E6-9392. Alcoa Power Generating, Inc.; Errata Notice and Revised Schedule  

  • Start Preamble June 9, 2006.

    On May 10, 2006 the Commission issued a “Notice of Application Tendered for Filing” in the above-referenced proceeding. This Errata makes the following corrections to the notice:

    (1) Under letter n., paragraph 4, item (8), the number, “447,150 kW,” should be replaced with the number, “107,780 kW,” to report the total installed capacity of the Narrows Development.

    (2) Under letter n., paragraph 6, the last sentence should be replaced with the following sentences: “According to a 1968 Headwaters Benefits Settlement, APGI is to operate High Rock Reservoir such that regulated weekly average stream flow would be reduced to a flow not less than 1,500 cfs during the ten week period preceding May 15; 1,610 cfs during the period May 15 through July 1; and 1,400 cfs during the period July 1 through September 15. During the 2002 drought, APGI and Progress Energy agreed, in a regional Emergency Drought Management Protocol (now expired), to operate the projects so as to achieve a daily average flow of 900 cfs at the Rockingham, North Carolina U.S. Geological Survey gage.”

    (3) Under letter q. Procedural Schedule: The table is revised as follows:

    MilestoneTarget date
    Tendering NoticeMay 10, 2006.
    File Additional Study RequestsJune 26, 2006.
    Additional Information Requests (if necessary)July 2006.
    Issue Acceptance Letter and Solicit InterventionsOct. 2006.
    Issue Scoping Document 1 for CommentsNov. 2006.
    Hold Scoping MeetingsJan. 2006.
    Request Additional Information (if necessary)March 2007.
    Issue Scoping Document 2 (if necessary)March 2007.
    Notice of Application Ready for Environmental AnalysisApril 2007.
    Filing of Recommendations, Preliminary Terms and Conditions, and Fishway PrescriptionsJune 2007.
    Notice of Availability of Draft EA or EISSept. 2007.
    Comments on Draft EA or EIS and Modified Terms and ConditionsNov. 2007.
    Notice of Availability of Final EA or EISMarch 2008.
    Ready for Commission Decision on the ApplicationApril 2008.
    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. E6-9392 Filed 6-15-06; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
06/16/2006
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E6-9392
Pages:
34902-34902 (1 pages)
Docket Numbers:
Project No. P-2197-073
EOCitation:
of 2006-06-09
PDF File:
e6-9392.pdf