2024-18484. Airworthiness Directives; Dassault Aviation Airplanes  

  • Estimated Costs for Required Actions

    Labor cost Parts cost Cost per product Cost on U.S. operators
    Up to 4 work-hours × $85 per hour = $340 $20,840 Up to $21,180 Up to $15,228,420.

    The FAA estimates the following costs to do any necessary on-condition actions that would be required based on the results of any required actions. The FAA has no way of determining the number of aircraft that might need these on-condition actions:

    Estimated Costs of On-Condition Actions

    Actions Labor cost Parts cost Cost per product
    Replace one external battery 1 work-hour × $85 per hour = $85 $430 $515

Document Information

Published:
08/21/2024
Department:
Federal Aviation Administration
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
2024-18484
Dates:
The FAA must receive comments on this proposed AD by October 7, 2024.
Pages:
67572-67575 (4 pages)
Docket Numbers:
Docket No. FAA-2024-2022, Project Identifier MCAI-2024-00189-T
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
2024-18484.pdf
Supporting Documents:
» U.S. DOT/FAA - Supplemental AD Documents
CFR: (1)
14 CFR 39