    DEPARTMENT OF DEFENSE
    
    Corps of Engineers
    
    
    Intent To Prepare a Draft Environmental Impact Statement (DEIS) 
    for the Central and Southern Florida Project for Flood Control and 
    Other Purposes, Part V, Coastal Areas South of St. Lucie Canal, Design 
    Memorandum, Canal 51--West End, Control Structure 155A, Pumping Station 
    319 and Stormwater Treatment Area 1 East, Palm Beach County, Florida
    
    AGENCY: U.S. Army Corps of Engineers, DoD.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Jacksonville District, U.S. Army Corps of Engineers, along 
    with the South Florida Water Management District (SFWMD) intends to 
    prepare a Draft Environmental Impact Statement (DEIS) on the 
    feasibility of implementing under the State of Florida's Everglades 
    Forever Act of 1994, the Canal 51--West End, Control Structure 155A, 
    Pumping Station 319 and Stormwater Treatment Area 1 East, Palm Beach 
    County, Florida.
    
    FOR FURTHER INFORMATION CONTACT:
    Questions about the proposed action and draft EIS can be answered by: 
    William Porter, U.S. Army Engineer District, PO Box 4970, Jacksonville, 
    Florida 32232-0019; Telephone 904-232-2259.
    
    SUPPLEMENTARY INFORMATION: a. The scope of this study is to evaluate 
    implementation of the C-51, West End flood control project. The West 
    Palm Beach Canal (C-51) is a component of the Central and Southern 
    Florida (C&SF) Flood Control Project. The C-51 basin is located in Palm 
    Beach County and extends from the edge of Water Conservation Area (WCA-
    1) on the West to Lake Worth on the east near the southerly limits of 
    the city of West Palm Beach. The C-51 project will provide flood 
    control for the lower 21 miles of the existing West Palm Beach Canal 
    and 145 square miles of Palm Beach County. Project works for the east 
    end of C-51 have been completed. All engineering and design work for 
    the west end was previously discontinued at the request of the local 
    sponsor pending the development of a mediated plan for resolution of 
    the Everglades litigation. The Everglades Construction Project, a 
    product of the Technical Mediated Plan (TMP), incorporates a 
    substantially modified version of the Federal C-51 project. The TMP 
    consists of modifications to the water management system in the 
    Everglades Agricultural Area (EAA) and includes construction of six 
    large Stormwater Treatment Areas (STAs) to filter nutrients from 
    agricultural runoff before discharges are made to the Everglades. The 
    TMP also alters the C-51 West project to include a Stormwater Treatment 
    Area.
        The locally preferred plan to be evaluated has many of the same 
    physical features proposed in the 1992 Detail Design Memorandum (DDM) 
    and are described below. The project will provide 10-year flood 
    protection for the western basin of C-51. The major physical difference 
    between the 1992 DDM plan and the recommended plan is the replacement 
    of the 1,600-acre detention area with the 5,350-acre ``locally 
    preferred'' STA 1 East. The most significant modification will be the 
    reduction of discharges to Lake Worth, with C-51 West Basin runoff 
    directed instead to Water Conservation Area 1 (The Arthur R. Marshall 
    Loxahatchee National Wildlife Refuge). Runoff from the C-51 West Basin 
    will pass through STA 1E for water quality improvement prior to its 
    discharge to Water Conservation Area 1. In addition to the flood damage 
    reduction benefits provided by the 1992 plan, the modified plan will 
    provide water quality improvement, reduction of damaging freshwater 
    discharges to Lake Worth, and increased water supply for the Everglades 
    and other users.
        Physical Data on Project Features is as follows: (1) Stormwater 
    Treatment Area 1 East, with an effective treatment area of 5,350 acres, 
    will be constructed in lieu of the 1,600-acre detention area provided 
    for in the 1992 DDM. Inflows to this area will be delivered by Pump 
    Station 319. Treated discharges will be lifted to WCA-1 by a new 
    outflow pumping station built as part of the Stormwater Treatment Area, 
    (2) Pump Station 319 will be relocated to a point about 1.7 miles east 
    of the presently planned location. The capacity of the pump station 
    will remain about the same, however, the static head differential 
    across the pump station will be reduced as a result of the replacement 
    of the 1,600-acre detention area with STA 1E, (3) Structure S-155A will 
    be constructed in C-51 with a capacity of 1,000 cubic feet per second, 
    (4) C-51 Canal enlargements will be required over a distance of about 
    4.3 [[Page 20482]] miles between Structure 155A and Pump Station 319.
        Environmental Quality: The Technical Mediated Plan will preserve 
    the same flood control benefits that justify the original Corps 
    project. The recommended plan will serve other purposes as well: 
    provide additional water supply for the Everglades (and other urban and 
    environmental users) and provide a filtering area to remove excessive 
    nutrients from agricultural runoff before it is discharged into the 
    Everglades. As an incidental, but important benefit, the plan will also 
    reduce harmful freshwater discharges into Lake Worth at the eastern 
    terminus of C-51.
        b. Scoping: The scoping process as outlined by the Council on 
    Environmental Quality will be utilized to involve Federal, State, and 
    local agencies; and other interested persons and organizations. A 
    scoping letter will be sent to interested Federal, State, and local 
    agencies requesting their comments and concerns regarding issues they 
    feel should be addressed in the EIS. Interested persons and 
    organizations wishing to participate in the scoping process should 
    contact the Corps of Engineers at the address above. Significant issues 
    anticipated include concern for: local groundwater recharge, water 
    quality, water supply, recreation, wetlands, fish and wildlife, and 
    land use. Public scoping meetings will be held in the near future, the 
    exact location, dates, and times will be announced in public notices 
    and local newspapers.
        c. It is estimated that the DEIS will be available to the public in 
    March 1996.
    Gregory D. Showalter,
    Army Federal Register Liaison Officer.
    [FR Doc. 95-10193 Filed 4-25-95; 8:45 am]
    BILLING CODE 3710-AJ-M
    
    

Document Information

Published:
04/26/1995
Department:
Engineers Corps
Entry Type:
Notice
Action:
Notice of intent.
Document Number:
95-10193
Pages:
20481-20482 (2 pages)
PDF File:
95-10193.pdf