98-4324. Northern States Power Company, Prairie Island Nuclear Plant and Prairie Island Independent Spent Fuel Storage Installation; Issuance of Director's Decision Under 10 CFR 2.206  

  • [Federal Register Volume 63, Number 34 (Friday, February 20, 1998)]
    [Notices]
    [Pages 8703-8710]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-4324]
    
    
    
    [[Page 8703]]
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Nos. 50-282, 50-306 and 72-10]
    
    
    Northern States Power Company, Prairie Island Nuclear Plant and 
    Prairie Island Independent Spent Fuel Storage Installation; Issuance of 
    Director's Decision Under 10 CFR 2.206
    
        Notice is hereby given that the Director, Office of Nuclear Reactor 
    Regulation, has issued a Director's Decision concerning a Petition 
    dated August 26, 1997, filed by the Prairie Island Coalition 
    (Petitioner) under Section 2.206 of Title 10 of the Code of Federal 
    Regulations (10 CFR 2.206). The Petitioner requests that the NRC (1) 
    suspend Northern States Power Company's (the licensee's) Materials 
    License No. SNM-2506 for cause under Section 50.100 of Title 10 of the 
    Code of Federal Regulations (10 CFR 50.100) until all material issues 
    regarding the maintenance, unloading, and decommissioning processes and 
    procedures, as described in the Petition and in the Petition filed on 
    May 28, 1997, by the Prairie Island Indian Community, have been 
    adequately addressed and resolved, and until the maintenance and 
    unloading processes and procedures in question are safely demonstrated 
    under the scrutiny of independent third-party review of the TN-40 cask 
    seal maintenance and unloading procedure; (2) determine that the 
    licensee violated 10 CFR 72.122(f) by using a cask design that requires 
    periodic seal maintenance and emergency seal replacement that must be 
    performed in the plant storage pool. The Petitioner asserts that these 
    casks cannot be placed back into the pool to perform these functions 
    due to unresolved problems with fuel degradation during storage, flash 
    steam, thermal shock, and the resulting potential for radiation 
    dispersion; (3) determine that the licensee violated 10 CFR 72.122(h) 
    by using a cask that must be placed into the pool for necessary 
    maintenance and/or unloading procedures. The Petitioner asserts that 
    such placement of the cask into the pool will prematurely degrade the 
    fuel and pose operational safety problems with respect to its ultimate 
    and necessary removal from dry cask storage; (4) determine that the 
    licensee violated 10 CFR 72.122(l) by loading casks and storing them 
    before the licensee had developed and implemented procedures adequate 
    to safely unload and decommission the TN-40 casks; (5) determine that 
    the licensee violated 10 CFR 72.130 by using the TN-40 cask and failing 
    to make provisions capable of accomplishing the removal of radioactive 
    waste and contaminated materials at the time the independent spent fuel 
    storage installation (ISFSI) is permanently decommissioned; (6) 
    determine that the licensee violated 10 CFR 72.11 by failing to provide 
    and include complete and accurate material information regarding 
    maintenance and unloading of TN-40 casks in the application for the 
    Prairie Island ISFSI and in subsequent submittals regarding cask 
    maintenance and unloading issues; (7) determine that the licensee 
    violated 10 CFR 72.12 by deliberately and knowingly submitting 
    incomplete and inaccurate material information regarding maintenance 
    and unloading of TN-40 casks in the application for the Prairie Island 
    ISFSI and in subsequent submittals regarding cask maintenance and 
    unloading issues; (8) require that the licensee pay a substantial 
    penalty for each cask loaded in violation of NRC regulations; (9) 
    administer such other sanctions for the alleged violations of NRC 
    regulations as the NRC deems necessary and appropriate; (10) provide 
    Petitioner the opportunity to participate in a public review of 
    maintenance, unloading, and decommissioning processes and procedures in 
    question and an opportunity to comment on draft findings after 
    investigation by the NRC; (11) order modification of the licensee's 
    Technical Specifications for the Prairie Island ISFSI to ensure a 
    demonstrated ability to, in fact, safely maintain, unload, and 
    decommission TN-40 casks; and (12) review the licensee's processes and 
    procedures for maintenance, unloading, and decommissioning, and if the 
    licensee does not possess capability to unload casks, order the 
    licensee to build a ``hot shop'' for air unloading of casks and 
    transfer of the fuel.
        The Director of the Office of Nuclear Reactor Regulation has 
    determined that the Petition should be denied for the reasons stated in 
    the ``Director's Decision Under 10 CFR 2.206'' (DD-98-02), the complete 
    text of which follows this notice. The decision and documents cited in 
    the decision are available for public inspection and copying in the 
    Commission's Public Document Room, the Gelman Building, 2120 L Street, 
    NW., Washington, D.C., and at the local public document room in the 
    Minneapolis Public Library, Technology and Science Department, 300 
    Nicollet Mall, Minneapolis, Minnesota.
        A copy of this decision has been filed with the Secretary of the 
    Commission for the Commission's review in accordance with 10 CFR 
    2.206(c). As provided therein, this decision will become the final 
    action of the Commission 25 days after issuance unless the Commission, 
    on its own motion, institutes a review of the decision within that 
    time.
    
        Dated at Rockville, Maryland, this 11th day of February 1998.
    
        For the Nuclear Regulatory Commission.
    Frank J. Miraglia,
    Acting Director, Office of Nuclear Reactor Regulation.
    
    [DD-98-02]
    
    Director's Decision Under 10 CFR 2.206
    
    I. Introduction
    
        On August 26, 1997, the Prairie Island Coalition filed a Petition 
    pursuant to Section 2.206 of Title 10 of the Code of Federal 
    Regulations (10 CFR 2.206) requesting that the U.S. Nuclear Regulatory 
    Commission (NRC) take action to accomplish the following:
        1. Suspend Northern States Power Company's (the licensee's) 
    Materials License No. SNM-2506 for cause under Section 50.100 of Title 
    10 of the Code of Federal Regulations (10 CFR 50.100) until all 
    material issues regarding the maintenance, unloading, and 
    decommissioning processes and procedures, as described in the Petition 
    and in an earlier Petition filed on May 28, 1997, by the Prairie Island 
    Indian Community, have been adequately addressed and resolved, and 
    until the maintenance and unloading processes and procedures in 
    question are safely demonstrated under the scrutiny of independent 
    third-party review of the TN-40 cask seal maintenance and unloading 
    procedure;
        2. Determine that the licensee violated 10 CFR 72.122(f) by using a 
    cask design that requires periodic seal maintenance and emergency seal 
    replacement that must be performed in the plant storage pool. The 
    Petitioner asserts that these casks cannot be placed back into the pool 
    to perform these functions due to unresolved problems with fuel 
    degradation during storage, flash steam, thermal shock, and the 
    resulting potential for radiation dispersion;
        3. Determine that the licensee violated 10 CFR 72.122(h) by using a 
    cask that must be placed into the pool for necessary maintenance and/or 
    unloading procedures. The Petitioner asserts that such placement of the 
    cask into the pool will prematurely degrade the fuel and pose 
    operational safety problems with respect to its ultimate and necessary 
    removal from dry-cask storage;
        4. Determine that the licensee violated 10 CFR 72.122(l) by loading 
    casks and storing them before developing and preparing procedures 
    adequate to safely
    
