DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG94-87-000, et al.]
Hermiston Power Partnership, et al.; Electric Rate and Corporate
Regulation Filings
July 29, 1994.
Take notice that the following filings have been made with the
Commission:
1. Hermiston Power Partnership
[Docket No. EG94-87-000]
On July 26, 1994, Hermiston Power Partnership, c/o Hermiston Power
Company, P.O. Box 7867, Boise, ID 83707, filed with the Federal Energy
Regulatory Commission (``Commission'') an application for exempt
wholesale generator status pursuant to Part 365 of the Commission's
regulations.
Hermiston Power Partnership intends to own and operate a multi-
unit, natural gas-fired combined-cycle cogeneration facility with
automatic generation control and related transmission and
interconnection equipment and with a maximum net electric power
production capacity of 461 megawatts. All of the facility's electric
power net of the facility's operating electric power will be sold at
wholesale to the Bonneville Power Administration, acting on behalf of
the United States Department of Energy.
Comment date: August 19, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. PSI Energy In.
[Docket No. ER89-672-006]
Take notice that on January 13, and July 1993, and July 11, 1994,
PSI Energy Inc. (PSI) submitted its informational filing for the Second
half of 1992, First half of 1993 and First half of 1994 as required by
Section T of its Transmission Service Tariff. Copies of PSI's
informational filing are on file with the Commission and are available
for public inspection.
3. National Electric Associates Limited Partnership
[Docket No. ER90-168-017]
Take notice that on July 19, 1994, National Electric Associates
Limited Partnership (NEA) filed certain information as required by the
Ordering Paragraph (L) of the Commission's March 20, 1990, order in
Docket No. ER90-168-000. Copies of NEA's informational filing are on
file with the Commission and are available for public inspection.
4. Chicago Energy Exchange of Chicago, Inc.
[Docket No. ER90-225-017]
Take notice that on July 14, 1994, Chicago Energy Exchange of
Chicago, Inc. (Energy Exchange) filed certain information as required
by the Ordering Paragraph (L) of the Commission's April 19, 1990, order
in this proceeding, 51 FERC 61,054 (1990). Copies of Energy
Exchange's informational filing are on file with the Commission and are
available for public inspection.
5. Milford Power Limited Partnership
[Docket No. ER93-493-002]
Take notice that on July 5, 1994, Milford Power Limited Partnership
(Partnership), filed certain information as required by the
Commission's September 17, 1993, letter order in Docket No. ER93-493-
000. Copies of Partnership's informational filing are on file with the
Commission and are available for public inspection.
6. CRSS Power Marketing, Inc.
[Docket No. ER94-142-002]
Take notice that on July 12, 1994, CRSS Power Marketing, Inc.
(CRSS) filed certain information as required by the Commission's
December 30, 1993, letter order in Docket No. ER94-142-000. Copies of
CRSS's informational filing are on file with the Commission and are
available for public inspection.
7. Eastern Power Distribution, Inc.
[Docket No. ER94-964-002]
Take notice that on July 15, 1994, Eastern Power Distribution, Inc.
(EDP) filed certain information as required by the Commission's April
5, 1994, letter order in Docket No. ER94-964-000. Copies of EDP's
informational filing are on file with the Commission and are available
for public inspection.
8. Maine Public Service Co.
[Docket No. ER94-1481-000]
Take notice that on July 22, 1994, Maine Public Service Company
(Maine Public) filed an executed Service Agreement with Boston Edison
Company. Maine Public states that the service agreement is being
submitted pursuant to its tariff provision pertaining to the short-term
non-firm sale of capacity and energy which establishes a ceiling rate
at Maine Public's cost of service for the units available for sale.
Maine Public requests that the service agreement become effective
on August 1, 1994, and requests waiver of the Commission's regulations
regarding filing.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Entergy Services, Inc.
[Docket No. ER94-1482-000]
Take notice that on July 22, 1994, Entergy Services, Inc. (Entergy
Services) tendered for filing a Revised Attachment A to the
Transmission Service Agreement (TSA) between Entergy Services and AES
Power, Inc. Entergy Services states that the TSA sets out the
transmission arrangements under the Entergy Operating Companies'
Transmission Service Tariff over their transmission system for certain
sales by AES to East Kentucky Power Cooperative, Inc. Revised
Attachment A increases the level of service under the TSA to 5 MW.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. Arizona Public Service Co.
