2024-18635. Airworthiness Directives; Gulfstream Aerospace Corporation Airplanes  

  • Estimated Costs

    Action Labor cost Parts cost Cost per product Cost on U.S. operators
    Inspecting and disabling grounding receptacles 64 work-hours × $85 per hour = $5,440 $83 $5,523 $1,303,428

    The FAA estimates the following costs to do any necessary corrective actions that would be required based on the results of the proposed inspections. The agency has no way of determining the number of aircraft that might need these actions:

    On-Condition Costs

    Action Labor cost Parts cost Cost per product
    Repair 12 work-hours × $85 per hour = $1,020 $83 $1,103
    Replacement 35 work-hours × $85 per hour = $2,975 926 3,901

Document Information

Published:
08/22/2024
Department:
Federal Aviation Administration
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
2024-18635
Dates:
The FAA must receive comments on this proposed AD by October 7, 2024.
Pages:
67913-67915 (3 pages)
Docket Numbers:
Docket No. FAA-2024-2021, Project Identifier AD-2023-01077-T
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
2024-18635.pdf
CFR: (1)
14 CFR 39