a), insert the following clause, 
    modified to suit contract type:
    
    ENGINEERING CHANGE PROPOSALS (MAR 1997)
    
        (a) Definitions.
        ECP means an Engineering Change Proposal (ECP) which is a 
    proposed engineering change and the documentation by which the 
    change is described, justified, and submitted to the procuring 
    activity for approval or disapproval.
        MIL-STD-973 means a DOD publication entitled, Military Standard 
    Configuration Control--Egnineering Changes, Deviations and Waivers, 
    15 July 1988.
        (b) Either party to the contract may originate ECPs. The 
    originator shall forward proposed ECPs to the Contracting Officer. 
    Unless another process has been approved by the Government or 
    specified by the Contracting Officer, the ECP formats, forms and 
    controls specified in MIL-STD-973 shall be used. Implementation of 
    an approved ECP may occur by either a supplemental agreement or, if 
    appropriate, as a written change order to the contract.
        (c) Any ECP submitted to the Contracting Officer shall include a 
    ``not-to-exceed'' ______ [price or estimated cost] increase or 
    decrease adjustment amount, if any, and the required [time of 
    delivery or period of performance] adjustment, if any, acceptable to 
    the originator of the ECP. If the change is originated within the 
    Government, the Contracting Officer shall obtain a written agreement 
    with the Contractor regarding the ``not-to-exceed'' ______ [price or 
    estimated cost] and [delivery or period of performance] adjustments, 
    if any, prior to issuing an order for implementation of the change.
        (d) After submission of a Contractor initiated ECP, the 
    Contracting Officer may require the Contractor to submit the 
    following information:
        (1) Cost or pricing data in accordance with FAR 15.804-6 if the 
    proposed change meets the criteria for its submission under FAR 
    15.804-2; or
        (2) Information other than cost or pricing data adequate for 
    Contracting Officer determination of price reasonableness or cost 
    realism. The Contracting Officer reserves the right to request 
    additional information if that provided by the Contractor is 
    considered inadequate for that purpose. If the Contractor claims 
    applicability of one of the exceptions to submission of cost or 
    pricing data, it shall cite the exception and provide rationale for 
    its applicability.
        (e) If the ECP is initiated by NASA, the Contracting Officer 
    shall specify the cost information requirements, if any.
    
    (End of clause)
    
    ALTERNATE I (SEPT 1990)
    
        As prescribed in 1843.205-70(b), add the following paragraph 
    (e), modified to suit contract type, to the basic clause:
        (e) If the ______ [price of estimated cost] adjustment proposed 
    for any Contractor-originated ECP is ______ [Insert a percent or 
    dollar amount of the contract price or estimated cost.] or less, the 
    ECP shall be executed with no adjustment to the contract ______ 
    [price or estimated cost].
    
    ALTERNATE II (SEPT 1990)
    
        As prescribed in 1843.205-70(c), add the following sentence at 
    the end of paragraph (c) of the basic clause:
        An ECP accepted in accordance with the Changes clause of this 
    contract shall not be considered an authorization to the Contractor 
    to exceed the estimated cost in the contract Schedule, unless the 
    estimated cost is increased by the change order or other contract 
    modification.
    
    
    1852.243-71  Shared savings.
    
        As prescribed in 1843.7102, insert the following clause:
    
    SHARED SAVINGS (MAR 1997)
    
