[Federal Register Volume 59, Number 149 (Thursday, August 4, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-18977]
[[Page Unknown]]
[Federal Register: August 4, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG94-86-000, et al.]
CMS Operating S.A., et al.; Electric Rate and Corporate
Regulation Filings
July 28, 1994.
Take notice that the following filings have been made with the
Commission:
1. CMS Operating S.A.
[Docket No. EG94-86-000]
On July 21, 1994, CMS Operating S.A., Av. Roque Saenz Pena 1116,
piso 9 (1035), Buenos Aires, Argentina, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
regulations.
CMS Operating S.A. is a subsidiary of CMS Generation S.A., which is
a subsidiary of CMS Enterprises Company, which in turn is a wholly-
owned subsidiary of CMS Energy Corporation. Through affiliates, CMS
Operating S.A. was pre-awarded on June 29, 1994, the right to operate
the Lujan de Cuyo and Cruz de Piedra locations of Centrales Termicas
Mendoza S.A., which have a nominal capacity exceeding 400 MW. The
Facility is located near the City of Mendoza in Argentina.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. The City of Cleveland, Ohio v. The Cleveland Electric
Illuminating Company
[Docket No. EL94-80-000]
Take notice that on July 20, 1994, the City of Cleveland, Ohio
tendered for filing a complaint against the Cleveland Electric
Illuminating Company for breaches of the 1975 Interconnection Agreement
between the parties.
Comment date: August 29, 1994, in accordance with Standard
Paragraph E at the end of this notice.
3. Southern California Edison Company
[Docket No. ER88-83-011]
Take notice that on July 21, 1994, Southern California Edison
Company tendered for filing its compliance filing in the above-
referenced docket.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
4. Southern California Edison Company
[Docket No. ER91-201-004]
Take notice that on July 21, 1994, Southern California Edison
Company tendered for filing its compliance filing in the above-
referenced docket.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
5. Wisconsin Power and Light Company
[Docket No. ER94-158-000]
Take notice that on July 22, 1994, Wisconsin Power and Light
Company (WP&L) tendered for filing a signed Service Agreement under
WP&L's Bulk Power Tariff between itself and Consolidated Water Power
Company. WP&L respectfully requests a waiver of the Commission's notice
requirements, and an effective date of May 15, 1994.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
6. Northeast Empire L.P. #2
[Docket No. ER94-1448-000]
Take notice that on July 14, 1994, Northeast Empire L.P. #2
tendered for filing an amendment to its July 6, 1994, filing in the
above-referenced docket.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
7. San Diego Gas & Electric Company
[Docket No. ER94-1455-000]
Take notice that on July 15, 1994, San Diego Gas & Electric Company
(SDG&E) tendered for filing an Interchange Agreement (Agreement)
between SDG&E and Eclipse Energy, Inc. (Eclipse).
SDG&E requests that the Commission allow the Agreement to become
effective on the 15th of September, 1994, or at the earliest possible
date.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and Eclipse.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Pepperell Power Associates Limited Partnership
[Docket Nos. AC94-214-000 ER94-1474-000]
Take notice that on July 15, 1994, Pepperell Power Associates
Limited Partnership tendered for filing a notice of termination of its
Power Sale Agreement with the Commonwealth Electric Company and a
request for waiver of the requirement to file a Form 1 for the calendar
years 1993 and 1994.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Cal Ban Corp.
[Docket Nos. QF83-333-002 and QF83-333-003]
On July 25, 1994, Cal Ban Corp. tendered for filing an amendment to
its filing in this docket.
The amendment pertains to the technical aspects of the facility. No
determination has been made that the submittal constitutes a complete
filing.
Comment date: August 17, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 94-18977 Filed 8-3-94; 8:45 am]
BILLING CODE 6717-01-P