96-19578. J.D. Enterprises, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 149 (Thursday, August 1, 1996)]
    [Notices]
    [Pages 40211-40214]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-19578]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER96-2435-000, et al.]
    
    
    J.D. Enterprises, et al.; Electric Rate and Corporate Regulation 
    Filings
    
    July 25, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. J.D. Enterprises
    
    [Docket No. ER96-2435-000]
    
        Take notice that on July 5, 1996, J.D. Enterprises, tendered for 
    filing pursuant to Rule 205, 18 CFR 385.205, a petition for waiver and 
    blanket approvals under various regulations of the Commission and for 
    an order accepting its FERC Electric Rate Schedule No. 1.
        J.D. Enterprises intends to engage in electric power and energy 
    transactions as marketer and a broker. In transactions where J.D. 
    Enterprises sells electric energy it proposes to make such sales on 
    rates, terms and conditions to be mutually agreed to with the 
    purchasing party. J.D. Enterprises is not in the business of 
    generating, transmitting, or distributing electric power.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. Baltimore Gas and Electric Company
    
    [Docket No. ER96-2436-000]
    
        Take notice that on July 16, 1996, Baltimore Gas and Electric 
    Company (BGE), filed a Service Agreement dated June 17, 1996 with 
    Phibro Inc. (Phibro) under BGE's FERC Electric Tariff Original Volume 
    No. 3 (Tariff). Under the tendered Service Agreement, BGE agrees to 
    provide services to Phibro under the provisions of the Tariff. BGE 
    requests an effective date of June 17, 1996 for the Service Agreement. 
    BGE states that a copy of the filing were served upon the Public 
    Service Commission of Maryland.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. Portland General Electric Company
    
    [Docket No. ER96-2437-000]
    
        Take notice that on July 16, 1996, Portland General Electric 
    Company (PGE), tendered for filing under FERC Electric Tariff, 1st 
    Revised Volume No. 2, an executed Service Agreement between PGE and 
    National Gas & Electric L.P.
        Pursuant to 18 CFR 35.11 and the Commission's order issued July 30, 
    1993 (Docket No. PL95-2-002), PGE respectfully requests the Commission 
    grant a waiver of the notice requirements of 18 CFR 35.3 to allow the 
    executed Service Agreement to become effective July 1, 1996.
        Copies of this filing were served upon National Gas & Electric L.P.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Duke Power Company
    
    [Docket No. ER96-2439-000]
    
        Take notice that on July 15, 1996, Duke Power Company (Duke), 
    tendered for filing Schedule MR Transaction Sheets under Duke's FERC 
    Electric Tariff, Original Volume No. 3 for the quarter ended June 30, 
    1996.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Public Service Company of Colorado
    
    [Docket No. ER96-2440-000]
    
        Take notice that on July 17, 1996, Public Service Company of 
    Colorado, tendered for filing a Third Revision to Exhibit B of its 
    Contract for Interconnections and Transmission Service with Tri-State 
    Generation and Transmission Association, Inc. as contained in Public 
    Service's Rate Schedule FERC No. 24, to change specified delivery 
    points.
        Public Service requests an effective date of June 25, 1996, for 
    this filing.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-2441-000]
    
        Take notice that on July 17, 1996, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a Supplement to its 
    Rate Schedule, Con Edison Rate Schedule FERC No. 2, a facilities 
    agreement with Central Hudson Gas and Electric Corporation (CH). The 
    Supplement provides for a decrease in the monthly carrying charges. Con 
    Edison has requested that this decrease take effect as of June 1, 1996.
        Con Edison states that a copy of this filing has been served by 
    mail upon CH.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-2442-000]
    
        Take notice that on July 17, 1996, Consolidated Edison Company of 
    New York, Inc. (Con Edison), tendered for filing a Supplement to its 
    Rate Schedule, Con Edison Rate Schedule FERC No. 123, a facilities 
    agreement with Central Hudson Gas and Electric Corporation (CH). The 
    Supplement
    