    [[Page 8704]]
    
    unload and decommission the TN-40 casks;
        5. Determine that the licensee violated 10 CFR 72.130 by using the 
    TN-40 cask and failing to make provisions capable of accomplishing the 
    removal of radioactive waste and contaminated materials at the time the 
    independent spent fuel storage installation (ISFSI) is permanently 
    decommissioned;
        6. Determine that the licensee violated 10 CFR 72.11 by failing to 
    provide and include complete and accurate material information 
    regarding maintenance and unloading of TN-40 casks in the application 
    for the Prairie Island ISFSI and in subsequent submittals regarding 
    cask maintenance and unloading issues;
        7. Determine that the licensee violated 10 CFR 72.12 by 
    deliberately and knowingly submitting incomplete and inaccurate 
    material information regarding maintenance and unloading of TN-40 casks 
    in the application for the Prairie Island ISFSI and in subsequent 
    submittals regarding cask maintenance and unloading issues;
        8. Require that the licensee pay a substantial penalty for each 
    cask loaded in violation of NRC regulations;
        9. Administer such other sanctions for the alleged violations of 
    NRC regulations as the NRC deems necessary and appropriate;
        10. Provide Petitioner the opportunity to participate in a public 
    review of maintenance, unloading, and decommissioning processes and 
    procedures in question and an opportunity to comment on draft findings 
    after investigation by the NRC;
        11. Order modification of the licensee's Technical Specifications 
    for the Prairie Island ISFSI to ensure a demonstrated ability to in 
    fact safely maintain, unload, and decommission TN-40 casks; and
        12. Review the licensee's processes and procedures for maintenance, 
    unloading, and decommissioning, and if the licensee does not possess 
    capability to unload casks, order the licensee to build a ``hot shop'' 
    for air unloading of casks and transfer of the fuel.
        The Petition has been referred to me pursuant to 10 CFR 2.206. The 
    NRC letter dated October 2, 1997, to George Crocker, on behalf of the 
    Petitioner, acknowledged receipt of the Petition and reported the NRC 
    staff's determination that the Petition did not require immediate 
    action to be taken by the NRC. The letter of October 2, 1997, also 
    explained that the NRC staff would address the requests for formal 
    rulemaking proceedings as detailed in Items 13, 14, and 15 of the 
    Petition, in accordance with 10 CFR 2.802, ``Petition for Rulemaking.'' 
    A notice of receipt was published in the Federal Register on October 
    10, 1997 (62 FR 53031).
        On the basis of the NRC staff's evaluation of the issues and for 
    the reasons given below, the Petitioner's requests as detailed in Items 
    1 through 12 of the Petition are denied.
    
    II. Background
    
        On October 19, 1993, the NRC issued Materials License No. SNM-2506 
    to allow the licensee to store spent nuclear fuel in TN-40 dry-storage 
    casks, designed by Transnuclear Incorporated, at the ISFSI located at 
    the Prairie Island Nuclear Plant. The NRC issued Technical 
    Specifications (TS) defining operating limits, surveillance 
    requirements, design features, and administrative controls as Appendix 
    A to Materials License No. SNM-2506. No spent nuclear fuel was allowed 
    to be loaded into a storage cask at Prairie Island until several 
    preoperational license conditions were satisfied. Among the 
    preoperational license conditions were a required training exercise 
    (dry-run) of the loading, handling, and unloading activities for the 
    TN-40 casks and the implementation of written procedures describing the 
    actions to be taken during operational, off-normal, and emergency 
    conditions associated with the Prairie Island ISFSI.
        A report dated April 20, 1995, submitted by the licensee to the NRC 
    pursuant to 10 CFR 72.82(e), gave the results of the preoperational 
    tests that the licensee was required to perform before loading spent 
    fuel into a TN-40 cask.1 On May 12, 1995, following the 
    completion of the staff's reviews and inspections that found that the 
    licensee had satisfied the conditions of the license, the licensee 
    began loading spent fuel assemblies into a TN-40 cask. The licensee 
    subsequently placed the cask, and casks loaded since that time, onto 
    the storage pad within the Prairie Island ISFSI.
    ---------------------------------------------------------------------------
    
        \1\ On May 11, 1995, the NRC granted a schedular exemption to 
    the provision of 10 CFR 72.82(e) that requires licensees to submit 
    the preoperational test results at least 30 days before receipt of 
    spent fuel into the ISFSI. The basis for the exemption was the fact 
    that the NRC staff had reviewed cask fabrication records, observed 
    portions of the preoperational test activities, and completed its 
    review of the report submitted on April 20, 1995.
    ---------------------------------------------------------------------------
    
        The NRC staff's determination that the licensee was in compliance 
    with applicable regulations and license conditions was the basis for 
    the NRC staff's decision to approve the ISFSI at Prairie Island and to 
    allow the actual loading of TN-40 casks at that facility. The 
    Petitioner has requested that, in light of the information in the 
    Petition, the NRC staff reconsider its findings and suspend Materials 
    License No. SNM-2506. The regulations cited by the Petitioner as those 
    that establish technical requirements not being satisfied by the 
    licensee for the ISFSI at Prairie Island are:
         72.122(f) Testing and maintenance of systems and 
    components. Systems and components that are important to safety must be 
    designed to permit inspection, maintenance, and testing.
         72.122(h) Confinement barriers and systems. (1) The spent 
    fuel cladding must be protected during storage against degradation that 
    leads to gross ruptures or the fuel must be otherwise confined such 
    that degradation of the fuel during storage will not pose operational 
    safety problems with respect to its removal from storage. This may be 
    accomplished by canning of consolidated fuel rods or unconsolidated 
    assemblies or other means as appropriate.
         72.122(l) Retrievability. Storage systems must be designed 
    to allow ready retrieval of spent fuel or high-level radioactive waste 
    for further processing or disposal.
         72.130 Criteria for decommissioning. The ISFSI or MRS 
    (monitored retrievable storage [installation]) must be designed for 
    decommissioning. Provisions must be made to facilitate decontamination 
    of structures and equipment, minimize the quantity of radioactive 
    wastes and contaminated equipment, and facilitate the removal of 
    radioactive wastes and contaminated materials at the time the ISFSI or 
    MRS is permanently decommissioned.
        The regulations in 10 CFR Part 72 require that the design of the 
    storage system and the procedures implemented by specific licensees 
    support the unloading activity, whether it is being performed to allow 
    further processing or disposal of the spent fuel, such as may be 
    necessary to support decommissioning of the ISFSI; as part of planned 
    maintenance activities; or as part of the response to an unplanned 
    event or condition. The unloading of a cask, for any reason, should be 
    performed in a manner that prevents gross rupture of the fuel cladding, 
    which could result in operational safety problems. Although unloading 
    procedures need not contain detailed guidance on removing damaged fuel, 
    they should contain precautions in case fuel cladding has unexpectedly 
    degraded during storage so that additional measures can be taken to 
    address increased radiological hazards during the unloading process.
        NRC regulations, facility licenses, and NRC-approved quality 
    assurance
    
