96-22823. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 174 (Friday, September 6, 1996)]
    [Notices]
    [Pages 47124-47125]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-22823]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5472-8]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153. Weekly receipt of 
    Environmental Impact Statements Filed August 26, 1996 Through August 
    30, 1996 Pursuant to 40 CFR 1506.9.
    
    EIS No. 960403, Draft EIS, NPS, MA, Cape Cod National Seashore General 
    Management Plan, Implementation, Barnstable County, MA, Due: October 
    31, 1996, Contact: Maria Burks (508) 349-3785.
    
        This EIS was inadvertently omitted from the 8-30-96 Federal 
    Register. The official 45 day NEPA review period is calculated from 8-
    30-96.
    
    EIS No. 960404, Final EIS, FRC, WI, Flambeau River Hydroelectric 
    Projects, Big Falls (FERC No. 2930), Thornapple (FERC No. 2475), Upper 
    (FERC No. 2640), Lower (FERC No. 2421), Pixley (FERC No. 2395) and 
    Crowley (FERC No. 2473), Relicensing WI, Due: October 7, 1996, Contact: 
    Frank Karwoski (202) 219-2782.
    EIS No. 960405, Final EIS, FRC, ME, NH, Saco River Basin Hydropower 
    Development, (FERC Project Nos. 2528, 2527, 2194, 2531, 2529, 2530, and 
    11365), Licenses and Relicenses, ME and NH, Due: October 7, 1996, 
    Contact: Rich McGuire (202) 219-3084.
    EIS No. 960406, Draft EIS, FHW, WV, WV-9 Transportation Corridor 
    Improvements, from Martinsburg to Charles Town, Berkeley, Jefferson and 
    Morgan Counties, WV, Due: November 1, 1996, Contact: David Leighow 
    (304) 347-5329.
    EIS No. 960407, Final EIS, FRC, VT, MA, Deerfield River Hydroelectric 
    Project (FERC No. 2323), Bear Swamp Pumped Storage Project (FERC No. 
    2669) and Gardners Falls Project (FERC, No. 2334), New License/
    Relicense Issuance, VT and MA, Due: October 7, 1996, Contact: R. Feller 
    (202) 219-2796.
    EIS No. 960408, Draft EIS, NOA, OH, Ohio Combined Coastal Management 
    Program, Implementation, Special Management Areas (SMAs), Lake Erie, 
    OH, Coastal Management Program, Implementation, Special Management 
    Areas (SMAs), Lake Erie, OH, Due: November 15, 1996, Contact: Diana 
    Olinger (301) 713-3113.
    EIS No. 960409, Final EIS, AFS, OR, Upper Deschutes Wild and Scenic 
    River and State Scenic Waterway, Management Plan, Implementation, 
    Deschutes National Forest, Deschutes County, OR, Due: October 7, 1996, 
    Contact: Mollie Chaudet (541) 383-4769.
    EIS No. 960410, Final EIS, MMS, AL, CA, DE, LA, NJ, AK, CT, FL, MS, NY, 
    NC, RI, VA, OR, TX, WA, Gulf of Mexico and Offshore Alaska Outer 
    Continental Shelf (OCS) Oil and Gas Leasing Program 1997 to 2002 for 16 
    Lease Sales on Five-Year Leasing Program, Due: October 7, 1996, 
    Contact: Richard Wilderman (703) 787-1674.
    EIS No. 960411, Final EIS, NPS, NB, Niobrara National Scenic River, 
    General Management Plan, Niobrara/Missouri National Scenic Riverways, 
    Implementation, Brown, Cherry, Keya Paha and Rock Counties, NB, Due: 
    October 7, 1996, Contact: Warren Hill (402) 336-3970.
    EIS No. 960412, Draft Supplement, EPA, CA, International Wastewater 
    Treatment Plant and South Bay Ocean Outfall, Updated Information, 
    Interim Operation, Tijuana River, San Diego, CA, Due: October 21, 1996, 
    Contact: Elizabeth Borowiec (415) 744-1165.
    EIS No. 960413, Draft EIS, USN, CA, Las Pulgas and San Mateo Basin, 
    Cease and Desist Order, Sewage Effluent Compliance Project, NPDES 
    Permit, Marine Corps Base, Camp Pendleton,
    
    [[Page 47125]]
    
    San Diego County, CA, Due: October 21, 1996, Contact: David Walls (703) 
    696/2138.
    EIS No. 960414, Final EIS, USN, United States Navy Shipboard Solid 
    Waste Disposal, Implementation, MARPOL Special Areas: Designated Baltic 
    Sea, North Sea, Wilder Caribbean, Antarctic Ocean, Mediterranean Sea, 
    Black Sea and Red Sea, Gulfs Region: Persian Gulf and Gulf of Oman, 
    Due: October 7, 1996, Contact: Robert K. Ostermueller (610) 595-0759.
    
    Amended Notices
    
    EIS No. 960318, Draft EIS, FHW, CA, CA-125 South Route Location, 
    Adoption and Construction, between CA-905 on Otay Mesa to CA-54 in 
    Spring Valley, Funding and COE Section 404 Permit, San Diego County, 
    CA, Due: September 16, 1996, Contact: Jeffery S. Lewis (916) 498-5035. 
    Published FR 7-12-96--Review Period extended.
    
        Dated: September 3, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-22823 Filed 9-5-96; 8:45 am]
    BILLING CODE 6560-50-M
    
    
    

Document Information

Published:
09/06/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-22823
Pages:
47124-47125 (2 pages)
Docket Numbers:
ER-FRL-5472-8
PDF File:
96-22823.pdf