96-19577. Northern States Power Company, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 149 (Thursday, August 1, 1996)]
    [Notices]
    [Pages 40214-40217]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-19577]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER95-1358-006, et al.]
    
    
    Northern States Power Company, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    July 26, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Northern States Power Company
    
    [Docket No. ER95-1358-006]
    
        Take notice that on July 15, 1996, Northern States Power Company 
    tendered for filing its compliance filing in the above-referenced 
    docket.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. United States Department of Energy--Bonneville Power 
    Administration
    
    [Docket Nos. EF96-2011-000 and EF96-2021-000]
    
        Take notice that the Bonneville Power Administration (BPA) on July 
    26, 1996, tendered for filing proposed rate adjustments for its 
    wholesale power and transmission rates pursuant to Section 7(a)(2) of 
    the Pacific Northwest Electric Power Planning and Conservation Act, 16 
    U.S.C. Sec. 839e(a)(2). BPA seeks interim approval of its proposed 
    rates effective October 1, 1996, pursuant to Commission Regulation 
    300.20, 18 CFR 300.20. Pursuant to Commission Regulation 300.21, 18 CFR 
    300.21, BPA seeks final confirmation of the proposed rates for the 
    periods set forth in this notice.
        BPA states that its wholesale power and transmission rates are 
    proposed to be modified. BPA further states that while market forces 
    have prompted BPA to lower its wholesale power rates, the resulting 
    loads are forecasted to increase revenues over the 5-year test period 
    by approximately $1826 million (excluding the residential exchange), 
    which represents an increase of approximately 20.7 percent. BPA's 
    transmission rates are designed to increase revenues from transmission-
    only business by $144 million over the test period, an increase of 16 
    percent. With these increases BPA's total test period revenues from its 
    power and transmission business lines (excluding the residential 
    exchange) will be approximately $11.7 billion.
        BPA requests approval effective October 1, 1996, through September 
    30, 2001, for the following proposed wholesale power rates: PF-96 
    Priority Firm Power Rate, NR-96 New Resource Firm Power Rate, IP-96 
    Industrial Firm Power Rate, IPG-96 Industrial Firm Power Rate, VI-96 
    Variable Industrial Rate, NF-96 Nonfirm Energy Rate, RP-96 Reserve 
    Power Rate, PS-96 Power Shortage Rate, and the APS-96 Ancillary 
    Products and Services Rate.
        In addition, for those preference customers taking service on a 
    billing month that does not coincide with the calendar month, BPA 
    requests extension of the PF-95 rate for one month to enable transition 
    from bundled rates for priority firm power to unbundled rates. Those 
    customers will be billed at the PF-96 rates starting with their first 
    billing period that begins after October 1, 1996. Those customers will 
    continue to be billed at the PF-96 rates through the billing period 
    starting in September 2001 so, for those customers only, BPA requests 
    approval of the PF-96 rate through October 30, 2001.
        BPA requests approval of the General Rate Schedule Provisions 
    (GRSPs), including the Impact Aid Methodology, associated with BPA's 
    power rates for the period October 1, 1996, through September 30, 2001. 
    The GRSPs will apply to both wholesale power rates and transmission 
    rates.
        BPA requests approval effective October 1, 1996, through September 
    30, 2006, for the FPS-96 Firm Power Products and Services Rate. BPA 
    states that this approval is necessary for it to compete and assure 
    cost recovery.
        BPA requests approval effective October 1, 1996, through September 
    30, 2001, for the following proposed transmission rate schedules: FPT-
    96.1 Formula Power Transmission, FPT-96.3 Formula Power Transmission, 
    IR-96 Integration of Resources, NT-96 Network Integration Transmission 
    Rate, NTP-96 Network Integration Transmission Rate, PTP-96 Point-to-
    Point Firm Transmission Rate, RNF-96 Reserved Nonfirm Transmission 
    Rate, ET-96 Energy Transmission, IS-96 Southern Intertie Transmission, 
    IM-96 Montana Intertie Transmission Rate, IE-96 Eastern Intertie 
    Transmission, TGT-965 Townsend-Garrison Transmission, MT-96 Market 
    Transmission, UFT-96 Use-of-Facilities Transmission, AF-96 Advance 
    Funding Rate. For those customers who, as noted above, will continue to 
    be billed at the PF-96 rates through the billing period starting in 
    September 2001, BPA requests approval of the NTP-96 rate through 
    October 30, 2001.
        Comment date: August 12, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Power Clearinghouse IGM, Inc., VTEC Energy Inc., Yankee Energy 
    Marketing Company, Yankee Energy Marketing Company, WPS Energy 
    Services, Inc., North American Power Brokers, Inc.
    