    [[Page 8705]]
    
    programs require licensees to establish and maintain a formal process 
    for preparing and issuing procedures and changes thereto. NRC 
    assessments of licensee procedures are generally conducted within the 
    NRC's inspection program. The major procedures pertaining to dry-cask-
    storage activities at Prairie Island, including the procedure for 
    unloading a cask, were reviewed by the NRC staff during a special 
    inspection conducted from January 24 through May 11, 1995, to oversee 
    the preoperational activities discussed above. In addition to reviewing 
    the licensee's facility and procedures, as previously noted, the NRC 
    inspectors observed preoperational testing that the licensee was 
    required to perform before loading casks with spent fuel assemblies. 
    The inspection findings are documented in NRC Inspection Report 50-282/
    95002; 50-306/95002; 72-10/95002(DRP), dated June 30, 1995.
        The NRC inspectors noted several instances in which the procedures 
    for dry-cask-storage activities that the licensee had in place at the 
    beginning of the inspection, including the procedures for loading and 
    unloading of TN-40 casks, did not ensure compliance with the 
    requirements of the license. Although the licensee corrected these 
    procedural deficiencies during the course of the inspection, the staff 
    issued a Notice of Violation to the licensee for failing to satisfy 
    Criterion V of Appendix B to 10 CFR Part 50, which, for activities 
    affecting quality, requires the preparation of and adherence to 
    procedures appropriate to the circumstances. In addition, the 
    inspectors found weaknesses in the licensee's initial performance in 
    overseeing the activities of the cask vendor and in overall planning 
    for dry-cask-storage activities. On the basis of the licensing reviews 
    and inspection findings, documented in Inspection Report 50-282/95002; 
    50-306/95002; 72-10/95002(DRP), the NRC staff concluded that as of May 
    1995, the licensee had corrected these deficiencies and was ready to 
    safely load, and if necessary unload, spent nuclear fuel in TN-40 
    casks.
        In July 1995, the NRC staff issued an action plan for dry-cask 
    storage to manage the resolution of a variety of technical and process 
    issues that were noted during the licensing reviews and inspections 
    completed for the first several ISFSI facilities, including the ISFSI 
    at Prairie Island. An item related to the loading and unloading of dry-
    storage casks was added to the action plan, in part to ensure that the 
    importance of the unloading procedures was emphasized to licensees and 
    that technical issues related to unloading problems were resolved. 
    Addition of an item pertaining to unloading was deemed prudent because 
    the staff observed that some of the licensees' unloading procedures 
    failed to consider contingencies and assumptions related to possible 
    fuel degradation, gas-sampling techniques, cask design issues, 
    radiation protection requirements, and the thermal-hydraulic behavior 
    of a cask during the process of cooling and filling it with water from 
    the spent fuel pool.
        To fulfill the goals of its dry-cask-storage action plan, the NRC 
    staff has emphasized the importance of unloading procedures and shared 
    observations with licensees using or considering dry-cask storage. The 
    staff revised inspection procedures and licensing review guidance to 
    specifically instruct NRC inspectors to review unloading procedures 
    developed by licensees and to identify those issues that warrant 
    particular attention. Application of the revised guidance ensures that 
    recent and future reviews will address the adequacy of unloading 
    procedures developed by licensees. To address those ISFSIs that began 
    operation before NRC improved its guidance on review and inspection, 
    the staff audited or inspected those licensee programs for which the 
    inspection record did not document whether the unloading procedures 
    adequately addressed the major issues in the action plan. Regarding 
    Prairie Island, the staff reviewed the available information and 
    determined that the assessment of the unloading procedure performed as 
    part of the inspection documented in NRC Inspection Report 50-282/
    95002; 50-306/95002; 72-10/95002(DRP) adequately addressed the concerns 
    in the NRC action plan, and that additional reviews or inspections 
    therefore were not necessary.
        In a Petition dated June 5, 1995, Prairie Island Coalition 
    requested that, among other things, the NRC review--and take whatever 
    administrative actions were necessary concerning--the licensee's plans 
    to unload a TN-40 cask if the spent fuel pool lacked sufficient space 
    to accommodate the spent fuel assemblies from a cask. The NRC staff 
    issued Northern States Power Company (Prairie Island Nuclear Generating 
    Plant, Units 1 and 2), DD-96-21, 44 NRC 297, on November 27, 1996, 
    denying the Petitioner's request. The denial was based, in part, on the 
    staff's finding that if a cask must be unloaded, it is unlikely that 
    the need to unload it would represent a time-urgent activity and the 
    licensee would be able to develop and execute a plan to maintain the 
    safe storage of the spent fuel assemblies. The NRC staff determined 
    that even if such an unlikely event occurred and the licensee needed to 
    implement corrective actions to maintain safe storage conditions, 
    options would be available to the licensee. These options include 
    returning a cask to the auxiliary building, returning a cask to the 
    spent fuel pool without actually removing the spent fuel, and removing 
    non-fuel-bearing components from the spent fuel pool to allow the 
    removal of fuel assemblies from a cask. Id., 44 NRC at 309.
        The Petitioner has incorporated by reference a Petition dated May 
    28, 1997, filed by the Prairie Island Indian Community, which, among 
    other things, asked the NRC to suspend Materials License No. SNM-2506 
    on the premise that the licensee has failed to establish adequate 
    procedures for safely unloading the TN-40 dry-storage containers. The 
    Prairie Island Indian Community also requested that an independent 
    third-party review of the TN-40 unloading procedure be conducted, that 
    they be given an opportunity to participate fully in the reviewing of 
    the unloading procedure for the TN-40 cask, that the NRC hold hearings 
    and allow them to participate fully in these and in any other 
    procedures initiated in response to their Petition, and that the TS for 
    the Prairie Island ISFSI be revised to incorporate mandatory unloading 
    procedure requirements. The NRC issued Northern States Power Company 
    (Prairie Island Nuclear Plant and Prairie Island Independent Spent Fuel 
    Storage Installation), DD-97-18, on August 29, 1997, denying the 
    requests made by the Prairie Island Indian Community. Although the 
    staff acknowledged the potential difficulties in retrieving fuel from 
    dry-storage casks if significant fuel degradation has occurred, the NRC 
    staff concluded that licensees need not be required to incorporate 
    specific guidance into the normal unloading procedure to address this 
    unlikely situation. This conclusion was based on the staff's findings 
    that (1) the licensee's procedure could support the normal unloading of 
    spent fuel assemblies from TN-40 casks at Prairie Island, (2) the 
    licensee's unloading procedure contained the necessary measurements and 
    precautions to detect if fuel had degraded during storage, and (3) the 
    licensee could reasonably be expected to develop procedures to safely 
    unload damaged fuel assemblies in the unlikely event that fuel did 
    degrade during storage.
    
