94-18977. CMS Operating S.A., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 149 (Thursday, August 4, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-18977]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 4, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. EG94-86-000, et al.]
    
     
    
    CMS Operating S.A., et al.; Electric Rate and Corporate 
    Regulation Filings
    
    July 28, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. CMS Operating S.A.
    
    [Docket No. EG94-86-000]
    
        On July 21, 1994, CMS Operating S.A., Av. Roque Saenz Pena 1116, 
    piso 9 (1035), Buenos Aires, Argentina, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations.
        CMS Operating S.A. is a subsidiary of CMS Generation S.A., which is 
    a subsidiary of CMS Enterprises Company, which in turn is a wholly-
    owned subsidiary of CMS Energy Corporation. Through affiliates, CMS 
    Operating S.A. was pre-awarded on June 29, 1994, the right to operate 
    the Lujan de Cuyo and Cruz de Piedra locations of Centrales Termicas 
    Mendoza S.A., which have a nominal capacity exceeding 400 MW. The 
    Facility is located near the City of Mendoza in Argentina.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. The City of Cleveland, Ohio v. The Cleveland Electric 
    Illuminating Company
    
    [Docket No. EL94-80-000]
    
        Take notice that on July 20, 1994, the City of Cleveland, Ohio 
    tendered for filing a complaint against the Cleveland Electric 
    Illuminating Company for breaches of the 1975 Interconnection Agreement 
    between the parties.
        Comment date: August 29, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Southern California Edison Company
    
    [Docket No. ER88-83-011]
    
        Take notice that on July 21, 1994, Southern California Edison 
    Company tendered for filing its compliance filing in the above-
    referenced docket.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Southern California Edison Company
    
    [Docket No. ER91-201-004]
    
        Take notice that on July 21, 1994, Southern California Edison 
    Company tendered for filing its compliance filing in the above-
    referenced docket.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Wisconsin Power and Light Company
    
    [Docket No. ER94-158-000]
    
        Take notice that on July 22, 1994, Wisconsin Power and Light 
    Company (WP&L) tendered for filing a signed Service Agreement under 
    WP&L's Bulk Power Tariff between itself and Consolidated Water Power 
    Company. WP&L respectfully requests a waiver of the Commission's notice 
    requirements, and an effective date of May 15, 1994.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Northeast Empire L.P. #2
    
    [Docket No. ER94-1448-000]
    
        Take notice that on July 14, 1994, Northeast Empire L.P. #2 
    tendered for filing an amendment to its July 6, 1994, filing in the 
    above-referenced docket.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. San Diego Gas & Electric Company
    
    [Docket No. ER94-1455-000]
    
        Take notice that on July 15, 1994, San Diego Gas & Electric Company 
    (SDG&E) tendered for filing an Interchange Agreement (Agreement) 
    between SDG&E and Eclipse Energy, Inc. (Eclipse).
        SDG&E requests that the Commission allow the Agreement to become 
    effective on the 15th of September, 1994, or at the earliest possible 
    date.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and Eclipse.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Pepperell Power Associates Limited Partnership
    
    [Docket Nos. AC94-214-000 ER94-1474-000]
    
        Take notice that on July 15, 1994, Pepperell Power Associates 
    Limited Partnership tendered for filing a notice of termination of its 
    Power Sale Agreement with the Commonwealth Electric Company and a 
    request for waiver of the requirement to file a Form 1 for the calendar 
    years 1993 and 1994.
        Comment date: August 12, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Cal Ban Corp.
    
    [Docket Nos. QF83-333-002 and QF83-333-003]
    
        On July 25, 1994, Cal Ban Corp. tendered for filing an amendment to 
    its filing in this docket.
        The amendment pertains to the technical aspects of the facility. No 
    determination has been made that the submittal constitutes a complete 
    filing.
        Comment date: August 17, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 94-18977 Filed 8-3-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/04/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-18977
Dates:
August 12, 1994, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: August 4, 1994, Docket No. EG94-86-000, et al.