    [Docket No. ER95-914-005, Docket No. ER95-1439-003, Docket No. ER95-
    1855-003, Docket No. ER96-146-001, Docket No. ER96-146-002, Docket No. 
    ER96-1088-003, Docket No. ER96-1156-001 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for public inspection 
    and copying in the Commission's Public Reference Room:
        On July 22, 1996, Power Clearinghouse, Inc. filed certain 
    information as required by the Commission's May 11, 1995, order in 
    Docket No. ER95-914-000.
        On July 12, 1996, IGM, Inc. filed certain information as required 
    by the Commission's August 28, 1995, order in Docket No. ER95-1439-000.
        On July 11, 1996, VTEC Energy, Inc. filed certain information as 
    required by the Commission's November 6, 1995, order in Docket No. 
    ER95-1855-000.
        On July 18, 1996, Yankee Energy Marketing Company filed certain 
    information as required by the Commission's November 29, 1995, order in 
    Docket No. ER95-146-000.
        On July 18, 1996, Yankee Energy Marketing Company filed certain 
    information as required by the Commission's November 29, 1995, order in 
    Docket No. ER95-146-000.
        On July 15, 1996, WPS Energy Services, Inc. filed certain 
    information as required by the Commission's April 16, 1996, order in 
    Docket No. ER96-1088-000.
        On July 22, 1996, North American Power Brokers, Inc. filed certain 
    information as required by the Commission's April 16, 1996, order in 
    Docket No. ER96-1156-000.
    
    [[Page 40215]]
    
    4. National Gas & Electric L.P., Torco Energy Marketing, Inc., MG 
    Electric Power, Inc., Eclipse Energy Inc., Ashton Energy Corporation, 
    Energy Resource Marketing, Inc., Gulfstream Energy, LLC
    
    [Docket No. ER90-168-028, Docket No. ER92-429-009, Docket No. ER93-839-
    003, Docket No. ER94-1099-009, Docket No. ER94-1246-008, Docket No. 
    ER94-1580-007, Docket No. ER94-1597-007 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for public inspection 
    and copying in the Commission's Public Reference Room:
        On July 19, 1996, National Gas & Electric L.P. filed certain 
    information as required by the Commission's March 20, 1990, order in 
    Docket No. ER90-168-000.
        On July 15, 1996, Torco Energy Marketing, Inc. filed certain 
    information as required by the Commission's May 18, 1992, order in 
    Docket No. ER92-429-000.
        On July 18, 1996, MG Electric Power, Inc. filed certain information 
    as required by the Commission's October 19, 1993, order in Docket No. 
    ER93-839-000.
        On July 22, 1996, Eclipse Energy Inc. filed certain information as 
    required by the Commission's June 15, 1994, order in Docket No. ER94-
    1099-000.
        On July 22, 1996, Ashton Energy Corporation filed certain 
    information as required by the Commission's August 10, 1994, order in 
    Docket No. ER94-1246-000.
        On July 18, 1996, Energy Resource Marketing, Inc. filed certain 
    information as required by the Commission's September 30, 1994, order 
    in Docket No. ER94-1580-000.
        On July 19, 1996, Gulfstream Energy, LLC filed certain information 
    as required by the Commission's October 21, 1994, order in Docket No. 
    ER94-1597-000.
    
    5. Texas-Ohio Power Marketing, Inc., Petroleum Source & Systems Group, 
    SouthEastern Energy Resources, Inc., J. Anthony & Associates Ltd., K 
    Power Company, KN Marketing, Inc.
    