    [[Page 8706]]
    
    III. Discussion
    
        The Petitioner requests actions by the NRC based on the contention 
    that the unloading procedure developed by the licensee is inadequate 
    and, therefore, the licensee has violated various NRC regulations 
    related to having the ability to test and maintain systems and 
    components, protecting the spent fuel cladding from degradation, 
    designing storage systems to allow ready retrieval of spent fuel for 
    further processing or disposal, and designing ISFSIs to facilitate 
    decommissioning activities. In addition, the Petitioner alleges that 
    the licensee violated NRC regulations pertaining to the submittal of 
    complete and accurate information regarding maintenance and unloading 
    issues associated with the TN-40 cask.
    
    Item 1. Suspend SNM-2506
    
        On the basis of the contention that the licensee's unloading 
    procedure is inadequate, and, therefore, that the licensee is in 
    violation of NRC regulations such as 10 CFR 72.122 and 10 CFR 72.130, 
    the Petitioner requests that Materials License No. SNM-2506 be 
    suspended for cause, in accordance with 10 CFR 50.100, until such time 
    as the significant issues in the unloading process have been resolved 
    and the unloading process has been demonstrated under the scrutiny of 
    an independent third-party review.2
    ---------------------------------------------------------------------------
    
        \2\ The Petitioners request that Materials License No. SNM-2506 
    be suspended for cause in accordance with 10 CFR 50.100. Provisions 
    for the modification, revocation, or suspension of the licenses for 
    ISFSI facilities are contained in 10 CFR 72.60. The possible reasons 
    for suspending licenses for ISFSIs in accordance with 10 CFR 72.60 
    are similar to the corresponding reasons for suspending licenses for 
    production and utilization facilities in accordance with 10 CFR 
    50.100.
    ---------------------------------------------------------------------------
    
        As previously stated, the NRC staff has reviewed the licensee's 
    procedure for unloading a TN-40 cask at Prairie Island. The review, 
    including verification that the licensee's unloading procedure was 
    revised to address deficiencies found by the NRC inspectors, is 
    documented in NRC Inspection Report 50-282/95002; 50-306/95002; 72-10/
    95002(DRP). Reasonable confidence that the licensee could, if 
    necessary, safely unload a TN-40 cask is supported by the findings from 
    the NRC inspection. The findings of subsequent evaluations performed by 
    the NRC staff as part of the activities associated with the dry-cask-
    storage action plan and the review of the Petition filed by the Prairie 
    Island Indian Community confirmed the adequacy of the licensee's 
    procedure for unloading a cask. The licensee is required to maintain 
    the adequacy of the unloading procedure through programs required by 
    NRC regulations, facility licenses, and NRC-approved quality assurance 
    programs. Additional bases for the staff's findings regarding the cited 
    regulatory requirements are discussed in the sections that follow. The 
    NRC staff has determined that the findings discussed in the subsequent 
    sections of this decision adequately address the Petitioner's claims 
    regarding the licensee's compliance with the regulatory requirements 
    pertaining to retrievability of spent fuel, maintenance of ISFSI 
    systems, and decommissioning. The Petitioner's request to suspend 
    Materials License No. SNM-2506 is, therefore, denied.
        Regarding a third-party review, the NRC staff's concern about the 
    quality of licensees' unloading procedures led NRC to include the issue 
    in the dry-cask-storage action plan. The action plan served as a 
    framework for identifying and resolving various technical and 
    administrative issues related to the use of dry-storage casks. The 
    previously-mentioned actions taken by the NRC staff and licensees 
    adequately resolved the issues pertaining to cask unloading procedures. 
    In the specific case of the unloading procedure at Prairie Island, the 
    licensee revised the procedure to address the problems raised by the 
    staff during its inspection. On the basis of the actions it has already 
    taken, the NRC staff does not believe that requiring additional 
    demonstration of the procedures or review of the licensee's procedures 
    by an independent third party is warranted.
    
    Item 2. Determine That the Licensee Violated 10 CFR 72.122(f)
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.122(f) by using a cask design that may require 
    periodic seal maintenance or seal replacement that would necessitate 
    returning the cask to the spent fuel pool. The Petitioner asserts that 
    these casks cannot be placed back into the pool for the licensee to 
    perform these functions, due to unresolved problems with fuel 
    degradation during storage, flash steam, thermal shock, and the 
    resulting potential for radiation dispersion. The Petitioner states 
    that such a condition is in violation of the requirements that systems 
    and components that are important to safety must be designed to permit 
    inspection, maintenance, and testing.
        The fact that the TN-40 cask design uses metallic seals to maintain 
    the helium atmosphere within the cask was thoroughly reviewed during 
    the licensing of the Prairie Island ISFSI as well as during staff 
    reviews of similar casks designed by Transnuclear Inc., such as the TN-
    24 cask, which has been certified as an acceptable cask for use under 
    the general licensing provisions of Subpart K of 10 CFR Part 72, and 
    the TN-32 cask, which has had an associated topical report approved by 
    the NRC staff for referencing in site-specific licensing applications. 
    The seal design and related pressure-monitoring system were found to 
    provide the necessary confidence that the inert atmosphere would be 
    maintained and thereby prevent degradation of the fuel cladding during 
    storage.
        If it were necessary to repair or replace the metallic seals, the 
    licensee would use the unloading procedure or a similar procedure to 
    control the return of a TN-40 cask to the spent fuel pool. As will be 
    discussed in more detail in the following section, the staff has 
    determined that the licensee's unloading procedure is adequate. As 
    documented in NRC Inspection Report 50-282/95002; 50-306/95002; 72-10/
    95002(DRP), the NRC staff did not require demonstration of seal 
    replacement activities but did find that those activities performed 
    during the dry-run exercises were adequate to demonstrate that such an 
    activity could, if necessary, be accomplished. Given the staff's 
    finding that the licensee's procedure for returning a cask to the spent 
    fuel pool and subsequently unloading the fuel would not cause 
    operational safety problems and the fact that the same procedure or a 
    similar procedure would be used to support the repair or replacement of 
    a TN-40 cask's metallic seals, the NRC concludes that the licensee has 
    not violated 10 CFR 72.122(f) as alleged by the Petitioner.
    
    Item 3. Determine That the Licensee Violated 10 CFR 72.122(h)
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.122(h) by using a cask that must be placed into the 
    spent fuel pool to perform necessary maintenance and unloading 
    procedures. The Petitioner asserts that such placement of the cask into 
    the pool will prematurely degrade the fuel and pose operational safety 
    problems with respect to its ultimate and necessary removal from dry-
    cask storage. The Petitioner states that such a condition is in 
    violation of the requirements that spent fuel cladding either be 
    protected against degradation that leads to gross ruptures or otherwise 
    confined so that fuel degradation during storage will not pose 
    operational safety problems with respect to its removal from storage.
    
