    CEMS Demonstration Announcement
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Notice of request for proposals.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Office of Solid Waste, U.S. Environmental Protection 
    Agency, plans to conduct a demonstration of particulate matter (PM) and 
    total mercury (Hg) Continuous Emissions Monitoring Systems (CEMS) for 
    stack monitoring of hazardous waste combustors (e.g., incinerators, 
    cement kilns, and light-weight aggregate kilns that burn hazardous 
    waste). The purpose of this notice is to solicit proposals from vendors 
    that are interested in participating in the demonstration. EPA will 
    select vendors to participate in the demonstration based on specified 
    evaluation criteria.
    
    DATES: Proposals must be submitted by May 7, 1996.
    
    ADDRESSES: Vendors must submit an original and two copies of their 
    proposal to H. Scott Rauenzahn, U.S. Environmental Protection Agency, 
    401 M Street, SW (5302W), Washington, DC 20460.
    
    FOR FURTHER INFORMATION CONTACT: For information on this request for 
    proposals, contact H. Scott Rauenzahn in the Office of Solid Waste at 
    703-308-8477 (FAX: 703-308-8433).
    
    SUPPLEMENTARY INFORMATION: EPA plans to conduct a demonstration to 
    determine whether PM and total Hg CEMS are sufficiently developed for 
    use to document compliance with emission standards for hazardous waste 
    combustors. The demonstration has two phases: (1) demonstration of 
    ability to comply with the Agency's draft performance specifications; 
    and (2) demonstration of long term endurance over a period of six 
    months to one year.
    
    I. CEMS Performance Specifications
    
        The Agency's draft performance specifications contain requirements 
    for: a one-week test period for calibration and zero drift; relative 
    accuracy assessment against EPA manual reference methods; a calibration 
    error check (if applicable); an interference test (if applicable); and 
    demonstration to the EPA that other requirements, such as response time 
    and data recorder scale, are met. The draft specifications are 
    available on EPA's Technology Transfer Network (TTN). The files are 
    PM--PS.ZIP for PM and HG--PS.ZIP for Hg. They can be found in the 
    Emission Measurement Technical Information (EMTIC) bulletin board's 
    ``Continuous Emissions Monitoring'' area.
        The dial-in number for the TTN BBS is (919) 541-5742. That number 
    can accommodate 14.4k kbps. Settings are 8 (Data), No parity, 1 (Stop), 
    and Full duplex. The BBS can be reached on the internet via TELNET at 
    ``ttnbbs.rtpnc.epa.gov''. The system is off-line Mondays from 8 am 
    until 12 noon ET. For help using the BBS, dial (919) 541-5384.
        In addition, the draft performance specifications are available in 
    the EPA RCRA Docket, Docket number F-96-RCSP-FFFFF. The docket is 
    located at U.S. Environmental Protection Agency, Crystal Gateway, First 
    Floor, 1235 Jefferson Davis Highway, Arlington, Virginia. The RCRA 
    Docket is open from 9 a.m. to 4 p.m. Monday through Friday, except for 
    Federal holidays. The public must make an appointment to review docket 
    materials by calling 703-603-9230. The public may copy a maximum of 100 
    pages from any document at no cost. Additional copies cost $0.15 per 
    page.
    
    II. Description of the Demonstration
    
        EPA seeks vendors to participate in the demonstration that will 
    supply, install, and operate the CEMS at no charge to the government. 
    The Agency will select participants based on their proposals according 
    to the selection criteria discussed below. The test site(s) will be 
    selected by EPA. EPA will also provide site coordination and oversight, 
    and will conduct the manual method reference measurements.
        The vendors will conduct the demonstration under EPA oversight, and 
    will provide to EPA at no charge and before removing the CEMS from the 
    test site all data and information on the design of the CEMS and its 
    operation and maintenance during the demonstration. EPA will present 
    the results of the demonstration in a report.
        At least one CEMS of each type (PM and total Hg) that participates 
    in the demonstration will be selected for a long term (e.g., 6-12 
    month) endurance test.
        The testing is scheduled to start in May 1996.
    
    III. Vendor Proposals
    
        Proposals should contain the following: a detailed description of 
    the design, operation, and maintenance of the CEMS; the performance 
    specifications of the device (including calibration and zero drift, 
    detection limits, range, and accuracy); a detailed description of the 
    calibration procedure(s) and standards; vendor generated test data 
    pertinent to CEMS performance and calibration; field data demonstrating 
    performance; a description of how the vendor will meet the 
    responsibilities of supplying, installing, and operating the CEMS; and 
    a statement that the vendor accepts the conditions of the program as 
    presented in this notice.
        EPA will select vendors for participation in the demonstration 
    using the criteria presented below. Vendors selected after a 
    preliminary selection must submit a site-specific installation plan 
    based on site-specific information that the Agency will provide. This 
    plan should include details such as: (1) the strategy to be used for 
    handling the problem of liquid aerosol if the site uses 
    
    [[Page 7233]]
    a low temperature, wet air pollution control system; or (2) how 
    adequate purge air and temperature would be maintained to prevent 
    fouling of the optics or optical access, if applicable. In other words, 
    the site-specific installation plan should describe all measures that 
    would be taken to ensure compliance with the performance specifications 
    if the site itself bought the CEMS.
        EPA will review the site-specific installation plans and make a 
    final selection of participants.
    