        (a) The Contractor is entitled, under the provisions of this 
    clause, to share in cost savings resulting from the implementation 
    of cost reduction projects which are presented to the Government in 
    the form of Cost Reduction Proposals (CRP) and approved by the 
    Contracting Officer. These cost reduction projects may require 
    changes to the terms, conditions or statement of work of this 
    contract. Any cost reduction projects must not change the essential 
    function of any products to be delivered or the essential purpose of 
    services to be provided under the contract.
        (b) Definitions:
        (1) Cost savings, as contemplated by this clause mean savings 
    that result from instituting changes to the covered contract, as 
    identified in an approved Cost Reduction Proposal.
        (2) Cost Reduction Proposal--For the purposes of this clause, a 
    Cost Reduction Proposal means a proposal that recommends 
    alternatives to the established procedures and/or organizational 
    support of a contract or group of contracts. These alternatives must 
    result in a net reduction of contract cost and price to NASA. The 
    proposal will include technical and cost information sufficient to 
    enable the Contracting Officer to evaluate the CRP and approve or 
    disapprove it.
        (3) Covered contract--As used in this provision, covered 
    contract means the contract, including unexercised options but 
    excluding future contracts, whether contemplated or not, against 
    which the CRP is submitted.
        (4) Contractor implementation costs--As used in this provision, 
    Contractor implementation costs, or ``implementation costs'', shall 
    mean those costs which the Contractor incurs on covered contracts 
    specifically in developing, preparing, submitting, and negotiating a 
    CRP, as well as those costs the Contractor will incur on covered 
    contracts to make any structural or organizational changes in order 
    to implement an approved CRP.
        (5) Government costs--As used in this provision, the term 
    Government costs means internal costs of NASA, or any other 
    Government agency, which result directly from development and 
    implementation of the CRP. These may include, but are not limited 
    to, costs associated with the administration of the contract or with 
    such contractually related functions such as testing, operations, 
    maintenance and logistics support. These costs also include costs 
    associated with other Agency contracts (including changes in 
    contract price or cost and fee) that may be affected as a result of 
    the implementation of a CRP. They do not include the normal 
    administrative costs of reviewing and processing the Cost Reduction 
    Proposal.
        (c) General. The Contractor will develop, prepare and submit 
    CRP's with supporting information as detailed in paragraph (e) of 
    this clause, to the Contracting Officer. The CRP will describe the 
    proposed cost reduction activity in sufficient detail to enable the 
    Contracting Officer to evaluate it and to approve or disapprove it. 
    The Contractor shall share in any net cost savings realized from 
    approved and implemented CRPs in accordance with the terms of this 
    clause. The Contractor's actual percentage share of the cost savings 
    shall be a matter for negotiation with the Contracting Officer, but 
    shall not, in any event, exceed 50 percent of the total cost savings 
    recognized by the Contracting Officer. The Contractor may propose 
    changes in other activities that impact performance on its contract, 
    including Government and other Contractor operations, if such 
    changes will optimize cost savings. A Contractor shall not be 
    entitled to share, however, in any cost savings that are
    
    [[Page 14034]]
    