    [[Page 8707]]
    
        The staff has found that the TN-40 cask can adequately maintain the 
    inert atmosphere within the cask to prevent fuel degradation and 
    provides for sufficient indication of the loss of the inert atmosphere 
    using the pressure-monitoring system. Maintaining the inert atmosphere 
    and other design requirements established for the TN-40 casks is 
    sufficient to protect the fuel cladding during storage. In the event 
    that the pressure-monitoring system indicates that the helium 
    atmosphere is not being maintained within a TN-40 cask, the TS for the 
    Prairie Island ISFSI require that the cask be returned to the spent 
    fuel pool for replacing or repairing the seals.
        The Petitioner asserts that the return of the cask to the spent 
    fuel pool will prematurely degrade fuel and poses operational safety 
    problems. In support of this assertion, the Petitioner enclosed, as 
    Exhibit A to the Petition, a letter from Dr. Gail Marcus of the NRC 
    staff, dated February 25, 1997, which responded to an inquiry made to 
    the NRC staff by Mr. George Crocker of the Prairie Island Coalition. In 
    the letter, Dr. Marcus makes the following statements:
    
        (1) As part of its assessments of licensees' procedures for 
    unloading dry storage casks, the NRC staff considers the dry-run 
    exercises performed to verify key aspects of unloading procedures, 
    as well as licensees' actual experience in the loading and unloading 
    of transportation casks, loading of storage casks, handling of spent 
    fuel assemblies under various conditions, and performing various 
    activities associated with reactor facilities. In the absence of 
    actual experience in unloading spent fuel from a cask following a 
    long period of storage, a general understanding of technical 
    capabilities and related experiences enables the NRC staff to assess 
    the adequacy of a licensee's procedures for unloading dry storage 
    casks.
        (2) Although the limited unloading experiences with storage 
    casks have not involved the temperature differences between fuel and 
    coolant that may occur if a cask was unloaded after a period of 
    storage, engineering evaluations and experiences with transportation 
    casks have shown that ``thermal shocking'' is unlikely to cause 
    operational safety problems.
        (3) Although licensees would be able to develop means to 
    retrieve degraded fuel assemblies from a dry storage cask, the 
    accumulated occupational dose to perform this activity may be 
    increased from the previously mentioned estimates. Fuel reactivity 
    for criticality considerations could increase only under very 
    idealistic and highly unlikely disintegration patterns in the fuel. 
    Upon detection that fuel disintegration had occurred, special 
    measures would be developed and implemented to assure an adequate 
    safety margin is maintained during unloading.
    
        The statement regarding ``thermal shock'' is based on the fact that 
    the licensee's unloading procedure contains precautions to slowly 
    introduce water to the TN-40 cask and thereby minimize the thermal 
    shock to the fuel assemblies. As explained in DD-97-18, at pp. 13-14, 
    the NRC staff does not believe that the process of refilling a cask 
    with water and returning it to the spent fuel pool will cause fuel 
    degradation or operational safety problems. In DD-97-18, the staff 
    stated:
    
        The Petitioners expressed concerns regarding the reaction of the 
    cask and stored fuel assemblies to the introduction of spent fuel 
    pool water during the execution of the unloading procedure. The 
    unloading procedure includes the partial immersion of the TN-40 cask 
    into the spent fuel pool, connection of hoses to the vent and drain 
    connections, and the slow introduction of spent fuel pool water to 
    the cask cavity and stored fuel assemblies. The procedure instructs 
    personnel to continuously monitor the temperature and pressure 
    instrumentation installed on the vent connection and to stop pumping 
    water if the pressure exceeds 10 psig or the temperature exceeds 240 
     deg.F. In the staff's judgment, the cooling process imposed by 
    these limitations on temperatures and pressures at the vent port of 
    the cask will adequately ensure that the cooling of the cask and 
    spent fuel is gradual and, thereby, prevent safety problems that 
    could hypothetically result from damage to the cask or the fuel 
    assemblies because of stresses induced by a poorly controlled 
    addition of cooling water from the spent fuel pool.
    
        The Petitioner also cites a letter dated April 15, 1997, from Susan 
    Frant Shankman of the NRC staff to Sierra Nuclear Corporation, which 
    emphasizes that NRC regulations require that inert atmospheres be 
    maintained within dry-storage casks in order to prevent fuel 
    degradation during storage. The Petitioner states that the pressure-
    monitoring system is included in the design because the loss of helium 
    from TN-40 casks is an anticipated event and that neither fuel 
    degradation that may result from a loss of the helium nor the method by 
    which the licensee would replace a damaged seal has been addressed. As 
    previously mentioned, the NRC staff has found that the design of the 
    TN-40 casks, including its combination of metallic seals and a 
    pressure-monitoring system, is adequate to maintain a helium atmosphere 
    within the cask. The helium atmosphere, in turn, has been found, when 
    combined with other restrictions in the license for the Prairie Island 
    ISFSI, to adequately protect against degradation of the spent fuel 
    cladding.
        Given its finding that (1) fuel integrity will be maintained during 
    normal storage by the inert atmosphere and (2) the return of a cask to 
    the spent fuel pool for unloading or seal maintenance would not result 
    in fuel degradation that would result in operational safety problems, 
    the NRC staff has not identified a violation of 10 CFR 72.122(h) at the 
    Prairie Island ISFSI, as is claimed by the Petitioner.
    
    Item 4. Determine That the Licensee Violated 10 CFR 72.122(l)
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.122(l) by loading casks and storing them before the 
    licensee had developed and implemented procedures adequate to safely 
    unload and decommission the TN-40 casks.
        The staff's basis for determining that the licensee has not 
    violated the requirements of 72.122(l) for the reasons cited by the 
    Prairie Island Indian Community was discussed in DD-97-18. As discussed 
    in DD-97-18, normal unloading procedures do not need to incorporate 
    contingency actions for failed fuel, provided that precautions exist to 
    check for fuel degradation before breaching the confinement boundaries 
    of a cask. In the unlikely event that fuel degradation has occurred 
    during storage, the licensee would need to address the retrieval of 
    failed fuel and implement necessary precautions related to the 
    radioactive and fissile materials within the cask.
        In support of its claim regarding potential problems in unloading a 
    TN-40 cask, the Petitioner enclosed, as Exhibit B to the Petition, a 
    letter from the NRC staff which asked the licensee questions about a 
    proposed amendment to the operating license for the Prairie Island 
    Nuclear Generating Plant. 3 The proposed and subsequently 
    issued amendment pertained to the TS associated with the operability of 
    the
    