    [[Page 40212]]
    
    provides for a decrease in the monthly carrying charges. Con Edison has 
    requested that this decrease take effect as of June 13, 1996.
        Con Edison states that a copy of this filing has been served by 
    mail upon CH.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-2443-000]
    
        Take notice that on July 17, 1996, Consolidated Edison Company of 
    New York Inc. (Con Edison), tendered for filing a Supplement to its 
    Rate Schedule, Con Edison Rate Schedule FERC No. 127, a facilities 
    agreement with the New York Power Authority (NYPA). The Supplement 
    provides for a decrease in the monthly carrying charges. Con Edison has 
    requested that this decrease take effect as of July 1, 1996.
        Con Edison states that a copy of this filing has been served by 
    mail upon NYPA.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Portland General Electric Company
    
    [Docket No. ER96-2444-000]
    
        Take notice that on July 17, 1996, Portland General Electric 
    Company (PGE), tendered for filing under FERC Electric Tariff, First 
    Revised Volume No. 2, executed Service Agreement for Grays Harbor 
    County Public Utility District.
        Pursuant to 18 CFR 35.11 and the Commission's order issued July 30, 
    1993 (Docket No. PL95-2-002), PGE respectfully requests the Commission 
    grant a waiver of the notice requirements of 18 CFR 35.3 to allow the 
    executed Service Agreement to become effective July 1, 1996.
        A copy of this filing was served upon Grays Harbor County PUD as 
    noted in the filing letter.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Florida Power Corporation
    
    [Docket No. ER96-2445-000]
    
        Take notice that on July 17, 1996, Florida Power Corporation, 
    tendered for filing a service agreement providing for service to PECO 
    Energy Company, pursuant to Florida Power's power sales tariff. Florida 
    Power requests that the Commission waive its notice of filing 
    requirements and allow the Service Agreement to become effective on 
    July 18, 1996.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. PECO Energy Company
    
    [Docket No. ER96-2446-000]
    
        Take notice that on July 17, 1996, PECO Energy Company (PECO), 
    filed a Service Agreement dated July 11, 1996 with Central Hudson Gas & 
    Electric Corporation (CENTRAL HUDSON) under PECO's FERC Electric 
    Tariff, First Revised Volume No. 4 (Tariff). The Service Agreement adds 
    CENTRAL HUDSON as a customer under the Tariff.
        PECO requests an effective date of July 11, 1996, for the Service 
    Agreement.
        PECO states that copies of this filing have been supplied to 
    CENTRAL HUDSON and to the Pennsylvania Public Utility Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. PECO Energy Company
    
    [Docket No. ER96-2447-000]
    
        Take notice that on July 17, 1996, PECO Energy Company (PECO), 
    filed a Service Agreement dated July 11, 1996 with Florida Power 
    Corporation (FLORIDA POWER) under PECO's FERC Electric Tariff, First 
    Revised Volume No. 4 (Tariff). The Service Agreement adds FLORIDA POWER 
    as a customer under the Tariff.
        PECO requests an effective date of July 11, 1996, for the Service 
    Agreement.
        PECO states that copies of this filing have been supplied to 
    FLORIDA POWER and to the Pennsylvania Public Utility Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. PECO Energy Company
    
    [Docket No. ER96-2448-000]
    
        Take notice that on July 17, 1996, PECO Energy Company (PECO), 
    filed a Service Agreement dated July 11, 1996 with Ohio Edison Company 
    (OE) under PECO's FERC Electric Tariff, First Revised Volume No. 4 
    (Tariff). The Service Agreement adds OE as a customer under the Tariff.
        PECO requests an effective date of July 11, 1996, for the Service 
    Agreement.
        PECO states that copies of this filing have been supplied to OE and 
    to the Pennsylvania Public Utility Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. PECO Energy Company
    
    [Docket No. ER96-2449-000]
    
