94-29321. Pawtucket Power Associates Ltd. Partnership, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 228 (Tuesday, November 29, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-29321]
    
    
    [[Page Unknown]]
    
    [Federal Register: November 29, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG95-7-000, et al.]
    
     
    
    Pawtucket Power Associates Ltd. Partnership, et al.; Electric 
    Rate and Corporate Regulation Filings
    
    November 16, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Pawtucket Power Associates Limited Partnership
    
    [Docket No. EG95-7-000]
    
        On November 1, 1994, Pawtucket Power Associates Limited Partnership 
    (``Pawtucket'') c/o Dennis J. Duffy, Esq., Partridge, Snow & Hahn, 180 
    South Main Street, Providence, Rhode Island 02903, filed with the 
    Federal Energy Regulatory Commission an application for determination 
    of exempt wholesale generator status pursuant to Part 365 of the 
    Commission's regulations.
        Pawtucket owns and operates an approximately 62 MW cogeneration 
    facility located in Pawtucket, Rhode Island. The Facility's electricity 
    is sold exclusively at wholesale.
        Comment date: December 8, 1994, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Amoco Trinidad Power Resources Corporation
    
    [Docket No. EG95-10-000]
    
        On November 8, 1994, Amoco Trinidad Power Resources Corporation, a 
    Delaware Corporation, 501 West Lake Park Boulevard, Houston, Texas, 
    77253-3092 (the ``Applicant''), filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator (``EWG'') status pursuant to Part 365 of the 
    Commission's regulations.
        The Applicant will be engaged indirectly, through an affiliate as 
    defined in section 2(a)(11)(B) of the Public Utility Holding Company 
    Act of 1935 (``PUHCA''), in owning and operating eligible facilities 
    located in Trinidad and Tobago: the 236 MW Penal Plant, located in the 
    ward in Siparia, County of St. Patrick, consisting of two simple cycle 
    gas turbines and a combined cycle generating unit comprised of two gas 
    turbines, one heat recovery steam generator, and one steam turbine; the 
    634 MW Point Lisas Plant, located at Point Lisas Industrial Estate in 
    the ward of Couva, County of Caroni, consisting of ten simple cycle 
    turbines; and the 308 MW Port of Spain Plant, located in the city of 
    Port of Spain, consisting of four steam turbine and two simple cycle 
    gas turbine generator units. The facilities are all in commercial 
    operation. The facilities are gas fired; the Port of Spain Plant also 
    has the capability to use fuel oil as a back-up.
        Comment date: December 7, 1994, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. Santa Maria Cogen, Inc.
    
    [Docket No. EG95-11-000]
    
        On November 7, 1994, Santa Maria Cogen, Inc., a California 
    Corporation (``Applicant''), with its principal executive office at 650 
    Bercut Drive, Suite C, Sacramento, California 95814, filed with the 
    Federal Energy Regulatory Commission an application for determination 
    of exempt wholesale generator status pursuant to Part 365 of the 
    Commission's regulations.
        Applicant will own and operate an approximately nine (9) megawatt 
    gas fired electrical generating facility located in Santa Maria, 
    California. The entire net energy output of such facility will be sold 
    by Applicant on a wholesale basis to Pacific Gas & Electric Company, 
    pursuant to a power purchase agreement between Applicant and such 
    utility.
        Comment date: December 7, 1994, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. West Penn Power Company
    
    [Docket No. EL94-96-000]
    
        Take notice that on September 29, 1994, West Penn Power Company 
    (West Penn) tendered for filing a letter requesting permission to 
    deviate from the requirements of Section 35.14 of 18 CFR in response to 
    the Commission's audit report of West Penn.
        Comment date: December 8, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Potomac Edison Company
    
    [Docket No. EL94-97-000]
    
        Take notice that on September 30, 1994, Potomac Edison Company 
    (Potomac) tendered for filing a letter requesting permission to deviate 
    from the requirements of Section 35.14 of 18 CFR in response to the 
    Commission's audit report of Potomac.
        Comment date: December 8, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Monongahela Power Company
    
    [Docket No. EL95-8-000]
    
        Take notice that on October 21, 1994, Monongahela Power Company 
    (Monongahela) tendered for filing a letter requesting permission to 
    deviate from the requirements of Section 35.14 of 18 CFR in response to 
    the Commission's audit report of Monongahela.
        Comment date: December 8, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Las Vegas Cogeneration Limited Partnership
    
