    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Conduit Exemption
    
    February 11, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Conduit Exemption.
        b. Project No: 11468-001.
        c. Date filed: January 28, 1998.
        d. Applicant: North Side Canal Company.
        e. Name of Project: Crossroads Conduit Project.
        f. Location: On the North Side canal system in Jerome County, Idaho 
    (T. 7S. R. 16E., Sections 23, 24, and 25).
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
    825(r).
        h. Applicant Contact:
    
    Randolph J. Hill, Ida-West Energy Company, P.O. Box 7867, Boise, ID 
    83707, (208) 395-8930
    
     or
    
    John Rosholt, Rosholt, Robertson & Tucker, P.O. Box 1906, Twin Falls, 
    ID 83301, (208) 734-0700.
    
        i. FERC Contact: Hector M. Perez at (202) 219-2843.
        j. Description of Project: The proposed project would consist of: 
    (1) A 900-foot-long, 150-foot-wide forebay with a normal water surface 
    elevation of 3,773.5 feet formed by two dikes with a maximum height 
    above existing ground surface of 9 feet; (2) a primary overflow bypass 
    channel with a top elevation of 3,774 feet and a secondary overflow 
    bypass channel with a top elevation of 3,774.75 feet, both at the 
    forebay; (3) a reinforced concrete intake structure; (4) a 10-foot-
    diameter, 1,750-foot-long steel penstock; and (5) a reinforced concrete 
    powerhouse with a 3,200-kilowatt turbine-generator unit.
        k. Under Section 4.32(b)(7) of the Commission's regulations (18 
    CFR), if any resource agency, Indian Tribe, or person believes that the 
    applicant should conduct an additional scientific study to form an 
    adequate factual basis for a complete analysis of the application on 
    its merits, they must file a request for the study with the Commission, 
    not later than 60 days after the application is filed, and must serve a 
    copy of the request on the applicant.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-3946 Filed 2-17-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/18/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-3946
Pages:
8194-8194 (1 pages)
PDF File:
98-3946.pdf