DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-78-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
November 17, 1997.
Take notice that on November 12, 1997, NorAm Gas Transmission
Company (NGT), 525 Milam Street, P.O. Box 21734, Shreveport, Louisiana
71151, filed in Docket No. CP98-78-000 a request pursuant to Sections
157.205 and 157.211 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205 and 157.211) for approval to operate certain
facilities in Arkansas, under NGT's blanket certificate issued in
Docket Nos. CP82-384-000 and CP82-384-001, pursuant to Section 7(c) of
the Natural Gas Act (NGA), all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
NGT states that it specifically requests authority pursuant to
Subpart G of Part 284 of the Commission's Regulations to operate an
existing one-inch tap originally installed to provide service
authorized under Section 311 of the Natural Gas Policy Act and Subpart
B, Part 284 of the Commission's Regulations. NGT further states that
the one-inch tap, valve and first-cut regulator are located on NGT's
Line KT-9 in Section 35, Township 18 South, Range 16 West, Union
County, Arkansas: NGT asserts that the estimated volumes to be
delivered through the tap are approximately 170 MMBtu annually and 2
MMBtu on a peak day. NGT indicates that the tap was constructed in
July, 1997, at an estimated cost of $2,544.
Any person or the Commission's Staff may, within 45 days of the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene and pursuant to Section 157.205 of the
regulations under the Natural Gas Act (18 CFR 157.205), a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activities shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.