    IV. Selection Criteria
    
        EPA will use the following selection criteria as guidelines for 
    choosing CEMSs to participate in the demonstration and endurance tests. 
    Each CEMS will be scored on a scale of 1 to 10 on each criterion (10 
    being the best score), and a total score calculated using the weighting 
    factors indicated in brackets. Starting from the highest scoring CEMS 
    and working down, as many CEMSs will be selected for participation as 
    possible commensurate with the resources available and the capacity of 
    the test site to accommodate additional CEMSs.
        A prerequisite for consideration is that a CEMS must be able to 
    monitor PM or Hg continuously and record measurements over the 
    specified averaging periods. For this effort, EPA defines a CEMS as 
    sampling the stack gas continuously and making measurements every 15 
    seconds. One minute block averages are calculated by averaging the four 
    previous 15-second readings. Rolling averages are then calculated every 
    minute using all one-minute averages obtained during the averaging 
    period. The averaging periods are 10-minute, one-hour (60 minutes), and 
    2-hours (120 minutes) for PM, and 10 hours (600 minutes) for Hg. Only 
    CEMSs that have a data availability factor of at least 90% 1 will 
    be considered, unless no CEMSs can perform at that level.
    
        \1\ Since a source would not be allowed to burn hazardous waste 
    if the CEMS is not measuring and recording data, the CEMS must have 
    a high data availability factor.
    ---------------------------------------------------------------------------
    
    Phase I: Selection Criteria for the Demonstration Test
    
        (1) Commercial Availability. The CEMS should be commercially 
    available as documented by product literature, a list of installation 
    locations, and references. A CEMS that has been installed and 
    successfully field demonstrated to meet performance specifications 
    similar to those referenced here at more than 100 stacks will receive 
    the highest score. One that is available as a prototype only, with no 
    firm commercialization plans in place that would lead to availability 
    within the year, will receive the lowest score. [25%]
        (2) Vendor Support. The CEMS should be provided, installed, and 
    operated by the vendor at no charge to the government. It is expected 
    that the vendor will have personnel on-site to run the CEMS, carry out 
    CD and ZD checks if needed, perform the CE check (if applicable), 
    monitor CEMS performance during RA testing, and provide any trouble 
    shooting or maintenance that may be required. It is also expected that 
    all data will be recorded and copies provided to EPA at the test site 
    and at no charge: CD and ZD checks (if automatic adjustments are made 
    the CD or ZD before adjustment or the amount of adjustment must be 
    recorded), CE tests, RA tests, and interference checks. Willingness to 
    guarantee all of the above will receive the highest score, none of the 
    above the lowest score. [25%]
        (3) Potential for CEMS to Meet Performance Specifications. 
    Documentation supplied by the vendor in the proposal should provide an 
    indication that the CEMS can be expected to: (1) meet the performance 
    specifications for CD, ZD, CE, RA, interferences, recorder scale, and 
    response time; and (2) meet detection limits of less than 7.0 mg/dscm 
    for PM and 5.0 g/dscm for Hg. Recorder scale (and span) should 
    be greater than or equal to 210 mg/dscm and 1400 g/dscm 
    respectively for PM and Hg. The response time, the time interval 
    between the start of a step change in the system input and the time 
    when the data recorder displays 95 percent of the final stable value, 
    should not exceed 2 minutes. Ability to meet all of the specifications 
    will receive the highest score, ability to meet none of the 
    specifications will receive the lowest score. [35%]
        (4) Other Performance Requirements. The CEMS design (as evaluated 
    from information supplied in the proposal pertaining to a description 
    of the CEMS and measurement principle and/or supplied test data) should 
    be appropriate relative to the requirements of the performance 
    specification and the application to monitoring stack emissions from 
    hazardous waste combustors (i.e., hazardous waste incinerators and 
    hazardous waste burning cement and light-weight aggregate kilns). For 
    PM CEMSs, this means:
        (a) The CEMS should be maximally sensitive to PM in the 0.1 to 10 
     size range; and
        (b) The CEMS should not be sensitive to liquid water aerosol.
        For Hg CEMS this means:
        (a) The CEMS vendor must have demonstrated, at a minimum, the 
    ability of the CEMS to detect vapor phase Hg, Hg on PM, and HgCl 
    2, and report the sum of these concentrations as total Hg; and
        (b) No interferences (see performance specification). [15%]
        Modifications to Installation Plan. Vendors that the Agency selects 
    based on the criteria discussed above for participation in the 
    demonstration test must submit an installation plan. The proposed 
    installation described in the plan must be appropriate relative to the 
    requirements of the performance specification and the application to 
    monitoring stack emissions from the hazardous waste combustor that the 
    Agency specifies. In particular, factors such as flue gas conditions 
    (whether it is a saturated low temperature stream, for example) and 
    purge requirements (flow rate and temperature to ensure that optics and 
    access are not fouled) must be taken into account in the installation 
    plan. If EPA determines that the proposed installation plan is not 
    appropriate, the vendor may be required to revise the plan. If the 
    vendor is unwilling to make the necessary changes, the CEMS may be 
    dropped from the test program.
    
    Phase II: Selection Criteria for the Endurance Test
    
        The Agency will select CEMSs for participation in the long-term 
    endurance test based on: (1) performance of the CEMS during the 
    demonstration test in terms of ability to meet the performance 
    specifications [75%]; and (2) maintenance requirements based on vendor 
    information and experience gained during the demonstration test [25%].
    
    V. Disclaimer
    
        Neither acceptance by EPA for participation in this demonstration 
    nor successful completion of the demonstration shall guarantee that EPA 
    or any other federal agency or government entity shall accept any 
    instrument, or related procedure or technology, or any portion thereof, 
    for the purpose of the measurement of emissions from any regulated 
    facility.
    
        Dated: February 1, 1996.
    Elizabeth A. Cotsworth,
    Acting Director, Office of Solid Waste.
    [FR Doc. 96-4388 Filed 2-26-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    

Document Information

Published:
02/27/1996
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Notice of request for proposals.
Document Number:
96-4388
Dates:
Proposals must be submitted by May 7, 1996.
Pages:
7232-7233 (2 pages)