    [[Page 8708]]
    
    reactor facility's spent fuel pool special ventilation system during 
    movement of fuel assemblies within the spent fuel pool enclosure. 
    During its review of the proposed amendment, the NRC staff requested 
    that the licensee submit additional information about the use of the 
    ventilation system during the possible unloading of dry-storage casks. 
    This request for additional information, dated July 10, 1997, is the 
    letter cited by the Petitioner. In its response of July 29, 1997, to 
    the staff's request for additional information, the licensee explained 
    the relationship of the ventilation system to dry-cask activities and 
    clarified details of the procedure for unloading a TN-40 cask. The NRC 
    was satisfied with the licensee's response to the questions which 
    explained that the spent fuel pool special ventilation system is not 
    operable during the filling and venting of a cask during the unloading 
    procedure and that cracking of spent fuel rods is not expected as a 
    result of introducing water to the cask during the unloading procedure. 
    Those aspects of the proposed revision to the Prairie Island TS that 
    potentially related to dry-cask activities were subsequently approved 
    by the NRC staff in Amendment No. 130 to Facility Operating License No. 
    DPR-42 and Amendment No. 122 to Facility Operating License No. DPR-60.
    ---------------------------------------------------------------------------
    
        \3\ The Petitioner also claims that an NRC memorandum dated 
    April 16, 1997, that addressed a request from an NRC regional office 
    for clarification of terms associated with dry-cask storage, is 
    deficient in that it does not address possible problems that may be 
    encountered during unloading of a dry-storage cask or all of the 
    possible reasons for returning a dry-storage cask to the spent fuel 
    pool. In that memorandum, the staff stated:
        The two basic reasons to return a cask to the spent fuel pool 
    and unload the spent fuel assemblies are either to (1) retrieve the 
    fuel assemblies for further processing or disposal or (2) respond to 
    an event or condition that has potentially degraded the design 
    requirements established for the cask.
        The Petitioner claims that the memorandum failed to address two 
    reasons to return a cask to the spent fuel pool; maintenance of the 
    metallic seals and decommissioning of the ISFSI. These are, however, 
    only specific examples of the general reasons given above to unload 
    a cask. Seal maintenance is performed to respond to or prevent a 
    condition that potentially degrades the design requirements 
    associated with maintaining the inert atmosphere; decommissioning of 
    the ISFSI would obviously require retrieving or transporting the 
    fuel assemblies for further processing or disposal.
    ---------------------------------------------------------------------------
    
        In support of its claim regarding potential problems with removing 
    fuel assemblies from TN-40 casks, the Petitioner enclosed, as Exhibits 
    C and D to the Petition, letters from personnel at the Idaho National 
    Engineering Laboratory (INEL) regarding problems with removing fuel 
    canisters from a TN-24P cask during testing at INEL. The TN-24P cask is 
    similar in design to the TN-40 cask used at Prairie Island. The 
    problems were addressed in the rulemaking that added Transnuclear 
    Inc.'s TN-24 cask to the list of NRC-certified casks. The subject 
    comment on the proposed rulemaking pertaining to the TN-24 cask and the 
    NRC staff's response as published in the Federal Register (58 FR 51762) 
    are provided below:
    
        2. Comment. One commenter stated that the TN-24 cask is 
    seriously flawed. Test and operation at Idaho showed the TN-24 
    storage sleeves to be subject to warpage after only a few years of 
    storage. A fuel assembly became stuck in the TN-24 cask while trying 
    to remove it. It could not be removed and it was forced back into 
    the cask.
        Response. The NRC discussed this issue with personnel at INEL 
    who worked on the tests of the TN-24 cask and other casks. These 
    individuals said that a canister of consolidated fuel, not a fuel 
    assembly, got stuck in the TN-24 cask. The canister was larger than 
    a fuel assembly and, unlike a fuel assembly, it had many screws and 
    nuts protruding from it. The storage sleeves in the TN-24 Basket did 
    not warp. The individuals suspect that one of the screws or nuts got 
    caught on an interlocking plate in the basket of the TN-24 cask. The 
    Certificate of Compliance does not allow the storage of consolidated 
    fuel in canisters. Additionally, the basket of the TN-24 tested at 
    INEL is slightly different from the one which Transnuclear plans to 
    use in its certified cask.
    
    The license issued for the Prairie Island ISFSI also prohibits the 
    storage of consolidated fuel assemblies and, therefore, the problems 
    with unloading experienced during the testing at INEL are not expected 
    to occur when the licensee unloads its TN-40 casks.
        The Petitioner asserts that additional evidence that dry-storage 
    casks cannot be unloaded is provided by the experiences of the licensee 
    for the ISFSI at the Palisades Nuclear Plant. As discussed in detail in 
    NRC Inspection Report 50-255/96201(NRR) dated September 4, 1997, the 
    NRC staff has found that the Palisades dry-cask unloading procedure, 
    along with supporting operating, maintenance, radiation protection, and 
    administrative procedures, contains adequate directions for the safe 
    unloading of VSC-24 storage casks. 4
    ---------------------------------------------------------------------------
    
        \4\ The NRC staff has also found that the subject cask can 
    safely be used for storing spent fuel despite the licensee's 
    announced plans for unloading the cask after it discovered (from 
    radiographs for a weld in a VSC-24 multi-assembly sealed basket) 
    indications of possible defects. The licensee subsequently announced 
    that it was deferring the unloading of the cask pending the 
    availability of a cask that supports both storage and transport 
    functions.
    ---------------------------------------------------------------------------
    
        Much of the argument pertaining to the inadequacy of the licensee's 
    unloading procedure that is presented by the Petitioner centers on the 
    lack of an actual example of the unloading of a dry-storage cask at a 
    commercial reactor facility. As discussed in DD-97-18, the NRC staff's 
    judgment that there is reasonable assurance that the TN-40 casks can be 
    safely unloaded comes from a variety of experiences related to the use 
    and storage of radioactive materials. Among these experiences are the 
    dry-run exercises that were performed to verify key aspects of 
    unloading procedures for the TN-40 cask; related research sponsored by 
    the commercial nuclear industry, the U.S. Department of Energy, and the 
    NRC; actual loading and unloading of transportation casks; loading of 
    storage casks; handling of spent fuel assemblies under various 
    conditions; and performing relevant maintenance and engineering 
    activities associated with reactor facilities.
        The NRC staff has reviewed the information submitted by the 
    Petitioner and has determined that the licensee could, if necessary, 
    unload a TN-40 cask and has not, therefore, identified a violation of 
    10 CFR 72.122(l).
    
    Item 5. Determine That the Licensee Violated 10 CFR 72.130
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.130 by using the TN-40 cask and failing to make 
    provisions to successfully accomplish the removal of radioactive waste 
    and contaminated materials at the time the independent spent fuel 
    storage installation (ISFSI) is permanently decommissioned. The basis 
    for this assertion is that TN-40 casks cannot be safely unloaded. As 
    discussed in previous sections and as discussed in DD-96-21, the NRC 
    staff has found that spent nuclear fuel can be safely unloaded from the 
    TN-40 casks, whether such unloading is necessary in response to an 
    event or in support of decommissioning the ISFSI.
        In order to support the decommissioning of the Prairie Island 
    ISFSI, the licensee may need to transfer the spent fuel stored in TN-40 
    casks to another cask for transfer of the fuel assemblies to another 
    location for storage or disposal. In order to transfer the spent fuel 
    assemblies, the licensee will need to either return the casks to the 
    spent fuel pool or use a yet-to-be-approved system that transfers fuel 
    assemblies under dry conditions. In the event that the spent fuel pool 
    is used to transfer fuel assemblies, the unloading procedure or a 
    similar procedure would control the return of the fuel from the ISFSI 
    to the spent fuel pool. Given that the staff has determined that the 
    unloading procedure is adequate to control the unloading of fuel 
    assemblies from a TN-40 cask to the spent fuel pool, the staff has no 
    reason to (1) find that its use as part of the decommissioning of the 
    ISFSI facility raises unique questions regarding compliance with 10 CFR 
    72.130 or (2) otherwise change the conclusion it reached during the 
    licensing of the ISFSI at Prairie Island regarding the viability of 
    decommissioning the facility.
    
