[Federal Register Volume 60, Number 37 (Friday, February 24, 1995)]
[Notices]
[Page 10383]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-4505]
[[Page 10383]]
DEPARTMENT OF ENERGY
[Docket No. RP91-138-004]
Florida Gas Transmission Company; Notice of Revised Pro Forma
Tariff Sheets
February 17, 1995.
Take notice that on February 10, 1995, Florida Gas Transmission
Company (FGT) tendered for filing the following revised pro forma
tariff sheets in response to the Commission's Order dated January 12,
1995 in the captioned dockets:
Pro Forma Sheet No. 121
Pro Forma Sheet No. 121A
Pro Forma Sheet No. 144
Pro Forma Sheet No. 145
Pro Forma Sheet No. 146
On September 1, 1994, FGT, along with numerous of its customers,
filed as part of a Stipulation and Agreement of Settlement (``September
1 Settlement'') in Docket No. RS92-16-009, pro forma tariff sheets
designed to implement the terms and conditions of a new capacity
curtailment plan. On January 12, 1995, the Commission issued an Order
(``January 12 Order'') which, among other things, accepted and
clarified the September 1, Settlement and required FGT to make certain
changes relative to curtailment and curtailment-related scheduling
procedures. (The January 12 Order also required certain tariff
modifications regarding the release of segments of capacity which will
be filed under separate cover letter.) The Commission also determined
that certain scheduling issues that arose in Docket No. RP91-138-000
had been resolved by the intervening actions taken by the Commission in
FGT's Order No. 636 restructuring proceeding, and directed FGT to
clarify its scheduling procedures to provide certain protections for
Exempt Uses (as defined in the September 1 Settlement) consistent with
those provided in the new curtailment plan.
Specifically, FGT was required to: (i) Include in its scheduling
provisions a limited exemption from pro rata scheduling for Exempt
Uses, so as to correspond with the protections from pro rata
curtailment provided in the new curtailment plan for such uses; (ii)
provide that service serving Priority 2 Uses will be curtailed before
any curtailment of service serving Priority 1 Uses; (iii) remove
references to FERC's participation on the Data Verification Committee;
and (iv) remove the proposal that a maximum rate of 125% of FGT's
highest authorized rate for firm transportation service would be
available for relinquishments made during periods of diminished
capacity expected to extend for a period exceeding five (5) days. The
Commission also required that the new curtailment plan, as modified
under the January 12 Order, be implemented by November 1, 1995. The
Commission directed FGT to file revised pro forma tariff sheets
conforming to the requirements of its January 12 Order within thirty
(30) days. In the instant filing, FGT states that it is complying with
the January 12 Order. (FGT states that it will file appropriately
numbered tariff sheets prior to the November 1, 1995 implementation.)
Any person desiring to protest said filing should file a protest
with the Federal Energy Regulatory Commission, 825 North Capital
Street, NE., Washington, DC 20426, in accordance with Sec. 385.211 of
the Commission's Rules and Regulations. All such protests should be
filed on or before February 27, 1995. Protests will be considered by
the Commission in determining the appropriate actions to be taken, but
will not serve to make protestants parties to the proceedings. Copies
of this filing are on file with the Commission and are available for
public inspections.
Lois D. Cashell,
Secretary.
[FR Doc. 95-4505 Filed 2-23-95; 8:45 am]