98-29232. MIGC, Inc.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 211 (Monday, November 2, 1998)]
    [Notices]
    [Page 58715]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29232]
    
    
    
    [[Page 58715]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-23-000]
    
    
    MIGC, Inc.; Notice of Request Under Blanket Authorization
    
    October 27, 1998.
        Take notice that on October 19, 1998, MIGC, Inc. (MIGC), 12200 
    North Pecos Street, Denver, Colorado 80234, filed in Docket No. CP99-
    23-000 a request pursuant to Sections 157.205 and 157.216 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.216) for authorization to abandon a dehydrator under MIGC's blanket 
    certificate issued in Docket No. CP82-409-000,\1\ pursuant to Section 7 
    of the Natural Gas Act, all as more fully set forth in the request that 
    is on file with the Commission and open to public inspection.
    ---------------------------------------------------------------------------
    
        \1\ See, 20 FERC para. 62,418 (1982).
    ---------------------------------------------------------------------------
    
        MIGC states that the abandonment of this dehydrator will not 
    adversely impact capacity on the MIGC system since a larger dehydration 
    unit has been installed at the same location to accommodate increased 
    deliveries into MIGC's system. MIGC will remove the dehydrator for use 
    at a new location on the MIGC system.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205) a 
    protest to the request. If no protest is filed within the time allowed 
    therefor, the proposed activity shall be deemed to be authorized 
    effective the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Linwood A. Watson, Jr.
    Acting Secretary.
    [FR Doc. 98-29232 Filed 10-30-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-29232
Pages:
58715-58715 (1 pages)
Docket Numbers:
Docket No. CP99-23-000
PDF File:
98-29232.pdf