95-11478. Public Information Collection Requirements Submitted to OMB for Review  

  • [Federal Register Volume 60, Number 90 (Wednesday, May 10, 1995)]
    [Notices]
    [Page 24864]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-11478]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    FEDERAL EMERGENCY MANAGEMENT AGENCY
    
    
    Public Information Collection Requirements Submitted to OMB for 
    Review
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted 
    to the Office of Management and Budget the following public information 
    collection requirements for review and clearance in accordance with the 
    Paperwork Reduction Act of 1980, 44 U.S.C. chapter 35.
    
    DATES: Comments on this information collection must be submitted on or 
    before July 10, 1995.
    
    ADDRESSES: Direct comments regarding the burden estimate or any aspect 
    of this information collection, including suggestions for reducing this 
    burden, to: the FEMA Information Collections Clearance Officer at the 
    address below; and to Donald Arbuckle, Office of Management and Budget, 
    3235 New Executive Office Building, Washington, DC 20503, (202) 395-
    7340, within 60 days of this notice.
    
    FOR FURTHER INFORMATION CONTACT:
    Copies of the above information collection request and supporting 
    documentation can be obtained by calling or writing Muriel B. Anderson, 
    FEMA Information Collections Clearance Officer, Federal Emergency 
    Management Agency, 500 C Street, SW., Washington, DC 20472, (202) 646-
    2624.
        Type: Extension of 3067-0250.
        Title: Electromagnetic Pulse Protection Inspection and Maintenance 
    Procedures.
        Abstract: FEMA manages an Electromagnetic Protection Pulse program 
    which provides for the protection of communications facilities against 
    electromagnetic pulse resulting from high altitude nuclear detonation 
    or from environmental disturbances such as lightning and power line 
    transients. Inspections of electrical and electronic devices and other 
    material are performed at periodic intervals as established in the 
    facility's EMP Inspection and Maintenance Plan. Formal inspections are 
    mandatory and are performed on an annual basis, informal inspections 
    occur in conjunction with a significant event, such as recurring 
    systems upsets, electrical storms, etc., and occasional inspections are 
    performed periodically to locate degradation or other problems that 
    occur between other types of inspections. The checklist is used to 
    document and report on these inspection activities. If the checklist 
    shows that EMP protection devices and materials are defective or 
    inoperative and need to be removed, the Regional EMP Program Managers 
    will use the information to replace those devices and materials.
        Type of Respondents: Business or other for-profit; Federal 
    Government; and State, Local or Tribal Government.
        Estimate of Total Annual Reporting and Recordkeeping Burden: 2,472 
    hours.
        Number of Respondents: 375.
        Estimated Average Burden Time per Response: 6.6 hours.
        Frequency of Response: Annually, on occasion.
    
        Dated: May 1, 1995.
    Wesley C. Moore,
    Director, Program Services Division, Operations Support Directorate.
    [FR Doc. 95-11478 Filed 5-9-95; 8:45 am]
    BILLING CODE 6718-01-M
    
    

Document Information

Published:
05/10/1995
Department:
Federal Emergency Management Agency
Entry Type:
Notice
Action:
Notice.
Document Number:
95-11478
Dates:
Comments on this information collection must be submitted on or before July 10, 1995.
Pages:
24864-24864 (1 pages)
PDF File:
95-11478.pdf