97-30635. Florida Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 225 (Friday, November 21, 1997)]
[Notices]
[Pages 62296-62297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-30635]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Florida Gas Transmission Company; Notice of Request Under Blanket
Authorization
[Docket No. CP98-75-000]
November 17, 1997.
Take notice that on November 7, 1997, Florida Gas Transmission
Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
1188, filed in Docket No. CP98-075-000 a request pursuant to Sections
157.205 and 157.212 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205 and 157.212) for authorization to upgrade an
existing meter station in Lake County, Florida, under FGT's blanket
certificate issued in Docket No. CP82-553-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
The meter station is currently being used to deliver gas to TECO
Peoples Gas (TECO), and the upgrade is necessary to accommodate an
increase in hourly peak demands from 142 MMBtu to 272 MMBtu of natural
gas, as indicated by FGT. Specifically, FGT proposes to upgrade the
subject meter station by replacing the existing 4-inch meter bypass
spool with an 4-inch Ansi Class 150 Senior meter tube at an estimated
cost of $30,000 of which TECO would reimburse FGT. FGT states that the
proposed upgrade would not increase contractual deliveries to TECO
above the currently authorized levels of firm service.
Any person or the Commission's staff may, within 45 days after
issuance of
[[Page 62297]]
the instant notice by the Commission, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-30635 Filed 11-20-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/21/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-30635
- Pages:
- 62296-62297 (2 pages)
- PDF File:
-
97-30635.pdf