    internal to the Government, or which result from changes made to any 
    contracts to which it is not a party even if those changes were 
    proposed as a part of its CRP. Early communication between the 
    Contractor and Government is encouraged. The communication may be in 
    the form of a concept paper or preliminary proposal. The Government 
    is not committed to accepting any proposal as a result of these 
    early discussions.
        (d) Computation of cost savings. The cost savings to be shared 
    between the Government and the Contractor will be computed by the 
    Contracting Officer by comparing a current estimate to complete 
    (ETC) for the covered contract, as structured before implementation 
    of the proposed CRP, to a revised ETC which takes into account the 
    implementation of that CRP. The cost savings to be shared shall be 
    reduced by any cost overrun, whether experienced or projected, that 
    is identified on the covered contract before implementation of the 
    CRP. Although a CRP may result in cost savings that extend far into 
    the future, the period in which the Contractor may share in those 
    savings will be limited to no more than five years. Implementation 
    costs of the Contractor must be considered and specifically 
    identified in the revised ETC. The Contracting Officer shall offset 
    Contractor cost savings by any increased costs (whether implementing 
    or recurring) to the Government when computing the total cost 
    savings to be shared. The Contractor shall not be entitled, under 
    the provisions of this clause, to share in any cost reductions to 
    the contract that are the result of changes stemming from any action 
    other than an approved CRP. However, this clause does not limit 
    recovery of any such reimbursements that are allowed as a result of 
    other contract provisions.
        (e) Supporting Information. As a minimum, the Contractor shall 
    provide the following supporting information with each CRP:
        (1) Identification of the current contract requirements or 
    established procedures and/or organizational support which are 
    proposed to be changed.
        (2) A description of the difference between the current process 
    or procedure and the proposed change. This description shall address 
    how proposed changes will meet NASA requirements and discuss the 
    advantages and disadvantages of the existing practice and the 
    proposed changes.
        (3) A list of contract requirements which must be revised, if 
    any, if the CRP is approved, along with proposed revisions. Any 
    changes to NASA or delegated contract management processes should 
    also be addressed.
        (4) Detailed cost estimates which reflect the implementation 
    costs of the CRP.
        (5) An updated ETC for the covered contract, unchanged, and a 
    revised ETC for the covered contract which reflects changes 
    resulting from implementing the CRP. If the CRP proposes changes to 
    only a limited number of elements of the contract, the ETCs need 
    only address those portions of the contract that have been impacted. 
    Each ETC shall depict the level of costs incurred or to be incurred 
    by year, or to the level of detail required by the Contracting 
    Officer. If other CRPs have been proposed or approved on a contract, 
    the impact of these CRPs must be addressed in the computation of the 
    cost savings to ensure that the cost savings identified are 
    attributable only to the CRP under consideration in the instant 
    case.
        (6) Identification of any other previous submissions of the CRP, 
    including the dates submitted, the agencies and contracts involved, 
    and the disposition of those submittals.
        (f) Administration.
        (1) The Contractor shall submit proposed CRPs to the Contracting 
    Officer who shall be responsible for the review, evaluation and 
    approval. Normally, CRP's should not be entertained for the first 
    year of performance to allow the Contracting Officer to assess 
    performance against the basic requirements. If a cost reduction 
    project impacts more than a single contract, the Contractor may, 
    upon concurrence of the Contracting Officers responsible for the 
    affected contracts, submit a single CRP which addresses fully the 
    cost savings projected on all affected contracts that contain this 
    Shared Savings Clause. In the case of multiple contracts affected, 
    responsibility for the review and approval of the CRP will be a 
    matter to be decided by the affected Contracting Officers.
        (2) Within 60 days of receipt, the Contracting Officer shall 
    complete an initial evaluation of any proposed cost reduction plan 
    to determine its feasibility. Failure of the Contracting Officer to 
    provide a response within 60 days shall not be construed as approval 
    of the CRP. The Government shall promptly notify the Contractor of 
    the results of its initial evaluation and indicate what, if any, 
    further action will be taken. If the Government determines that the 
    proposed CRP has merit, it will open discussions with the Contractor 
    to establish the cost savings to be recognized, the Contractor's 
    share of the cost savings, and a payment schedule. The Contractor 
    shall continue to perform in accordance with the terms and 
    conditions of the existing contract until a contract modification is 
    executed by the Contracting Officer. The modification shall 
    constitute approval of the CRP and shall incorporate the changes 
    identified by the CRP, adjust the contract cost and/or price, 
    establish the Contractor's share of cost savings, and incorporate 
    the agreed to payment schedule.
        (3) The Contractor will receive payment by submitting invoices 
    to the Contracting Officer for approval. The amount and timing of 
    individual payments will be made in accordance with the schedule to 
    be established with the Contracting Officer. Notwithstanding the 
    overall savings recognized by the Contracting Officer as a result of 
    an approved CRP, payment of any portion of the Contractor's share of 
    savings shall not be made until NASA begins to realize a net cost 
    savings on the contract (i.e., implementation, startup and other 
    increased costs resulting from the change have been offset by 
    cumulative cost savings). Savings associated with unexercised 
    options will not be paid unless and until the contract options are 
    exercised. It shall be the responsibility of the Contractor to 
    provide such justification as the Contracting Officer deems 
    necessary to substantiate that cost savings are being achieved.
        (4) Any future activity, including a merger or acquisition 
    undertaken by the Contractor (or to which the Contractor becomes an 
    involved party), which has the effect of reducing or reversing the 
    cost savings realized from an approved CRP for which the Contractor 
    has received payment may be cause for recomputing the net cost 
    savings associated with any approved CRP. The Government reserves 
    the right to make an adjustment to the Contractor's share of cost 
    savings and to receive a refund of moneys paid if necessary. Such 
    adjustment shall not be made without notifying the Contractor in 
    advance of the intended action and affording the Contractor an 
    opportunity for discussion.
        (g) Limitations. Contract requirements that are imposed by 
    statute shall not be targeted for cost reduction exercises. The 
    Contractor is precluded from receiving reimbursements under both 
    this clause and other incentive provisions of the contract, if any, 
    for the same cost reductions.
        (h) Disapproval of, or failure to approve, any proposed cost 
    reduction proposal shall not be considered a dispute subject to 
    remedies under the Disputes clause.
        (i) Cost savings paid to the Contractor in accordance with the 
    provisions of this clause do not constitute profit or fee within the 
    limitations imposed by 10 U.S.C. 2306(d) and 41 U.S.C. 254(b).
    
    (End of clause)
    
    
    1852.244-70  [Amended]
    
        25. In the introductory text to section 1852.244-70, the citation 
    ``1844.170'' is revised to read ``1844.204-70''.
    
    
    1852.246-70  [Amended]
    
        26. Section 1852.246-70 is revised to read as follows:
    
    
    1852.246-70  Mission Critical Space System Personnel Reliability 
    Program.
    