    Item 6. Determine That the Licensee Violated 10 CFR 72.11
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.11 by failing to provide and include complete and 
    accurate material information regarding maintenance and unloading of 
    TN-40 casks in the application for the Prairie Island ISFSI and in 
    subsequent submittals on the
    
    [[Page 8709]]
    
    subject of cask maintenance and unloading. In support of this 
    contention, the Petitioner references the letter from G. Marcus dated 
    February 25, 1997, (Exhibit A to the Petition), which explained the NRC 
    action plan for dry-cask storage and its item related to oversimplified 
    descriptions of the process for unloading fuel from casks as the 
    reverse of loading casks. In that letter to Mr. Crocker of the Prairie 
    Island Coalition, Dr. Marcus states:
    
        Some SARs do state that unloading is basically the reverse of 
    loading and this statement, in a general sense, is true, However, 
    such statements may tend to over-simplify matters because they do 
    not reflect that the unloading process introduces different 
    conditions and complications compared to the loading process. In the 
    NRC action plan for dry cask storage and related statements made by 
    the NRC staff, including those by Mr. Kugler, the staff was 
    emphasizing that licensees need to identify the conditions and 
    complications that are associated with the unloading process and 
    ensure that unloading procedures address those concerns. The 
    unloading procedure for the dry storage casks at Prairie Island was 
    inspected by the NRC staff and, following minor revisions, was found 
    to provide adequate guidance to control the unloading process. A 
    copy of NRC Inspection Report 50-282/95002; 50-306/95002; 72-10/
    95002 is provided as Enclosure 2.
    
    The petitioner asserts that upon receipt of information related to 
    unloading issues, the licensee has not taken steps to correct its 
    unloading problem and has refused to address these continuing problems.
        As stated in DD-97-18, in response to a similar request made by the 
    Prairie Island Indian Community, the safety analysis report (SAR) for 
    the Prairie Island ISFSI and other docketed correspondence do state 
    that a TN-40 cask would be unloaded using a procedure that is basically 
    the reverse of the procedure used to load the cask. Although this 
    statement, in a general sense, is true, the NRC staff has expressed its 
    concerns that such statements may oversimplify the description of the 
    unloading activity. For this reason, the NRC staff added an item 
    related to unloading procedures to its dry-cask-storage action plan to 
    ensure that actual unloading procedures did not reflect such an 
    oversimplified representation. Additional inspections, revised staff 
    guidance, and communications with the nuclear industry were conducted 
    under the staff's action plan related to this issue. The staff 
    inspected the unloading procedures at Prairie Island and found that 
    they provided adequate guidance to control the unloading process.
        The staff's review of the information originally submitted by the 
    licensee shows that the information pertaining to cask unloading was 
    complete and accurate given the staff's expectations and the 
    information provided by other licensees in applications submitted in 
    the same time period. It should be noted that material submitted by the 
    licensee for the ISFSI at Prairie Island includes copies of the loading 
    and unloading procedures and those procedures have been available for 
    public review. Regarding the information given to the NRC pertaining to 
    maintenance of the TN-40 casks, which the Petitioner also claims was 
    incomplete and inaccurate, the NRC staff acknowledged in its safety 
    evaluation report that maintenance activities were discussed only 
    briefly in the submittals supporting the ISFSI at Prairie Island. The 
    level of information submitted, however, was generally consistent with 
    the level of information in other applications of that same time period 
    and was sufficient to meet the staff's expectations for the review 
    process. The NRC staff has not identified a violation of 10 CFR 72.11 
    pertaining to the information provided by the licensee as is claimed by 
    the Petitioner.
    
    Item 7. Determine That the Licensee Violated 10 CFR 72.12
    
        The Petitioner requests that the NRC determine that the licensee 
    violated 10 CFR 72.12 by deliberately and knowingly submitting 
    incomplete and inaccurate material information regarding maintenance 
    and unloading of TN-40 casks in the application for the Prairie Island 
    ISFSI and in subsequent submittals on cask maintenance and unloading 
    issues. The Petitioner states that the licensee has continually 
    insisted that it can unload TN-40 casks and that the licensee has 
    referenced inapplicable studies to support its position.
        As mentioned in the response to the preceding item, the staff 
    believes that the information submitted by the licensee is consistent 
    with the information in other applications of that same time period and 
    was sufficient to meet the staff's expectations for the review process. 
    Given that the NRC staff has found that the licensee could, if 
    necessary, unload a cask, the staff does not agree this statement when 
    made by the licensee was deliberately incomplete or inaccurate 
    information in any material respect. The NRC staff has not identified a 
    violation of 10 CFR 72.12 pertaining to the information provided by the 
    licensee as is claimed by the Petitioner.
    
    Item 8. Require That the Licensee Pay a Substantial Penalty
    
        The Petitioner requests that the NRC require the licensee to pay a 
    substantial penalty for each cask loaded in violation of NRC 
    regulations. Given that the staff has not identified violations of NRC 
    regulations as alleged by the Petitioner, the staff has no basis to 
    issue a notice of violation and proposed civil penalty.
    
    Item 9. Administer Other Sanctions Deemed Necessary and Appropriate
    
        The Petitioner requests that the NRC administer such other 
    sanctions for the alleged violations of NRC regulations as the NRC 
    deems necessary and appropriate. Given that the staff has not 
    identified violations of NRC regulations as alleged by the Petitioner, 
    there is no basis for sanctions against the licensee.
    
    Item 10. Provide Petitioner the Opportunity to Review Procedures
    
        The Petitioner requests that it be given the opportunity to 
    participate in a public review of maintenance, unloading, and 
    decommissioning processes and procedures in question and an opportunity 
    to comment on draft findings after investigation by the NRC.
        Regarding the unloading procedure, the licensee has provided the 
    NRC with the unloading procedure, including Revision 2, dated November 
    8, 1996, for placement into the public record, and the Petitioner has 
    been supplied with a copy of the procedure. Accordingly, the Petitioner 
    has had the opportunity to review a recent revision of the unloading 
    procedure and may continue to review other documents in the public 
    domain. As previously discussed in this decision, the NRC staff has 
    performed various technical reviews and inspections related to the 
    issues raised by the Petitioner. These reviews and inspections have 
    provided the bases of the NRC staff's findings that the licensee has 
    complied with the applicable regulatory requirements. Given that no 
    violations or previously unidentified regulatory issues have been 
    raised by the Petitioner, the NRC staff sees no reason to undertake 
    additional reviews of the maintenance, unloading, and decommissioning 
    processes and procedures or to initiate public hearings.
        Regarding the Petitioner's request for an opportunity to comment on 
    draft findings after the requested NRC ``investigation,'' the request 
    is rendered moot by the NRC staff's determination that additional 
    reviews or ``investigations'' are unnecessary. In addition, the NRC 
    staff does not, as a matter of general policy, release draft or
    
    [[Page 8710]]
    
    predecisional information to its licensees or to the public for review 
    and comment.
    
