2011-23221. Southern Nuclear Operating Co., PPL Bell Bend, L.L.C., Luminant Generation Company LLC; Establishment of Atomic Safety and Licensing Board  

  • Start Preamble

    Pursuant to delegation by the Commission dated December 29, 1972, published in the Federal Register, 37 FR 28,710 (1972), and the Commission's regulations, see, e.g., 10 CFR 2.104, 2.105, 2.300, 2.309, 2.313, 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over this proceeding, which involves the following captioned cases:

    Southern Nuclear Operating Co., (Vogtle Electric Generating Plant, Units 3 and 4), Docket Nos. 52-025-COL & 52-026-COL.

    PPL Bell Bend, L.L.C., (Bell Bend Nuclear Power Plant), Docket No. 52-039-COL.

    Luminant Generation Company LLC, (Comanche Peak Nuclear Power Plant, Units 3 and 4), Docket Nos. 52-034-COL & 52-035-COL.

    This proceeding was triggered by the following recent filings that were based on the Fukushima Task Force Report: (1) The Center for a Sustainable Coast, Georgia Women's Action for New Directions, and Southern Alliance for Clean Energy filed a motion to reopen the record and admit a new contention in the above-captioned Vogtle case; (2) Gene Stilp filed a motion to reopen the record and admit a new contention in the above-captioned Bell Bend case; and (3) Public Citizen, the Sustainable Energy and Economic Development Coalition, and Lon Burnam filed a motion to reopen the record and admit a new contention in the above-captioned Comanche Peak case. The contested proceedings in these cases had been terminated at the Atomic Safety and Licensing Board Panel (ASLBP) level, and jurisdiction over these filings initially lay with the Commission. By order dated August 30, 2011, the Commission, acting through the Office of the Secretary, referred the pleadings to the ASLBP for appropriate action consistent with 10 CFR 2.309 and 2.326.

    The Board is comprised of the following administrative judges:

    Alan S. Rosenthal, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    Dr. Gary S. Arnold, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    Dr. William H. Reed, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    All correspondence, documents, and other materials shall be filed in accordance with the NRC E-Filing rule, which the NRC promulgated in August 2007 (72 FR 49,139).

    Start Signature

    Issued at Rockville, Maryland this 6th day of September 2011.

    E. Roy Hawkens,

    Chief Administrative Judge, Atomic Safety and Licensing Board anel.

    End Signature End Preamble

    [FR Doc. 2011-23221 Filed 9-9-11; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Comments Received:
0 Comments
Published:
09/12/2011
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
2011-23221
Pages:
56243-56243 (1 pages)
Docket Numbers:
Docket Nos. 52-025-COL, 52-026-COL, 52-039-COL, 52-034-COL, 52-035-COL, ASLBP No. 11-914-02-COL-BD01
PDF File:
2011-23221.pdf
Supporting Documents:
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Main Control Room Emergency Habitability System Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; PXS/ADS Line Resistance Changes
» Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Pipe Rupture Hazard and Flooding Analysis
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Addition of a Residual Heat Removal Suction Relief Valve for Low-Temperature Overpressure Protection; Exemption and Combined License Amendment; Issuance
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Clarification of Raceway and Raceway System Designations; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Central Chilled Water System Optimization Changes; Issuance of Exemption and Combined License Amendment
» Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria; Determination of Successful Completion of Inspections, Tests, and Analyses