    [Docket Nos. EL95-9-000 and QF89-251-003]
    
        On November 4, 1994, Las Vegas Cogeneration Limited Partnership 
    filed with the Federal Energy Regulatory Commission an application for 
    a temporary waiver for calendar year 1994 of the Commission's operating 
    and efficiency standards for qualifying cogeneration facilities. The 
    applicant is a topping-cycle cogeneration facility located in North Las 
    Vegas, Nevada.
        Comment date: December 14, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Western Systems Power Pool
    
    [Docket No. ER91-195-018]
    
        Take notice that on October 31, 1994, the Western Systems Power 
    Pool (WSPP) filed certain information as required by Ordering Paragraph 
    (D) of the Commission's June 27, 1991, Order (55 FERC 61,495) and 
    Ordering Paragraph (C) of the Commission's June 1, 1992, Order On 
    Rehearing Denying Request Not to Submit Information, And Granting In 
    Part And Denying In Part Privileged Treatment. Pursuant to 18 CFR 
    385.211, WSPP has requested privileged treatment for some of the 
    information filed consistent with the June 1, 1992 order. Copies of 
    WSPP's informational filing are on file with the Commission, and the 
    non-privileged portions are available for public inspection.
    
    9. Torco Energy Marketing, Inc.
    
    [Docket No. ER92-429-004]
    
        Take notice that on October 31, 1994, Torco Energy Marketing, Inc. 
    (Torco) filed an amendment to the informational filing filed on August 
    1, 1994, which contain information as required by the Commission's May 
    18, 1992, letter order in this proceeding. Copies of Torco's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    10. Florida Power Corporation
    
    [Docket No. ER94-1245-000]
    
        Take notice that on November 2, 1994, Florida Power Corporation 
    (Florida Power), in response to a request by Staff, tendered for filing 
    a Revised Third Amendment to the Agreement between Florida Power 
    Corporation and Seminole Electric Cooperative, Inc. for Supplemental 
    Resale Service, Transmission and Distribution Service, and Load 
    Following Service, together with additional documentation in support of 
    the filing. The Revised Third Amendment effects minor changes in 
    Paragraph 9(b) of the Third Amendment filed previously in this docket.
        Florida Power requests that the rate change be permitted to become 
    effective sixty days after its submission for filing.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Tucson Electric & Power Company
    
    [Docket No. ER94-1437-000]
    
        Take notice that on November 4, 1994, Tucson Electric & Power 
    Company tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Illinois Power Company
    
    [Docket Nos. ER94-1505-000; ER95-42-000; ER95-70-000; ER95-81-000]
    
        Take notice that on November 10, 1994, Illinois Power Company 
    (Illinois) tendered for filing amendments to the agreements between 
    Illinois, Louis Dreyfus Electric Power Inc., Electric Clearinghouse, 
    Inc., AES Power, Inc. and Enron Power Marketing, Inc. Illinois states 
    that the purpose of these amendments is to revise the charges when 
    Illinois is buying from a third party and selling to any of the above 
    parties.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Black Hills Corporation
    
    [Docket No. ER94-1542-000]
    
        Take notice that Black Hills Corporation, which operates its 
    electric utility business under the assumed name of Black Hills Power 
    and Light Company (Black Hills) on November 7, 1994, tendered for 
    filing an Amended Economy Power Sales tariff and executed service 
    agreements with Tri-State Generation and Transmission Association, 
    Inc., and Public Service Company of Colorado, Basin Electric Power 
    Cooperative, PacifiCorp, Montana Power Company, and Platte River Power 
    Authority.
        Copies of the filing were provided to, City of Gillete, Wyoming, 
    Western Area Power Administration (Loveland and Billings area), and the 
    regulatory commission of each of the states of Montana, South Dakota, 
    and Wyoming.
        Black Hills has requested that further notice requirement be waived 
    and the tariff and executed service agreements be allowed to become 
    effective November 1, 1994.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Iowa-Illinois Gas and Electric Company
    
    [Docket No. ER94-1547-000]
    
        Take notice that Iowa-Illinois Gas and Electric Company (Iowa-
    Illinois), on November 10, 1994, tendered for filing pursuant to 
    section 35.12 of the Regulations under the Federal Power Act an 
    amendment to the filing in this proceeding on August 10, 1994, as 
    amended on September 8, 1994. Iowa-Illinois states that the purpose of 
    the amended filing is to respond to requests for clarification of the 
    filing.
        Copies of the amendment to the filing were served upon the Illinois 
    Commerce Commission, the Iowa Utilities Board, Central Iowa Power 
    Cooperative and all persons whose names appear on the official service 
    list in this proceeding.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Commonwealth Electric Company
    
