[Federal Register Volume 61, Number 151 (Monday, August 5, 1996)]
[Notices]
[Pages 40635-40636]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-19773]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-641-000]
ANR Pipeline Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Michigan Leg South Looping
Project and Request for Comments on Environmental Issues
July 30, 1996.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the construction and operation of
the facilities proposed in the Michigan Leg South Looping Project.\1\
This EA will be used by the Commission in its decision-making process
to determine whether an environmental impact statement is necessary and
whether to approve the project.
---------------------------------------------------------------------------
\1\ ANR Pipeline Company's application was filed with the
Commission under Section 7 of the Natural Gas Act and Part 157 of
the Commission's regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
ANR Pipeline Company (ANR) proposes to loop its existing Michigan
Leg South System with 11.9 miles of 42-inch-diameter pipeline in two
segments. The two segments consist of 1.6 miles of loop in Will County,
Illinois, and 10.3 miles of loop in Porter County, Indiana. The project
also includes the addition of one aftercooling bay at the existing St.
John Compressor Station in Lake County, Indiana, and the relocation of
an existing pig launcher from milepost (MP) 885.02 to MP 874.72 in
Porter County, Indiana, and a pig receiver from MP 848.31 to MP 849.91
in Will County, Illinois. The general location of the project
facilities are shown in appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public reference and Files Maintenance Branch, 888
First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 186.3
acres of land. About 35.8 acres of the 186.3 acres is existing pipeline
right-of-way. About 50.1 acres would be new permanent right-of-way for
the loop, and about 100.4 acres of the construction right-of-way and
extra workspaces would be allowed to revert to its prior use after
construction.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils.
Water resources, fisheries, and wetlands.
Vegetation and wildlife.
Endangered and threatened species.
Land use.
Cultural resources.
Air quality and noise.
Public safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and
[[Page 40636]]
the Commission's official service list for this proceeding. A comment
period will be allotted for review if the EA is published. We will
consider all comments on the EA before we recommend that the Commission
approve or not approve the project.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by ANR. Keep in mind that this
is a preliminary list:
Thirteen residences are within 25 feet of the construction
right-of-way.
The sports facilities on the property of the Liberty
School and Liberty Middle School are crossed.
The list of issues may be added to, subtracted from, or changed
based on your comments and our analysis.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative routes), and measures to avoid or
lessen environmental impact. The more specific your comments, the more
useful they will be. Please follow the instructions below to ensure
that your comments are received and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 888 First St., N.E., Washington, D.C.
20426;
Reference Docket No. CP96-641-000;
Send a copy of your letter to: Mr. Bob Kopka, EA Project
Manager, Federal Energy Regulatory Commission, 888 First St., N.E., PR-
11.1, Washington, D.C. 20426; and
Mail your comments so that they will be received in
Washington, D.C. on or before August 30, 1996.
If you wish to receive a copy of the EA, you should request one from
Mr. Kopka at the above address.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 2). You do not need intervenor status to have your scoping
comments considered.
Additional information about the proposed project is available from
Mr. Bob Kopka, EA Project Manager, at (202) 208-0282.
Lois D. Cashell,
Secretary.
[FR Doc. 96-19773 Filed 8-2-96; 8:45 am]
BILLING CODE 6717-01-M