    Item 11. Order Modification of the Licensee's ISFSI Technical 
    Specifications
    
        The Petitioner requests that the NRC issue an order to modify the 
    TS for the Prairie Island ISFSI to ensure a demonstrated ability to, in 
    fact, safely maintain, unload, and decommission TN-40 casks.
        Although the TS for the Prairie Island ISFSI require that TN-40 
    casks be unloaded if certain events or conditions defined in the TS are 
    satisfied, the TS do not include specific requirements for the 
    unloading process. Likewise the TS do not detail maintenance or 
    decommissioning procedures or processes. The content of the TS for the 
    Prairie Island ISFSI is typical in this respect since neither 10 CFR 
    72.44 nor the associated regulatory guidance documents specify that 
    technical specifications should include special requirements for these 
    procedures.5 Instead, the functional and operating limits, 
    limiting conditions, administrative controls, and other requirements 
    included in the TS for the Prairie Island ISFSI are intended to 
    maintain the cask and stored spent fuel assemblies within the limits 
    established for safe operation during storage within the ISFSI and 
    activities such as loading and unloading of the casks. For example, TS 
    2.3 limits the allowable lifting heights during movement of the cask 
    from the ISFSI and TS 3/4.2 requires a measurement of the boron 
    concentration of the water in the spent fuel pool before water is 
    introduced to the cask during the unloading process.
    ---------------------------------------------------------------------------
    
        \5\ Recent NRC staff guidance pertaining to the appropriate 
    content of technical specifications is provided in NUREG-1536, 
    ``Standard Review Plan for Dry Cask Storage Systems,'' published in 
    January 1997. Similar guidance is provided by NRC Regulatory Guide 
    3.61, ``Standard Format and Content for a Topical Safety Analysis 
    Report for a Spent Fuel Dry Storage Cask,'' issued in February 1989, 
    and NRC Regulatory Guide 3.48, ``Standard Format and Content for the 
    Safety Analysis Report for an Independent Spent Fuel Storage 
    Installation (Dry Storage),'' issued in October 1981.
    ---------------------------------------------------------------------------
    
        As the staff explained in DD-97-18, the absence of specific 
    requirements in the TS to control the unloading process does not 
    diminish the importance that the NRC staff places on this activity. 
    Likewise, specific requirements for performing routine maintenance 
    activities and possible activities during decommissioning, although 
    important, are not prescribed in the TS. The TS do, however, contain 
    requirements for monitoring the integrity of the metallic seals and 
    actions to be taken in the event that the pressure-monitoring system 
    indicates a potential loss of the inert atmosphere within the cask. The 
    NRC staff believes that other regulatory requirements offer an 
    equivalent level of protection to the Petitioner's request to include 
    specific requirements in the TS to control the maintenance and 
    unloading of TN-40 casks and the eventual decommissioning of the ISFSI. 
    The administrative controls in the TS for the Prairie Island ISFSI 
    require that the associated procedures be prepared, reviewed, and 
    maintained in accordance with the requirements of the Prairie Island 
    Nuclear Generating Plant facility operating licenses and associated TS. 
    In addition, under existing NRC requirements, the licensee must 
    adequately implement procedures to control loading, maintaining, and 
    unloading of dry-storage casks (see 10 CFR 72.122, 10 CFR 72.150, and 
    10 CFR 72.152). For example, as indicated in the NRC inspection 
    documented in Inspection Report 50-282/95002; 50-306/95002; 72-10/
    95002(DRP), and the resulting notice of violation to the licensee, 
    NRC's requirements in Criterion V of Appendix B to 10 CFR Part 50 
    already require the incorporation of appropriate steps and precautions 
    into the original procedure developed to control unloading of a TN-40 
    cask. Thus, as demonstrated by the example, no changes to the TS or the 
    SAR are needed to ensure that enforceable requirements for operating 
    controls and limits are in place to address the unloading of a cask.
        Given that the unloading procedure or a similar procedure can be 
    used during maintenance activities for the repair or replacement of 
    seals or during the decommissioning of the Prairie Island ISFSI, no 
    changes to the TS or the SAR are needed to ensure that enforceable 
    requirements for operating controls and limits are in place to address 
    the unloading of the cask for these specific purposes.
    
    Item 12. If Necessary, Order the Licensee to Build a Facility for Dry 
    Transfer of Spent Fuel Assemblies
    
        The Petitioner requests that the NRC review the licensee's 
    processes and procedures for maintenance, unloading, and 
    decommissioning, and if the licensee does not possess a capability to 
    unload casks, order the licensee to build a ``hot shop'' for air 
    unloading of casks and transfer of the fuel. Given that the staff has 
    performed the level of reviews and inspections it feels are warranted 
    and has found that the licensee could safely unload a TN-40 cask using 
    the spent fuel pool, it is not necessary to order the licensee to build 
    a facility to support the transfer of fuel assemblies under dry 
    conditions.6
    ---------------------------------------------------------------------------
    
        \6\ However, as noted in response to Item 5, the licensee may 
    elect to transfer fuel assemblies under dry conditions if a dry-
    transfer system is developed and receives appropriate NRC approval.
    ---------------------------------------------------------------------------
    
    IV. Conclusion
    
        For the reasons described above, the NRC has determined that no 
    adequate basis exists for granting the Petitioner's request for 
    suspension of Northern States Power Company's license for dry-cask 
    storage of spent nuclear fuel at Prairie Island or for taking the other 
    actions requested by the Petitioner.
        A copy of this decision will be filed with the Secretary of the 
    Commission for the Commission to review in accordance with 10 CFR 
    2.206(c).
        As provided by this regulation, this decision will constitute the 
    final action of the Commission 25 days after issuance, unless the 
    Commission, on its own motion, institutes a review of the decision 
    within that time.
    
        Dated at Rockville, Maryland, this 11th day of February 1998.
    
        For the Nuclear Regulatory Commission.
    Samuel J. Collins,
    Director.
    [FR Doc. 98-4324 Filed 2-19-98; 8:45 am]
    BILLING CODE 7690-01-P
    
    
    

Document Information

Published:
02/20/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
98-4324
Pages:
8703-8710 (8 pages)
Docket Numbers:
Docket Nos. 50-282, 50-306 and 72-10
PDF File:
98-4324.pdf