[Docket No. ER94-1483-000]
Take notice that on July 25, 1994, Arizona Public Service Company
(APS) tendered for filing Amendment No. 3 to the Axis Station Agreement
between Imperial Irrigation District (IID) and APS, the Axis Station
Letter Agreement of Future Intentions and the Axis Committee Agreement
on Natural Gas Service for Axis/Yucca Steam Power Plant (Committee
Agreement) all related to APS-FPC Rate Schedule No. 5 APS has requested
that the Commission disclaim jurisdiction over the Committee Agreement.
Copies of this filing have been served upon IID and the Arizona
Corporation Commission.
Comment date: August 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
11. San Diego Gas & Electric Co.
[Docket No. ER94-1484-000]
Take notice that on July 25, 1994, San Diego Gas & Electric Company
(SDG&E) tendered for filing an Interchange Agreement between SDG&E and
the City of Redding, (Redding).
SDG&E requests that the Commission allow the Agreement to become
effective on the 1st day of October, 1994 or at the earliest possible
date.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and Redding.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
12. San Diego Gas & Electric Co.
[Docket No. ER94-1485-000]
Take notice that on July 25, 1994 San Diego Gas & Electric Company
(SDG&E) tendered for filing an Interchange Agreement between SDG&E and
National Electric Associates Limited Partnership, (NEA).
SDG&E requests that the Commission allow the Agreement to become
effective on the 1st day of October, 1994 or at the earliest possible
date.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and NEA.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
13. Indiana Michigan Power Co.
[Docket No. ER94-1486-000]
Take notice that Indiana Michigan Power Company (I&M), on July 22,
1994, tendered for filing with the Commission Facility Request No. 5 to
the existing Agreement, dated December 11, 1989, (1989 Agreement),
between I&M and Wabash Valley Power Association, Inc. (WVPA). Facility
Request No. 5 was negotiated in response to WVPA's request that I&M
provide an additional delivery point at 138-kV for a new station to be
operated by Noble County REMC (Co-op Name) and known as LaOtto Station.
The Commission has previously designated the 1989 Agreement as I&M's
Rate Schedule FERC No. 81.
As requested by, and for the sole benefit of WVPA, I&M proposes an
effective date of October 31, 1994, for Facilities Request No. 5. A
copy of this filing was served upon WVPA, the Indiana Utility
Regulatory Commission, and the Michigan Public Service Commission.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
14. Ohio Power Co.
[Docket No. ER94-1487-000]
Take notice that American Electric Power Service Corporation
(AEPSC), on July 25, 1994, tendered for filing a transmission service
agreement, dated July 1, 1994, (TSA). The TSA, executed by Cleveland
Public Power (CPP) and Ohio Power Company (OPCO), provides for service
to be made available to CPP pursuant to AEPSC FERC Electric Tariff
Original Volume No. 1. An effective date of July 1, 1994, was
requested.
A copy of the filing was served upon CPP and the Public Utility
Commission of Ohio.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
15. Northeast Utilities Service Co.
[Docket No. ER94-1489-000]
Take notice that Northeast Utilities Service Company (NUSCO), on
July 25, 1994, tendered for filing, a Service Agreement to provide non-
firm transmission service to Maine Public Service Company (MPSC) under
the NU system Companies' Transmission Service Tariff No. 2.
NUSCO states that a copy of the filing has been mailed to MPSC.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
16. Public Service Company of New Mexico
[Docket No. ER94-1490-000]
Take notice that on July 26, 1994, Public Service Company of New
Mexico (PNM) tendered for filing a Service Schedule D to the
Interconnection Agreement between PNM and the City of Anaheim,
California (Anaheim). Service Schedule D provides for the sale of short
term firm capacity between PNM and Anaheim.
Copies of the filing have been served upon Anaheim and the New
Mexico Public Utility Commission.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
17. Public Service Company of New Mexico
[Docket No. ER94-1491-000]
Take notice that on July 26, 1994, Public Service Company of New
Mexico (PNM) tendered for filing an Amendment Number One to Service
Schedule E to an Interconnection Agreement between PNM and Utah
Associated Municipal Power Systems (UAMPS). Amendment Number One
provides for the addition of the Four Corners Generating Station
delivery point and amends the monthly charge for San Juan Unit 4
Transmission Service.
PNM requests waiver of the Commission's notice requirements for an
effective date of July 1, 1994, for Amendment Number One.
Copies of the filing have been served upon UAMPS and the New Mexico
Public Utility Commission.
Comment date: August 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs:
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 94-19013 Filed 8-3-94; 8:45 am]