    [Docket Nos. ER94-1600-000 and ER94-1601-000]
    
        Take notice that on October 21, 1994, Commonwealth Electric Company 
    tendered for filing revised support data and a revised Attachment A for 
    each of two system power sale agreements between itself and United 
    Illuminating and Hudson Light and Power Department filed with the 
    Commission on August 26, 1994 in the above-referenced docket.
        A copy of this filing has been served upon the Buyers and upon the 
    Massachusetts Department of Public Utilities.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Montana-Dakota Utilities Co., a Division of MDU Resources 
    Group, Inc.
    
    [Docket No. ER94-1654-000]
    
        Take notice that on October 31, 1994, Montana-Dakota Utilities Co., 
    a division of MDU Resources Group, Inc. (Montana-Dakota) tendered for 
    filing an amendment of its initial filing in this docket.
        Montana-Dakota asserts that the amendment filing has been served on 
    Mid-Yellowstone Electric Cooperative, Inc. and on interested state 
    regulatory commissions.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Fairfield Energy Venture, L.P.
    
    [Docket No. ER95-65-000]
    
        Take notice that on October 24, 1994, Fairfield Energy Venture, 
    L.P. tendered for filing a Notice of Cancellation of FEV Rate Schedule 
    No. 1.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Otter Tail Power Company
    
    [Docket No. ER95-68-000]
    
        Take notice that on October 21, 1994, Otter Tail Power Company 
    tendered for filing a signed copy of an agreement between Manitoba 
    Hydro Electric Board and Otter Tail Power Company.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. New England Power Company
    
    [Docket No. ER95-94-000]
    
        Take notice that on October 31, 1994, New England Power Company, 
    tendered for filing an revised Service Agreement between New England 
    Power Company and Commonwealth Electric Company for transmission 
    service under NEP's FERC Electric Tariff, Original Volume No. 3.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. The Montana Power Company
    
    [Docket No. ER95-96-000]
    
        Take notice that on October 31, 1994, The Montana Power Company 
    (Montana), tendered for filing a revised Appendix 1 as required by 
    Exhibit C, for retail sales in accordance with the provisions of the 
    Residential Purchase and Sale Agreement (Agreement) between Montana and 
    the Bonneville Power Administration (BPA).
        The Agreement was entered into pursuant to the Pacific Northwest 
    Electric Power Planning and Conservation Act, Public Law 96-501. The 
    Agreement provides for the exchange of electric power between Montana 
    and BPA for the benefit of Montana's residential and farm customers.
        A copy of the filing has been served upon BPA.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Florida Power & Light Company
    
    [Docket No. ER95-100-000]
    
        Take notice that on October 31, 1994, Florida Power & Light Company 
    (FPL), filed an Contract for Purchases and Sales of Scheduled Power and 
    Energy between Florida Power & Light Company and Florida Power 
    Corporation. FPL requests an effective date of January 1, 1994.
        Comment date: November 30, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Commonwealth Electric Company
    
    [Docket No. ER95-105-000]
    
        Take notice that on October 31, 1994, Commonwealth Electric Company 
    (Commonwealth), tendered for filing pursuant to Section 35.12 of the 
    Commission's regulations, a System Power Sale Agreement governing the 
    sale by Commonwealth of System Power (as defined herein) to Enton Power 
    Marketing Inc. (referred to herein as the Buyer) to become effective on 
    November 1, 1994.
        By the provisions of this agreement, Commonwealth proposes to sell 
    to the Buyer electric power upon terms and conditions and in amounts 
    mutually acceptable to the respective party.
        A copy of this filing has been served upon the Buyers and upon the 
    Massachusetts Department of Public Utilities.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Wisconsin Electric Power Company
    
    [Docket No. ER95-106-000]
    
        Take notice that on October 31, 1994, Wisconsin Electric Power 
    Company (Wisconsin Electric), tendered for filing an Electric Service 
    Agreement between itself and Dairyland Power Cooperative (Dairyland). 
    The Electric Service Agreement provides for service under Wisconsin 
    Electric's Coordination Sales Tariff.
        Wisconsin Electric requests an effective date of sixty days from 
    date of filing. Copies of the filing have been served on Dairyland and 
    the Public Service Commission of Wisconsin.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Appalachian Power Company and Kanawha Valley Power Company
    
