98-4271. Notice of Intent to File Application for New License  

  • [Federal Register Volume 63, Number 34 (Friday, February 20, 1998)]
    [Notices]
    [Pages 8633-8634]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-4271]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Intent to File Application for New License
    
    February 13, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of filing: Notice of Intent to File Application for New 
    License.
        b. Project No.: 3410.
        c. Date filed: January 28, 1998.
        d. Submitted By: Woods Lake Hydro Company.
        e. Name of Project: Woods Lake.
        f. Location: On Lime Creek in Eagle County, Colorado.
        g. Filed Pursuant to: Section 15 of the Federal Power Act, 18 CFR 
    16.6 of the Commission's regulations.
        h. Effective date of original license: February 1, 1983.
        i. Expiration date of original license: January 31, 2003.
        j. The project consists of: (1) a 6-foot-high, 3713-foot-long 
    reinforced concrete dam with a spillway crest elevation of
    
    [[Page 8634]]
    
    9,588.5 feet; (2) a reservoir with negligible storage capacity; (3) a 
    gated and screened intake structure and sluiceway; (4) a 15-inch-
    diameter, 630-foot-long PVC penstock; (5) a powerhouse with a 45-
    kilowatt turbine-generator unit; (6) a 24-inch-diameter corrugated 
    metal pipe tailrace; (7) a 2.4 KV, 1.02-mile-long transmission line; 
    and (8) other appurtenances.
        k. Pursuant to 18 FR 16.7, information on the project is available 
    at: Lake Woods Hydro Company, P.O. Box 11175, Aspen, CO 81612, (970) 
    925-8854; or Kenneth M. Knight, P.O. Box 247, Parker, CO 80134, (303) 
    841-5771.
        l. FERC contact: Hector M. Perez (202) 219-2843.
        m. Pursuant to 18 CFR 16.9(b)(1) each application for a new license 
    and any competing license applications must be filed with the 
    Commission at least 24 months prior to the expiration of the existing 
    license. All applications for license for this project must be filed by 
    January 31, 2001.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-4271 Filed 2-17-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/20/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-4271
Pages:
8633-8634 (2 pages)
PDF File:
98-4271.pdf