    [Docket No. ER94-1676-008], [Docket No. ER95-266-006], [Docket No. 
    ER95-385-006], [Docket No. ER95-784-000], [Docket No. ER95-792-004], 
    [Docket No. ER95-869-005] (not consolidated)
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for public inspection 
    and copying in the Commission's Public Reference Room:
        On July 18, 1996, Texas-Ohio Power Marketing, Inc. filed certain 
    information as required by the Commission's October 31, 1994, order in 
    Docket No. ER94-1676-000.
        On July 12, 1996, Petroleum Source & Systems Group filed certain 
    information as required by the Commission's January 18, 1995, order in 
    Docket No. ER95-266-000.
        On July 22, 1996, SouthEastern Energy Resources, Inc. filed certain 
    information as required by the Commission's February 24, 1995, order in 
    Docket No. ER95-385-000.
        On July 19, 1996, J. Anthony & Associates Ltd. filed certain 
    information as required by the Commission's May 31, 1995, order in 
    Docket No. ER95-784-000.
        On July 12, 1996, K Power Company filed certain information as 
    required by the Commission's June 19, 1995, order in Docket No. ER95-
    792-000.
        On July 19, 1996, KN Marketing, Inc. filed certain information as 
    required by the Commission's May 26, 1995, order in Docket No. ER95-
    869-000.
    
    6. Wisconsin Electric Power Company
    
    [Docket No. ER95-1474-001]
    
        Take notice that on July 19, 1996, Wisconsin Electric Power Company 
    tendered for filing its compliance filing in the above-referenced 
    docket pursuant to the Commission's order of June 13, 1996 in this 
    proceeding.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Midwest Energy, Inc.
    
    [Docket No. ER96-2278-000]
    
        Take notice that on July 12, 1996, Midwest Energy, Inc. tendered 
    for filing an amendment in the above-referenced docket.
        Comment date: August 7, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Western Resources, Inc.
    
    [Docket No. ER96-2407-000]
    
        Take notice that on July 15, 1996, Western Resources, Inc. on 
    behalf of Kansas Gas and Electric Company (KG&E), tendered for filing a 
    proposed change to its Federal Energy Regulatory Commission Electric 
    Service Schedule No. 182. KG&E states the purpose of the change is to 
    serve the City of Girard under Service Schedule SPP, Short-Term 
    Participation Power Service effective July 1, 1996 through October 31, 
    1996.
        Copies of the filing were served upon the City of Girard and the 
    Kansas Corporation Commission.
        Comment date: August 7, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Illinois Power Company
    
    [Docket No. ER96-2461-000]
    
        Take notice that on July 18, 1996, Illinois Power Company (Illinois 
    Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for 
    filing firm and non-firm transmission agreements under which Southern 
    Company Services, Inc., solely as agent for Alabama Power Company, 
    Georgia Power Company, Mississippi Power Company, Gulf Power Company, 
    and Savannah Electric and Power Company, collectively known as Southern 
    Companies will take transmission service pursuant to its open access 
    transmission tariff. The agreements are based on the Form of Service 
    Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 1, 1996.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Illinois Power Company
    
    [Docket No. ER96-2462-000]
    
        Take notice that on July 18, 1996, Illinois Power Company (Illinois 
    Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for 
    filing firm and non-firm transmission agreements under which Pan Energy 
    Power Services, Inc., will take transmission service pursuant to its 
    open access transmission tariff. The agreements are based on the Form 
    of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 15, 1996.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company, The Potomac Edison Company and West Penn Power Company 
    (Allegheny Power
    
    [Docket No. ER96-2463-000]
    
        Take notice that on July 18, 1996, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Supplement 
    No. 12 to add seven (7) new Customers to the Standard Generation 
    Service Rate Schedule under which Allegheny Power offers standard 
    generation and emergency service on an hourly, daily, weekly, monthly 
    or yearly basis. Allegheny Power requests a waiver of notice 
    requirements to make
    
    [[Page 40216]]
    
    service available as of July 1, 1996, to PanEnergy Power Services, Inc. 
    and as of July 17, 1996, to AIG Trading Corporation, Commonwealth 
    Edison Company, Dayton Power and Light Company, Delhi Energy Services, 
    Inc., Niagara Mohawk Power Corporation, and Vastar Power Marketing, 
    Inc.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. New York State Electric & Gas Corporation
    