    [Docket No. ER95-107-000]
    
        Take notice that on October 31, 1994, Appalachian Power Company 
    (APCo) and Kanawha Valley Power Company (Kanawha Valley), jointly 
    tendered for filing with the Commission, a Notice of Cancellation of 
    Kanawha Valley's FPC Rate Schedule Nos. 1 and 2. An application 
    requesting authority to merge Kanawha Valley into APCo is currently 
    pending before the Securities and Exchange Commission.
        APCo and Kanawha Valley request an effective date of December 31, 
    1994, the anticipated date of the merger, and state that a copy of 
    their filing was served upon the Virginia State Corporation Commission 
    and the Public Service Commission of West Virginia.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. New York State Electric & Gas Corporation
    
    [Docket No. ER95-108-000]
    
        Take notice that on October 31, 1994, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing pursuant to Section 35.12 of 
    the Federal Energy Regulatory Commission's Rules of Practice and 
    Procedure, 18 CFR 35.12 (1994), as an initial rate schedule, an 
    agreement with Catex Power Marketing, Inc. (Catex). The agreement 
    provides a mechanism pursuant to which the parties can enter into 
    separately scheduled transactions under which NYSEG will sell to Catex 
    and Catex will purchase from NYSEG either capacity and associated 
    energy or energy only as the parties may mutually agree.
        NYSEG requests that the agreement become effective on November 1, 
    1994, so that the parties may, if mutually agreeable, enter into 
    separately scheduled transactions under the agreement. NYSEG has 
    requested waiver of the notice requirements for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and Catex.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Fitchburg Gas and Electric Light Company
    
    [Docket No. ER95-109-000]
    
        Take notice that on October 31, 1994, Fitchburg Gas and Electric 
    Light Company (Fitchburg) filed with the Commission a service agreement 
    between Fitchburg and Central Vermont for the sale of up to 8 MW 
    (winter maximum claimed capability) of capacity and associated energy 
    from Fitchburg #7. This is a service agreement under Fitchburg's FERC 
    Electric Tariff, Original Volume No. 2, which was accepted for filing 
    by the Commission in Docket No. ER92-88-000] on September 30, 1992. The 
    maximum capacity rate to be charged Central Vermont is below he maximum 
    capacity charges set forth in the Tariff, and the energy rate is that 
    established in the Tariff. Fitchburg requests that cancellation was 
    also filed.
        Fitchburg states that copies of the filing were served on Central 
    Vermont and the Massachusetts Department of Public Utilities.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. The Electric Exchange
    
    [Docket No. ER95-111-000]
    
        Take notice that on October 31, 1993, The Electric Exchange 
    (Applicant) petitioned the Commission for acceptance of Applicant's 
    Rate Schedule FERC No. 1; the granting of certain blanket approvals, 
    including the authority to sell electricity at market-based rates; and 
    the waiver of certain Commission regulations.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Virginia Electric and Power Company
    
    [Docket No. ER95-113-000]
    
        Take notice that on November 1, 1994, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing an amendment to the 
    contract for the purchase of electricity for resale (the Amended 
    Agreement) between Virginia Power and Central Virginia Electric 
    Cooperative (CVEC). Virginia Power states that under the Amended 
    Agreement, Virginia Power is to provide and CVEC is to purchase, with 
    certain exceptions, all of CVEC's electrical capacity and energy 
    requirements.
        Virginia Power, with the concurrence of CVEC, requests that the 
    Amended Agreement become effective on January 1, 1995.
        The Amended Agreement provides for the continuation of the 
    requirements service previously received by CVEC, with certain changes 
    in the terms and conditions. The principal changes involve defining 
    specific exceptions to CVEC's requirements service, pricing a portion 
    of CVEC's capacity requirements based on the costs of peaking capacity, 
    and granting CVEC the opportunity to terminate the Amended Agreement 
    prior to the end of its initial term upon the occurrence of certain 
    events.
        Virginia Power states that copies of the filing have been served 
    upon CVEC, the Virginia State Corporation Commission, and the North 
    Carolina Utilities Commission.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Montaup Electric Company
    
    [Docket No. ER95-129-000]
    