        Take notice that on July 17, 1996, PECO Energy Company (PECO), 
    filed a Service Agreement dated July 10, 1996 with Utilities 
    Commission-New Smyrna Beach, Florida (UCNSBF) under PECO's FERC 
    Electric Tariff, First Revised Volume No. 4 (Tariff). The Service 
    Agreement adds UCNSBF as a customer under the Tariff.
        PECO requests an effective date of July 10, 1996, for the Service 
    Agreement.
        PECO states that copies of this filing have been supplied to UCNSBF 
    and to the Pennsylvania Public Utility Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Wisconsin Electric Power Company
    
    [Docket No. ER96-2450-000]
    
        Take notice that on July 17, 1996, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing a Transmission Service 
    Agreement between itself and CNG Power Service Corporation (CNG). The 
    Transmission Service Agreement allows CNG to receive transmission 
    service under Wisconsin Electric's FERC Electric Tariff, Original 
    Volume No. 5, under Docket No. ER95-1474-000, Rate Schedule STNF.
        Wisconsin Electric requests an effective date of July 30, 1996 and 
    waiver of the Commission's notice requirements to allow for economic 
    transactions. Copies of the filing have been served on CNG, the Public 
    Service Commission of Wisconsin and the Michigan Public Service 
    Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Wisconsin Electric Power Company
    
    [Docket No. ER96-2451-000]
    
        Take notice that on July 17, 1996, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing an Electric Service Agreement 
    and a Transmission Service Agreement between itself and VTEC Energy 
    Inc. (VTEC). The Electric Service Agreement provides for service under 
    Wisconsin Electric's Coordination Sales Tariff. The Transmission 
    Service Agreement allows VTEC to receive transmission service under 
    Wisconsin Electric's FERC Electric Tariff, Original Volume No. 5, Rate 
    Schedule STNF, under Docket No. ER95-1474-000.
        Wisconsin Electric requests an effective date of sixty days from 
    date of filing. Copies of the filing have been
    
    [[Page 40213]]
    
    served on VTEC, the Public Service Commission of Wisconsin and the 
    Michigan Public Service Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Wisconsin Electric Power Company
    
    [Docket No. ER96-2452-000]
    
        Take notice that on July 17, 1996, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing an Electric Service Agreement 
    and a Transmission Service Agreement between itself and Entergy 
    (Entergy). The Electric Service Agreement provides for service under 
    Wisconsin Electric's Coordination Sales Tariff. The Transmission 
    Service Agreement allows Entergy to receive transmission service under 
    Wisconsin Electric's FERC Electric Tariff, Original Volume No. 5, Rate 
    Schedule STNF, under Docket No. ER95-1474-000.
        Wisconsin Electric requests an effective date of sixty days from 
    date of filing. Copies of the filing have been served on Entergy, the 
    Public Service Commission of Wisconsin and the Michigan Public Service 
    Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Northern States Power Company (Minnesota Company)
    
    [Docket No. ER96-2453-000]
    
        Take notice that on July 17, 1996, Northern States Power Company 
    (Minnesota) (NSP), tendered for filing the following Transmission 
    Service Agreement between NSP and Cenerprise, Inc.
        NSP requests that the Commission accept the agreements effective 
    June 17, 1996, and requests waiver of the Commission's notice 
    requirements in order for the agreements to be accepted for filing on 
    the date requested.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Commonwealth Edison Company
    
    [Docket No. ER96-2454-000]
    
        Take notice that on July 17, 1996, Commonwealth Edison Company 
    (ComEd), submitted for filing five Service Agreements, establishing 
    Atlantic City Electric Co. (Atlantic), dated February 29, 1996, GPU 
    Service Corporation (GPU), dated March 6, 1996, PanEnergy Power 
    Services, Inc. (PanEnergy), dated May 17, 1996, Duke Power Company 
    (Duke), dated June 26, 1996, and Delmarva Power and Light Company 
    (Delmarva), dated June 26, 1996, as customers under the terms of 
    ComEd's Power Sales Tariff PS-1 (PS-1 Tariff). The Commission has 
    previously designated the PS-1 Tariff as FERC Electric Tariff, Original 
    Volume No. 2.
        ComEd requests an effective date of June 17, 1996 for the Service 
    Agreements between ComEd and Atlantic, GPU and PanEnergy, and an 
    effective date of June 26, 1996 for the Service Agreements between 
    ComEd and Duke and Delmarva, and accordingly seeks waiver of the 
    Commission's regulations. Copies of this filing were served upon 
    Atlantic, GPU, PanEnergy, Duke, Delmarva and the Illinois Commerce 
    Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Cinergy Services, Inc.
    
