95-28134. Consumers Power Company and the Detroit Edison Company; Notice of Availability of Final Environmental Assessment
[Federal Register Volume 60, Number 220 (Wednesday, November 15, 1995)]
[Notices]
[Page 57413]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-28134]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project No. 2680-017 Michigan]
Consumers Power Company and the Detroit Edison Company; Notice of
Availability of Final Environmental Assessment
November 8, 1995.
A final environmental assessment (FEA) is available for public
review. The FEA is for a settlement agreement containing proposed
measures for fish protection and angler access at the Ludington Pumped
Storage Project (FERC No. 2680). The FEA finds that approval of the
settlement agreement and implementation of the proposed measures for
fish protection and angler access would not constitute a major federal
action significantly affecting the quality of the human environment.
The Ludington Pumped Storage Project is located on the eastern shore of
Lake Michigan in Mason County, Michigan.
The FEA was prepared by staff in the Office of Hydropower
Licensing, Federal Energy Regulatory Commission. Copies of the FEA can
be viewed at the Commission's Reference and Information Center, Room 2-
A, 888 1st Street, N.E., Washington, D.C. 20426. Copies can also be
obtained by calling the project manager listed below. For more
information, please contact the project manager, John Mudre, at (202)
219-1208.
Lois D. Cashell,
Secretary.
[FR Doc. 95-28134 Filed 11-14-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/15/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-28134
- Pages:
- 57413-57413 (1 pages)
- Docket Numbers:
- Project No. 2680-017 Michigan
- PDF File:
-
95-28134.pdf