    [Docket No. ER96-2464-000]
    
        Take notice that on July 18, 1996, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing pursuant to 35.12 of the 
    Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
    18 CFR 35.12, as an initial rate schedule, an agreement with Delmarva 
    Power & Light Company (Delmarva). The agreement provides a mechanism 
    pursuant to which the parties can enter into separately scheduled 
    transmission under which NYSEG will sell to Delmarva and Delmarva will 
    purchase from NYSEG either capacity and associated energy or energy 
    only as the parties may mutually agree.
        NYSEG requests that the agreement become effective on July 19, 
    1996, so that the parties may, if mutually agreeable, enter into 
    separately scheduled transactions under the agreement. NYSEG has 
    requested waiver of the notice requirements for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and Delmarva.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Dartmouth Power Associates Limited Partnership
    
    [Docket No. ER96-2472-000]
    
        Take notice that on July 19, 1996, Dartmouth Power Associates 
    Limited Partnership, tendered for filing, pursuant to Rule 207 of the 
    Commission's Rules of Practice and Procedure, 18 CFR 385.207, proposed 
    changes in its FERC Electric Service Tariff No. 1 for sales to 
    Commonwealth Electric Company. The proposed changes would clarify the 
    interpretation of existing pricing provisions, allow short-term 
    purchases from other sellers, and provide for additional sales to 
    Commonwealth Electric Company during system emergency conditions.
        The proposed changes were agreed upon in order to avoid future 
    disputes and misunderstandings and to allow the mutually beneficial 
    transactions referenced above to occur.
        Copies of the filing were served upon Commonwealth Electric Company 
    and the Massachusetts Department of Public Utilities.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Portland General Electric Company
    
    [Docket No. ER96-2473-000]
    
        Take notice that on July 19, 1996, Portland General Electric 
    Company (PGE), tendered for filing a Revision No. 3 to Exhibit D of the 
    General Transfer Agreement between Bonneville Power Administration and 
    PGE (FERC Electric Service Tariff Volume No. 72).
        The BPA and PGE mutually agree to revise Exhibit D to the General 
    Transfer Agreement to reflect changes in transfer charges at the Canby 
    and Twilight Points of Delivery.
        Copies of the filing have been served on the parties included in 
    the filing letter.
        Pursuant to 18 CFR 35.11, PGE respectfully requests that the 
    Commission grant waiver of the notice requirements of 18 CFR 35.3 to 
    allow Revision No. 3 to Exhibit D of the GTA to become effective as of 
    August 1, 1996.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. The Montana Power Company
    
    [Docket No. ER96-2469-000]
    
        Take notice that on July 19, 1996, The Montana Power Company 
    (Montana), tendered for filing with the Federal Energy Regulatory 
    Commission pursuant to 18 CFR 35.13, Service Agreement with The 
    Utility-Trade Corp. and Duke/Louis Dreyfus L.L.C. under FERC Electric 
    Tariff, Second Revised Volume No. 1, a revised Index of Purchasers 
    under said Tariff, and Certificate of Concurrences from The Utility-
    Trade Corp. and Duke/Louis Dreyfus L.L.C.
        A copy of the filing was served upon The Utility-Trade Corp. and 
    Duke/Louis Dreyfus L.L.C.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Northeast Utilities Service Company
    
    [Docket No. ER96-2470-000]
    
        Take notice that on July 19, 1996, Northeast Utilities Service 
    Company (NUSCO), tendered for filing a Service Agreement with AIG 
    Trading Corporation (AIG) under the NU System Companies System Power 
    Sales/Exchange Tariff No. 6. On behalf of AIG, NUSCO has also filed a 
    Certificate of Concurrence.
        NUSCO states that a copy of this filing has been mailed to AIG.
        NUSCO requests that the Service Agreement become effective sixty 
    (60) days following the Commission's receipt of the filing.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. UtiliCorp United Inc.
    
