    Entergy Operations, Inc. (Arkansas Nuclear One, Unit 2); 
    Exemption
    
    [Docket No. 50-368]
        Entergy Operations, Inc. (the licensee), is the holder of Facility 
    Operating License No. NPF-6, which authorizes operation of Arkansas 
    Nuclear One, Unit 2. The license provides, among other things, that the 
    licensee is subject to all rules, regulations, and orders of the 
    Commission now or hereafter in effect.
        The facility is one of two pressurized-water reactors at the 
    licensee's site located in Pope County, Arkansas.
    
    II
    
        In its letter dated October 8, 1997, as supplemented by letter 
    dated February 25, 1999, the licensee requested an exemption from the 
    Commission's regulations. Title 10 of the Code of Federal Regulations 
    (10 CFR), Part 50, Appendix R, Section III.G.2, is designed to ensure 
    that adequate fire protection features are provided for redundant 
    cables or equipment located in the same fire area outside of primary 
    containment such that at least one of the redundant trains of safe 
    shutdown equipment will remain available during and after any 
    postulated fire in the plant to achieve and maintain safe shutdown 
    conditions. Section III.G.2.c requires the following means of 
    assurance:
    
        Enclosure of cable and equipment and associated non-safety 
    circuits of one redundant train in a fire barrier having a 
    1-hour fire rating. In addition, fire detectors and an automatic 
    fire suppression system shall be installed in the fire area[.]
    
        The licensee has requested an exemption from the requirements of 10 
    CFR Part 50, Appendix R, Section III.G.2.c, for cables and equipment 
    located below the 354-foot elevation of the ANO-2 intake structure. The 
    licensee is requesting an exemption from the specific requirement to 
    provide fire detectors and an automatic fire suppression system to 
    protect redundant trains of safe shutdown equipment that are located in 
    the same fire zone. The licensee has demonstrated that one redundant 
    train of cable and equipment, required to achieve and maintain safe 
    shutdown conditions, is protected with a fire barrier having an 
    equivalent 1-hour fire rating.
    
    III
    
        Pursuant to 10 CFR 50.12, the Commission may, upon application by 
    any interested person or upon its own initiative, grant exemptions from 
    the requirements of 10 CFR Part 50 (1) when the exemptions are 
    authorized by law, will not present an undue risk to public health or 
    safety, and are consistent with the common defense and security; and 
    (2) when special circumstances are present. Special circumstances are 
    present whenever, according to 10 CFR 50.12(a)(2)(ii), ``Application of 
    the regulation in the particular circumstances would not serve the 
    underlying purpose of the rule or is not necessary to achieve the 
    underlying purpose of the rule * * *''
        The underlying purpose of 10 CFR Part 50, Appendix R, Section 
    III.G.2, is to provide reasonable assurance that at least one of the 
    redundant trains of safe shutdown equipment will remain available 
    during and after any postulated fire in the plant to achieve and 
    maintain safe shutdown conditions.
        The ANO-2 intake structure is about 32 feet by 26 feet on three 
    levels. There are no rated fire barriers between the three levels. 
    Below the 354-foot elevation there are three intake bays, which contain 
    service water (SW) piping and conduits. The bays are approximately 7 
    feet by 32 feet and are separated from one another by 2-foot thick, 
    non-rated concrete walls. The bays are separated from the ground level 
    by an 18-inch thick, non-rated concrete slab on metal decking. The 
    floor of the bays is typically covered with water 16 feet deep. The 
    ceiling height is approximately 14 feet above the normal pool level. Of 
    the three bays, only the ``A'' SW intake bay contains redundant cables. 
    The licensee stated that the total in-situ combustible loading is 
    3,469,060 BTUs, which is equivalent to a fire severity to a standard 
    fire duration of less than 4 minutes. Each bay is administratively 
    controlled as a ``confined space,'' thus limiting access by personnel 
    during routine operations and precluding the accumulation of 
    combustibles. In addition, the licensee's administrative procedures 
    limit the transient combustibles to 5 pounds unless personnel are 
    continuously present in the area. In such cases, the personnel could be 
    either the craft personnel responsible for using the combustible 
    materials or a continuous fire watch. Water to the bay is normally 
    provided through a sluice gate for the bays where the circulating pumps 
    take suction.
        SW is required to be available to supply cooling water for various 
    safe shutdown components including the diesel generators and the 
    shutdown cooling heat exchangers. Additionally, SW can be aligned to 
    the emergency feedwater system in the event that the desired condensate 
    source is depleted. The time critical function is to supply cooling for 
    the diesel generators. The licensee stated that, on the basis of its 
    calculations, the diesel generators (and therefore the SW system 
    components) are not required to be operated during the first 30 minutes 
    of a postulated fire event. The licensee allows the operators to 
    manually align the SW system because the diesel generators are not 
    required during the first 30 minutes of a fire event and sufficient 
    time is available to complete the alignment.
    