    [Docket No. ER96-2456-000]
    
        Take notice that on July 18, 1996, Cinergy Services, Inc. 
    (Cinergy), tendered for filing on behalf of its operating companies, 
    The Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. 
    (PSI), an Interchange Agreement, dated July 1, 1996 between Cinergy, 
    CG&E, PSI and Vastar Power Marketing, Inc. (Vastar).
        The Interchange Agreement provides for the following service 
    between Cinergy and Vastar.
    
    1. Exhibit A--Power Sales by Vastar
    2. Exhibit B--Power Sales by Cinergy
    
        Cinergy and Vastar have requested an effective date of July 22, 
    1996.
        Copies of the filing were served on Vastar Power Marketing, Inc., 
    the Texas Public Utility Commission, the Kentucky Public Service 
    Commission, the Public Utilities Commission of Ohio and the Indiana 
    Utility Regulatory Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Cinergy Services, Inc.
    
    [Docket No. ER96-2457-000]
    
        Take notice that on July 18, 1996, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Non-
    Firm Power Sales Standard Tariff (the Tariff) entered into between 
    Cinergy and PacifiCorp.
        Cinergy and PacifiCorp are requesting an effective date of July 22, 
    1996.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Cinergy Services, Inc.
    
    [Docket No. ER96-2458-000]
    
        Take notice that on July 18, 1996, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Non-
    Firm Power Sales Standard Tariff (the Tariff) entered into between 
    Cinergy and Duke Power Company.
        Cinergy and Duke Power Company are requesting an effective date of 
    July 22, 1996.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. MidAmerican Energy Company
    
    [Docket No. ER96-2459-000]
    
        Take notice that on July 18, 1996, MidAmerican Energy Company 
    (MidAmerican), 106 East Second Street, Davenport, Iowa 52801, filed 
    with the Commission a Firm Transmission Service Agreement with Coastal 
    Electric Services Company (Coastal) dated June 27, 1996, and Non-Firm 
    Transmission Service Agreement with Coastal dated June 27, 1996, 
    entered into pursuant to MidAmerican's Point-to-Point Transmission 
    Service Tariff, FERC Electric Tariff, Original Volume No. 4.
        MidAmerican requests an effective date of June 27, 1996 for the 
    Agreements with Coastal, and accordingly seeks a waiver of the 
    Commission's notice requirement. MidAmerican has served a copy of this 
    filing on Coastal, the Iowa Utilities Board, the Illinois Commerce 
    Commission and the South Dakota Public Utilities Commission.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. Illinois Power Company
    
    [Docket No. ER96-2460-000]
    
        Take notice that on July 18, 1996, Illinois Power Company (Illinois 
    Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for 
    filing firm and non-firm transmission agreements under which 
    TransCanada Power Corporation will take transmission service pursuant 
    to its open access transmission tariff. The agreements are based on the 
    Form of Service Agreements in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 15, 1996.
        Comment date: August 8, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
    accordance with Rules 211 and 214 of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions
    
    [[Page 40214]]
    
    or protests should be filed on or before the comment date. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceeding. Any person wishing to become a party must file a motion 
    to intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-19578 Filed 7-31-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/01/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-19578
Dates:
August 8, 1996, in accordance with Standard Paragraph E at the end of this notice.
Pages:
40211-40214 (4 pages)
Docket Numbers:
Docket No. ER96-2435-000, et al.
PDF File:
96-19578.pdf