    [Docket No. ER96-2471-000]
    
        Take notice that on July 19, 1996, UtiliCorp United Inc. 
    (UtiliCorp), tendered for filing a Contract dated July 12, 1996 (the 
    Contract) between UtiliCorp and the United States Department of Energy, 
    Western Area Power Administration (WAPA). Under the Contract, the 
    WestPlains Energy division of UtiliCorp will be interconnected with 
    WAPA at WAPA's Midway Substation in Colorado.
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Jersey Central Power & Light Company, Metropolitan Edison 
    Company, Pennsylvania Electric Company
    
    [Docket No. ER96-2465-000]
    
        Take notice that on July 18, 1996, GPU Service Corporation (GPU), 
    on behalf of Jersey Central Power & Light Company, Metropolitan Edison 
    Company and Pennsylvania Electric Company (jointly referred to as the 
    GPU Companies), filed a Service Agreement between GPU and PanEnergy 
    Power Services, Inc. (PAN) dated July 11, 1996. This Service Agreement 
    specifies that PAN has agreed to the rates, terms and conditions of the 
    GPU Companies' Energy Transmission Service Tariff accepted by the 
    Commission on September 28, 1995, in Docket No. ER95-791-000 and 
    designated as FERC Electric Tariff, Original Volume No. 3.
        GPU requests a waiver of the Commission's notice requirements for 
    good causes shown and an effective date July 11, 1996, for the Service 
    Agreement. GPU has served copies of the filing on regulatory agencies 
    in New Jersey and Pennsylvania and on PAN.
    
    [[Page 40217]]
    
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. New York State Electric & Gas Corporation
    
    [Docket No. ER96-2466-000]
    
        Take notice that on July 18, 1996, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing tariffs and various agreements 
    relating to the purchase of up to 32 MW of New York Power Authority 
    (NYPA) Economic Development Power (EDP) for resale to eligible retail 
    customers in NYSEG's service territory pursuant to tariff rates and 
    terms (the EDPP Tariff) approved by the New York State Public Service 
    Commission (NYPSC). NYSEG requests that the Commission disclaim 
    jurisdiction over this filing. Alternatively, NYSEG requests a waiver 
    of the Commission's notice requirements and the following effective 
    dates:
    
    ------------------------------------------------------------------------
                 Agreement/tariff                 Requested effective date  
    ------------------------------------------------------------------------
    NYSEG's EDPP Tariff.......................  April 11, 1994.             
    EDP Settlement Agreement (as approved by    August 15, 1994.            
     NYPSC).                                                                
    NYSEG/NYPA EDP Agreements, as amended       May 27, 1994.               
     (including EDP Metering Agreement).                                    
    ------------------------------------------------------------------------
    
        Copies of the filing were served upon the NYPSC, NYPA, and Multiple 
    Intervenors (on behalf of certain industrial customers served by 
    NYSEG).
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. The Washington Water Power Company
    
    [Docket No. ER96-2467-000]
    
        Take notice that on July 18, 1996, The Washington Water Power 
    Company (WWP), tendered for filing a Termination Agreement for The 
    Intercompany Pool Agreement. WWP states that the intention of said 
    Termination Agreement is to terminate The Intercompany Pool Agreement 
    effective 2400 hours on October 31, 1996. Notices of Cancellation and 
    Certificates of Concurrence were submitted for the filing parties which 
    include:
    
    Idaho Power Company
    PacifiCorp
    Portland General Electric Company
    Puget Sound Power & Light Company
    Sierra Pacific Power Company
    The Montana Power Company
    The Washington Water Power Company
    
        Comment date: August 9, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington DC, with 
    Rules 211 and 214 of the Commission's Rules of Practice and Procedure 
    (18 CFR 385.211 and 18 CFR 385.214). All such motions or protests 
    should be filed on or before the comment date. Protests will be 
    considered by the Commission in determining the appropriate action to 
    be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-19577 Filed 7-31-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/01/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-19577
Dates:
August 8, 1996, in accordance with Standard Paragraph E at the end of this notice.
Pages:
40214-40217 (4 pages)
Docket Numbers:
Docket No. ER95-1358-006, et al.
PDF File:
96-19577.pdf