Start Preamble
June 9, 2006.
On May 10, 2006 the Commission issued a “Notice of Application Tendered for Filing” regarding the above-referenced proceeding. This Errata makes the following correction to the notice:
(1) Under letter n., paragraph 4, the last sentence should be replaced by the following sentence: “During the 2002 drought, Progress Energy and APGI agreed, in a regional Emergency Drought Management Protocol (now expired), to operate the projects so as to achieve a daily average flow of 900 cfs at the Rockingham, North Carolina U.S. Geological Survey gage.”
(2) Under letter q. Procedural Schedule: The table is revised as follows:
Start SignatureMilestone Target date Tendering Notice May 10, 2006. File Additional Study Requests June 26, 2006. Additional Information Requests (if necessary) July 2006. Issue Acceptance Letter and Solicit Interventions October 2006. Issue Scoping Document 1 for Comments November 2006. Hold Scoping Meetings January 2006. Request Additional Information (if necessary) March 2007. Issue Scoping Document 2 (if necessary) March 2007. Notice of Application Ready for Environmental Analysis April 2007. Filing of Recommendations, Preliminary Terms and Conditions, and Fishway Prescriptions June 2007. Notice of Availability of Draft EA or EIS September 2007. Comments on Draft EA or EIS and Modified Terms and Conditions November 2007. Notice of Availability of Final EA or EIS March 2008. Ready for Commission Decision on the Application April 2008. Start Printed Page 34904End Signature End PreambleMagalie R. Salas,
Secretary.
[FR Doc. E6-9393 Filed 6-15-06; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 06/16/2006
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E6-9393
- Pages:
- 34903-34904 (2 pages)
- Docket Numbers:
- Project No. P-2206-030
- EOCitation:
- of 2006-06-09
- PDF File:
- e6-9393.pdf