        As prescribed in 1846.370(a), insert the following clause:
    
    MISSION CRITICAL SPACE SYSTEM
    
    PERSONNEL RELIABILITY PROGRAM (MAR 1997)
    
        (a) In implementation of the Mission Critical Space System 
    Personnel Reliability Program, described in 14 CFR 1214.5, the 
    Government shall identify personnel
    
    [[Page 14035]]
    
    positions that are mission critical. Some of the positions as 
    identified may now or in the future be held by employees of the 
    Contractor. Upon notification by the Contracting Officer that a 
    mission-critical position is being or will be filled by one or more 
    of the Contractor's employees, the Contractor shall (1) provide the 
    affected employees with a clear understanding of the investigative 
    and medical requirements and, (2) to the extent permitted by 
    applicable law, assist the Government by furnishing personal data 
    and medical records.
        (b) The standard that will be used in certifying individuals for 
    a mission-critical position is that they must be determined to be 
    suitable, competent, and reliable in the performance of their 
    assigned duties in accordance with the screening requirements 14 CFR 
    1214.5. If the Government determines that a Contractor employee 
    occupying or nominated to occupy a mission-critical position will 
    not be certified for such duty, the Contracting Officer shall (1) 
    furnish to the employee the specific reasons for its action; (2) 
    advise the employee that he/she may avail himself/herself of the 
    review procedures that are a part of the certification system; and 
    (3) furnish him/her a copy of those procedures upon request.
        (c) If a Contractor employee who has been nominated for (but has 
    not yet filled) a mission-critical position is not certified, the 
    Contractor agrees to defer the appointment to the position until the 
    employee has had an opportunity to pursue the referenced procedures. 
    If the employee is an incumbent to the position, the Contractor 
    agrees, upon the request of the Government, to remove him/her from 
    the position temporarily pending an appeal of the action under the 
    review procedures. If any employee not certified elects not to take 
    action under the procedures, or, if having taken action, is not 
    successful in obtaining a reversal of the determination, the 
    Contractor agrees not to appoint the employee to the position, or if 
    already appointed, to promptly remove the employee.
    
    (End of clause)
    
    
    1852.246-71  [Amended]
    
        27. In the introductory text to section 1852.246-71, the citation 
    ``1846.470-2(a)'' is revised to read ``1846.470''.
    
    
    1852.246-73  [Amended]
    
        28. Section 1852.246-73 is revised to read as follows:
    
    
    1652.246-73  Human Space Flight Item.
    
        As prescribed in 1845.370(b), insert the following clause:
    
    HUMAN SPACE FLIGHT ITEM (MAR 1997)
    
        The Contractor shall include the following statement in all 
    subcontracts and purchase orders placed by it in support of this 
    contract, without exception as to amount or subcontract level:
        ``FOR USE IN HUMAN SPACE FLIGHT; MATERIALS, MANUFACTURING, AND 
    WORKMANSHIP OF HIGHEST QUALITY STANDARDS ARE ESSENTIAL TO ASTRONAUT 
    SAFETY.
        IF YOU ARE ABLE TO SUPPLY THE DESIRED ITEM WITH A HIGHER QUALITY 
    THAN THAT OF THE ITEMS SPECIFIED OR PROPOSED, YOU ARE REQUESTED TO 
    BRING THIS FACT TO THE IMMEDIATE ATTENTION OF THE PURCHASER.''
    
    (End of clause)
    
    
    1852.246-74, 1852.246-75  [Removed]
    
        29. Section 1852.246-74 and 1852.246-75 are removed.
    
    
    1852.247-70  [Removed]
    
        30. Section 1852.247-70 is removed.
    
    
    1852.247-72  [Amended]
    
        31. In the introductory text to section 1852.247-72, the citation 
    ``1847.305-70(b)'' is revised to read ``1847.305-70(a)''.
    
    
    1852.247-73  [Amended]
    
        32. In the introductory text to section 1852.247-73, the citation 
    ``1847.305-70(c)'' is revised to read ``1847.305-70(b)''.
        33. In the clause to section 1852.247-73, the date ``(MARCH 1989)'' 
    is revised to read ``(MAR 1997)'', and in paragraph (b), the word 
    ``certificate'' is revised to read ``statement''.
    
    [FR Doc. 97-7075 Filed 3-24-97; 8:45 am]
    BILLING CODE 7510-01-M
    
    
    

Document Information

Effective Date:
3/25/1997
Published:
03/25/1997
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
97-7075
Dates:
March 25, 1997.
Pages:
14016-14035 (20 pages)
PDF File:
97-7075.pdf
CFR: (91)
48 CFR 46.709)
14 CFR 1851.101
14 CFR 1851.102
48 CFR 1843.205
48 CFR 1843.7001
More ...