99-26035. Automatic Train Control (ATC) and Advanced Civil Speed Enforcement System (ACSES); Northeast Corridor (NEC) Railroads  

  • [Federal Register Volume 64, Number 193 (Wednesday, October 6, 1999)]
    [Notices]
    [Page 54410]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-26035]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Railroad Administration
    [FRA Docket No. 87-2, Notice. No. 8]
    RIN 2130-AB20
    
    
    Automatic Train Control (ATC) and Advanced Civil Speed 
    Enforcement System (ACSES); Northeast Corridor (NEC) Railroads
    
    AGENCY: Federal Railroad Administration (FRA), Department of 
    Transportation (DOT).
    
    ACTION: Informational Notice--ACSES Requirements between New Haven, 
    Connecticut and Boston, Massachusetts Postponed to March 21, 2000
    
    -----------------------------------------------------------------------
    
    SUMMARY: FRA postpones from October 1, 1999 to March 21, 2000, the date 
    on which all trains operating on the Northeast Corridor between New 
    Haven, Connecticut and Boston, Massachusetts (NEC--North End) must be 
    equipped to respond to the new ACSES system.
    
    DATES: This Informational Notice is relevant to the compliance 
    responsibilities of affected Railroads as of October 1, 1999.
    
    FOR FURTHER INFORMATION CONTACT:
        W.E. Goodman, Staff Director, Signal and Train Control Division, 
    Office of Safety, Mail Stop 25, FRA, 400 Seventh Street, SW, 
    Washington, DC 20590 ((202) 493-6325), Paul Weber, Railroad Safety 
    Specialist, Signal and Train Control Division, Office of Safety, Mail 
    Stop 25, FRA, 400 Seventh Street, SW, Washington, DC 20590 ((202) 493-
    6268), or Patricia V. Sun, Office of Chief Counsel, Mail Stop 10, FRA, 
    400 Seventh Street, SW, Washington, DC 20590 ((202) 493-6060).
    
    SUPPLEMENTARY INFORMATION: On July 22, 1998, FRA published an Order of 
    Particular Applicability (Order) (63 FR 39343), which set performance 
    standards for cab signal/automatic train control and ACSES systems, 
    increased certain maximum authorized train speeds, and contained safety 
    requirements supporting improved rail service on the NEC. Among other 
    requirements, the Order required all trains operating on track 
    controlled by the National Railroad Passenger Corporation (Amtrak) on 
    the NEC--North End to be controlled by locomotives equipped to respond 
    to ACSES by October 1, 1999.
        Although Amtrak has continued work on a major improvement project 
    between New Haven and Boston to facilitate train service at speeds up 
    to 150 miles per hour, and has taken delivery of prototype high-speed 
    trains expected to qualify for operation through curves at higher 
    levels of unbalance and at higher speeds than conventional trains, 
    FRA's acceptance of Amtrak's final program and timetable, and of the 
    results of pre-qualification and pre-service tests, will not occur by 
    the Order's original compliance date of October 1, 1999.
        Based on information from Amtrak, FRA is setting a new date for 
    compliance with the Order. Trains operating on the NEC--North End will 
    be required to respond to ACSES on and after March 21, 2000. FRA 
    appreciates the cooperation of all parties on implementation of this 
    important safety system and will publish further notice when all 
    required approvals have been completed.
    
        Issued in Washington, D.C. on September 30, 1999.
    Jolene M. Molitoris,
    Administrator.
    [FR Doc. 99-26035 Filed 10-5-99; 8:45 am]
    BILLING CODE 4910-06-P
    
    
    

Document Information

Published:
10/06/1999
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Informational Notice--ACSES Requirements between New Haven, Connecticut and Boston, Massachusetts Postponed to March 21, 2000
Document Number:
99-26035
Dates:
This Informational Notice is relevant to the compliance responsibilities of affected Railroads as of October 1, 1999.
Pages:
54410-54410 (1 pages)
Docket Numbers:
FRA Docket No. 87-2, Notice. No. 8
RINs:
2130-AB20: Advanced Civil Speed Enforcement System; Northeast Corridor Railroads
RIN Links:
https://www.federalregister.gov/regulations/2130-AB20/advanced-civil-speed-enforcement-system-northeast-corridor-railroads
PDF File:
99-26035.pdf