    [[Page 54652]]
    
        The SW system consists of two independent seismic category 1 flow 
    paths, which furnish cooling water to two independent trains of 100 
    percent capacity engineered safety feature equipment, and two 
    nonseismic category 1 flow paths. The SW system has three 100 percent 
    capacity pumps. One pump is dedicated to each of the two SW trains 
    while the third pump is designated as a swing pump and can be aligned 
    to either train. The two loops of the SW system are also electrically 
    independent with two separate divisions of electrical power designated 
    as the red and green train. The red train power for SW is aligned to 
    either SW pump 2P4A or SW pump 2P4B, while the green train power is 
    aligned to either SW pump 2P4C or SW pump 2P4B.
        The four power cables associated with the 2P4A, 2P4B, and 2P4C SW 
    pumps interface with the ``A'' SW intake bay. During plant operations 
    (Modes 1 through 5), the ANO-2 technical specification requires that 
    two SW trains be operable. The possible SW pump alignments are SW pumps 
    2P4A and 2P4B, SW pumps 2P4A and 2P4C, or SW pumps 2P4C and 2P4B. The 
    power cable arrangements are as follows: conduit EA 1007 contains the 
    red train power supply cable to SW pump 2P4A; conduit EA2036 contains 
    the green train power supply cable to swing SW pump 2P4B; and conduit 
    EA2007 contains the green train power supply cable for SW pump 2P4C. 
    Conduits EA1007 and EA2036 are protected by separate 1-hour fire-rated 
    Hemyc fire barriers. Below the 354-foot elevation, these conduits are 
    also encapsulated in a common galvanized sheet metal moisture barrier. 
    Conduit EA2007, which is located about 6 feet from the moisture barrier 
    containing conduits EA1007 and EA2036, is covered by a Thermo-Lag 
    barrier. The licensee stated that it does not take credit for the 
    Thermo-Lag barrier to meet the requirements of Appendix R. Conduit 
    EA1008, which contains the red train power supply to swing SW pump 
    2P4B, is embedded in the concrete slab at the elevation of 354 feet and 
    does not enter the bay. Therefore, based on the preceding discussion, 
    this area would require the addition of fire detectors and an automatic 
    fire suppression system to comply with the requirements of 10 CFR Part 
    50, Appendix R, Section III.G.2.c.
        The ``A'' SW intake bay contains redundant cables required to 
    support post-fire safe shutdown. The licensee stated that the 2P4C/2P4B 
    SW pump combination with SW pump 2P4B aligned to the red train power is 
    the only pump alignment that would be utilized during normal operations 
    in Modes 1 through 5 with the ``A'' SW intake bay isolated and drained. 
    During the recovery from a fire, the time critical function is to 
    supply cooling water to the diesel generators. The licensee stated 
    that, on the basis of its calculations, the diesel generators (and 
    therefore the SW system components) are not required to be operated 
    during the first 30 minutes of a fire event. The licensee allows the 
    operators to manually align the SW system because sufficient time is 
    available to complete the alignment.
        Power and control cables for the sluice gates are also located in 
    the SW intake bays. Sluice gate valves 2CV1470-1, 2CV1472-5, and 
    2CV1474-2 are normally open, which corresponds to the safe shutdown 
    position. The redundant control cables are separated horizontally by 
    approximately 8 feet. As stated previously, the time critical function 
    of the SW system is to provide cooling to the diesel generators. The 
    licensee stated that if a fire were to cause the sluice gates to 
    spuriously close, adequate time would be available before the SW was 
    required to manually realign any affected component.
        The in-situ combustibles in ``A'' SW intake bay and the 
    administratively allowed quantity of transient combustibles (5 pounds) 
    do not pose a credible fire threat to the SW pump cables. In the 
    staff's view, a fire involving transient combustibles in excess of the 
    administratively allowed quantity is the only type of fire that could 
    damage redundant SW pump power cables. The licensee has addressed this 
    threat by protecting both the red train power supply cable for SW pump 
    2P4A and the green train power supply cable for swing SW pump 2P4B with 
