95-14014. El Paso Natural Gas Co.; Notice of Request for Approval of Procedures  

  • [Federal Register Volume 60, Number 110 (Thursday, June 8, 1995)]
    [Notices]
    [Page 30295]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-14014]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP95-325-000]
    
    
    El Paso Natural Gas Co.; Notice of Request for Approval of 
    Procedures
    
    June 2, 1995.
        Take notice that on May 31, 1995, El Paso Natural Gas Company (El 
    Paso) submitted a Notice of Procedures for Implementation of Gas 
    Research Institute (GRI) crediting of 1994 GRI over-collections as a 
    result of the Federal Energy Regulatory Commission's May 3, 1995, order 
    issued at Docket No. RP95-124-001. El Paso requested that the 
    Commission approve this methodology so that El Paso can coordinate with 
    GRI to facilitate Releasing and Acquiring Shippers receiving any 
    applicable GRI collections which were assessed to such shippers for 
    capacity released at less than the maximum reservation charge(s) and 
    reservation surcharge(s).
        El Paso states that once the Commission approves this methodology, 
    El Paso will provide GRI with the necessary amounts in order to 
    facilities GRI's return to El Paso of all GRI collections which were 
    assessed to Releasing and Acquiring Shippers for capacity released at 
    less than the maximum rate, i.e., the discount exceeded the GRI 
    surcharge rate. El Paso states that it thereafter will immediately 
    flow-through these funds to all affected shippers.
        El Paso states that based on this methodology, GRI will refund and 
    El Paso will flow-through 1994 over-collections of $1,848,012.51 to all 
    affected shippers: $1,361,521.39 to Releasing Shippers and $486,491.12 
    to Acquiring Shippers.
        El Paso states that assuming the Commission approves El Paso's 
    proposed July 1, 1995, effective date for its concurrent tariff filing, 
    El Paso will cease GRI collections on the capacity release transactions 
    where the discount is greater than the GRI surcharge beginning with 
    July, 1995 business and calculate and flow-through 1995 over-
    collections through June 30, 1995 utilizing identical procedures as it 
    used for the 1994 over-collections.
        El Paso states that copies of the filing were served upon all 
    affected transportation customers of El Paso and interested state 
    regulatory commissions.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Sections 385.214 and 385.211 of the 
    Commission's Rules and Regulations. All such motions or protests should 
    be filed on or before June 9, 1995. Protests will be considered by the 
    Commission in determining the appropriate action to be taken, but will 
    not serve to make protestants parties to the proceeding. Any person 
    wishing to become a party must file a motion to intervene. Copies of 
    this filing are on file with the Commission and are available for 
    public inspection in the Public Reference Room.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-14014 Filed 6-7-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
06/08/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-14014
Pages:
30295-30295 (1 pages)
Docket Numbers:
Docket No. RP95-325-000
PDF File:
95-14014.pdf