        Take notice that on November 1, 1994, Montaup Electric Company 
    (Montaup or the Company) tendered for filing rate schedule revisions 
    incorporating the 1995 forecast billing rate for its purchased capacity 
    adjustment clause (PCAC) for all-requirements service to Montaup's 
    affiliates Eastern Edison Company (Eastern Edison) in Massachusetts and 
    Blackstone Valley Electric Company (Blackstone) and Newport Electric 
    Corporation (Newport) in Rhode Island, and contract demand service to 
    two non-affiliated customers: The town of Middleborough in 
    Massachusetts and the Pascoag Fire District in Rhode Island. The new 
    forecast billing rate is $16.44554/kw-Mo. Montaup requests that the new 
    rate become effective January 1, 1995 in accordance with the PCAC.
        Montaup's filing was served on the affected customers, the 
    Attorneys General of Massachusetts and Rhode Island, the Rhode Island 
    Public Utilities Commission and the Massachusetts Department of Public 
    Utilities.
        Comment date: December 1, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Las Vegas Cogeneration Limited Partnership
    
    [Docket Nos. QF89-251-004 and EL95-9-000]
    
        On November 4, 1994, Las Vegas Cogeneration Limited Partnership 
    (Applicant), filed a petition with the Federal Energy Regulatory 
    Commission for a temporary waiver of the operating and efficiency 
    standards for calendar year 1994 pursuant to Section 292.205(c) of the 
    Commission's Regulations. No determination has been made that the 
    submittal constitutes a complete filing.
        According to the applicant, the 45 MW topping-cycle cogeneration 
    facility which is located in Clark County, Nevada consists of a 
    combustion turbine generator, a heat recovery boiler and an extraction/
    condensing steam turbine generator. Steam recovered from the facility 
    is used by the applicant for heating a 12-acre greenhouse. The primary 
    energy source is natural gas. The facility was placed in service on May 
    11, 1994. Applicant filed notices of self-certification and self-
    recertification in Docket Nos. QF89-251-000 and QF89-251-002, 
    respectively. The facility was certified as a qualifying facility in 
    Docket No. QF89-251-001 [57 FERC 62,035 (1991)], and recertified in 
    Docket No. QF89-251-003 [60 FERC 62,094 (1992)].
        Applicant states that the temporary waiver is requested because 
    during the testing period, no useful thermal energy was delivered to 
    the greenhouse. Thus, the facility failed to meet the Commission's 
    operating and efficiency standards.
        Comment date: Thirty days after the date of publication in the 
    Federal Register, in accordance with Standard Paragraph E at the end of 
    this notice.
    
    31. Texaco Refining and Marketing Inc.
    
    [Docket No. QF95-19-000]
    
        On November 4, 1994, Texaco Refining and Marketing Inc. of 1401 
    South Douglas Road, P.O. Box 1121, El Dorado, Kansas 67042-1121, 
    submitted for filing an application for certification of a facility as 
    a qualifying facility pursuant to Section 292.207(b) of the 
    Commission's Regulations. No determination has been made that the 
    submittal constitutes a complete filing.
        According to the applicant, the cogeneration facility will be 
    located in El Dorado, Kansas. The facility will consist of a combustion 
    turbine generator and an unfired heat recovery boiler. Steam recovered 
    from the facility will be used at the Texaco refinery for thermal and 
    mechanical processes. The maximum net power production capacity of the 
    facility will be 38.25 MW. The primary energy sources will be refinery-
    produced Syngas and natural gas. Construction of the facility is 
    expected to commence in the first quarter of 1995.
        Comment date: Thirty days after the date of publication in the 
    Federal Register, in accordance with Standard Paragraph E at the end of 
    this notice.
    
    32. Allegheny Generating Company for an Increase in Electric Rates
    
    [Docket No. ER95-144-000]
    
        Take notice that on October 28, 1994, Allegheny Generating Company 
    tendered for filing a request to include approximately $11.99 million 
    in rate base. The proposed change would increase revenues from 
    jurisdictional sales and service by $1.2 million based on the twelve 
    month period ending December 31, 1995. The proposed effective date for 
    the increased rates is January 1, 1995. Copies of the filing have been 
    provided to the Pennsylvania Public Utility Commission, the Maryland 
    Public Service Commission, the Virginia State Corporation Commission, 
    the West Virginia Public Service Commission, the Ohio Public Utilities 
    Commission and all parties of record.
        Comment date: December 2, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-29321 Filed 11-28-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/29/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-29321
Dates:
December 8, 1994, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: November 29, 1994, Docket No. EG95-7-000, et al.