DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP96-520-000]
Columbia Gas Transmission Corporation; Notice of Application
May 16, 1996.
Take notice that on May 13, 1996, Columbia Gas Transmission
Corporation (Columbia), 1700 MacCorkle Avenue, S.E., Charleston, West
Virginia 25314-1599, filed in Docket No. CP96-520-000 an application
pursuant to Section 7(c) of the Natural Gas Act for a certificate of
public convenience and necessity pursuant to Section 157.7 of the
Commission's regulations, as well as a temporary certificate pursuant
to Section 157.17 of the Commission's regulations, authorizing the
increase in compressor station horsepower, all as more fully set forth
in the application which is on file with the Commission and open to
public inspection.
Columbia requests authorization to increase the horsepower at its
Hellertown Compressor Station, located in Northampton County,
Pennsylvania, from 917 to 1100 horsepower (hp) per unit, for a total of
2200 hp, and incremental increase of 366 hp. It is stated that to
accommodate the proposed increase in horsepower, Columbia must also
replace the existing, appurtenant eight 8-inch diameter compressor
cylinders with eight 8\1/2\-inch diameter compressor cylinders, and
provide sound attenuation to ensure reliability of service to its
customers.
Columbia requests a temporary certificate to allow it to continue
operation of its Hellertown Compressor Station at the higher horsepower
level until the Commission issues a permanent certificate. It is stated
that, due to a pipeline rupture on January 6, 1996, Columbia's Line
1278 was repaired and the operating pressure was decreased from 1200
psig to 1080 psig, pending remedial work to restore the operation
integrity of the pipeline. Columbia contends that the decreased
operating pressure created a shortage of
[[Page 25658]]
facility capacity to serve Columbia's customers in the New York area.
According to Columbia, it became necessary to operate the Hellertown
Compressor Station at the higher horsepower to ensure continued service
to customers in the New York area on an emergency basis. Columbia
states that it has operated in this mode since January 13, 1996, and
that its extended terms for emergency service will expire on May 13,
1996. Columbia estimates that the Line 1278 operating pressure will not
be restored until November 1997, based on a remediation plan agreed to
by Columbia, in consultation with the Department of Transportation. It
is stated that Columbia must therefore continue supplementing
deliveries to its New York customers through the Hellertown Compressor
Station. Therefore, a temporary certificate is required to continue
this level of service. Columbia states that the permanent certificate
and subsequent appurtenant compressor facility upgrades will allow
Columbia to better serve all of its customers over a wider operating
range, thus enhancing the flexibility of providing service to its New
York customers.
Columbia states that it does not request authorization for any new
or additional service. It is stated that the proposed horsepower
increase is necessary to provide reliable service to all of Columbia's
New York area customers. Columbia estimates the cost of the appurtenant
facility upgrades at $860,000. It is stated that no additional costs
are required to achieve the 1100 hp rating per unit, since each unit
was derated originally.
Any person desiring to be heard or to make any protest with
reference to said application should on or before May 28, 1996, file
with the Federal Energy Regulatory Commission, Washington, D.C. 20426,
a motion to intervene or a protest in accordance with the requirements
of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).
All protests filed with the Commission will be considered by it in
determining the appropriate action to be taken but will not serve to
make the protestants parties to the proceeding. Any person wishing to
become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that pursuant to the authority contained in and
subject to jurisdiction conferred upon the Federal Energy Regulatory
Commission by Sections 7 and 15 of the Natural Gas Act and the
Commission's Rules of Practice and Procedure, a hearing will be held
with further notice before the Commission or its designee on this
application if no motion to intervene is filed within the time required
herein, if the Commission on its own review of the matter finds that a
grant of the certificate is required by the public convenience and
necessity. If a motion for leave to intervene is timely filed, or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Columbia to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 96-12789 Filed 5-21-96; 8:45 am]