    1-hour fire-rated barriers, by embedding the red train power supply 
    cable for SW swing pump 2P4B in concrete, and by administratively 
    requiring the presence of craft personnel or a fire watch, if the 
    administrative transient combustible limit is exceeded.
        A fire involving transient combustibles could be extinguished by 
    the craft personnel or the fire watch during its incipient stage. In 
    the event the fire grows beyond the incipient stage before it is 
    extinguished, the craft personnel or the fire watch could summon the 
    plant fire brigade. In addition, the smoke and hot gases would be 
    directed upwards into the higher elevations of the intake structure, 
    which are equipped with an automatic fire detection system. Therefore, 
    in the event that a fire in the intake bay is not discovered by the 
    craft personnel or the fire watch, it would be detected by the 
    automatic fire detection system and the plant fire brigade would be 
    dispatched. If the fire exposes the redundant conduits, the 1-hour 
    fire-rated barriers and the concrete embedding, with an equivalent 1-
    hour fire rating, would provide fire resistive protection, with margin, 
    for the expected fire hazards and, therefore, provide reasonable 
    assurance that the power cables would not be damaged before the fire 
    either burns itself out or is extinguished by the craft personnel, the 
    fire watch, or the fire brigade. On this basis, the staff concludes 
    that the existing fire protection design features, coupled with the 
    administrative controls, provide reasonable assurance that a fire in 
    the ``A'' SW intake bay would not damage the redundant SW pump power 
    cables and, therefore, would not adversely affect the ability to 
    achieve and maintain post-fire safe shutdown. The staff also concludes 
    that the installation of fire detectors and an automatic fire 
    suppression system in the area below the 354-foot elevation of the ANO-
    2 intake structure would not result in a significant increase in the 
    level of fire safety for the redundant SW pumps. Additional details 
    concerning the exemption are provided in the staff's Safety Evaluation 
    dated October 1, 1999.
        For the forgoing reasons, the NRC staff has determined that there 
    is a low probability of occurrence for a fire event in the ANO-2 intake 
    structure below the 354-foot elevation. This low probability of 
    occurrence combined with the lack of combustible material, 
    administrative controls, and the fire protection features provided, as 
    stated in the licensee's submittals, is sufficient to reasonably ensure 
    adequate protection for redundant equipment in the SW system, such that 
    there is reasonable assurance that at least one means of achieving and 
    maintaining safe shutdown conditions will remain available during and 
    after any postulated fire. Therefore, the addition of fire detectors 
    and an automatic fire suppression system is not necessary to achieve 
    the underlying purpose of Appendix R, Section III.G.2.c.
        The Commission has determined that, pursuant to 10 CFR 50.12, this 
    exemption is authorized by law, will not endanger life or property or 
    the common defense and security, and presents no undue risk to public 
    health and safety. In addition, the Commission has determined that the 
    special circumstances under 10 CFR 50.12(a)(2)(ii) are present. 
    Therefore, the Commission hereby grants Entergy Operations, Inc., an 
    exemption from the requirements of 10 CFR Part 50, Appendix R, Section 
    III.G.2.c, for the
    
    [[Page 54653]]
    
    area below the 354-foot elevation of the ANO-2 intake structure, such 
    that fire detectors and an automatic fire suppression system need not 
    be installed in the fire area.
        Pursuant to 10 CFR 51.32, the Commission has determined that the 
    granting of this exemption will have no significant impact on the 
    environment (64 FR 52804).
        This exemption is effective upon issuance.
    
        Dated at Rockville, Maryland, this 1st day of October 1999.
    
        For the Nuclear Regulatory Commission.
    John A. Zwolinski,
    Director, Division of Licensing Project Management, Office of Nuclear 
    Reactor Regulation.
    [FR Doc. 99-26143 Filed 10-6-99; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
10/07/1999
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
99-26143
Pages:
54651-54653 (3 pages)