00-4135. Notice of Filing of Coal Capability of Reliant Energy Channelview LP Powerplant and Industrial Fuel Use Act  

  • Start Preamble

    AGENCY:

    Office of Fossil Energy; Department of Energy.

    ACTION:

    Notice of Filing.

    SUMMARY:

    Reliant Energy Channelview LP has submitted a coal capability self-certification pursuant to section 201 of the Powerplant and Industrial Fuel Use Act of 1978, as amended.

    ADDRESSES:

    Copies of self-certification filings are available for public inspection, upon request, in the Office of Coal & Power Im/Ex, Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Russell at (202) 586-9624.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), provides that no new baseload electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. In order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify, pursuant to FUA section 201(d), to the Secretary of Energy prior to construction, or prior to operation as a baseload powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with section 201(a) as of the date filed with the Department of Energy. The Secretary is required to publish a notice in the Federal Register that a certification has been filed. The following owner/operator of proposed new baseload powerplant has filed a self-certification in acccordance with section 201(d).

    Owner: Reliant Energy Channelview LP (C&E 0-04).

    Operator: Reliant Energy Channelview LP.

    Location: Shedon Road in Channelview, Harris County, TX.

    Plant Configuration: Combined-cycle.

    Capacity: 786 MW.

    Fuel: Natural gas.

    Purchasing Entities: Reliant Energy Services, Inc.

    In-Service Date: Late 2001.

    Start Signature

    Issued in Washington, DC, February 14, 2000.

    Anthony J. Como,

    Deputy Director, Electric Power Regulation, Office of Coal & Power Im/Ex., Office of Coal & Power Systems, Office of Fossil Energy.

    End Signature End Supplemental Information

    [FR Doc. 00-4135 Filed 2-18-00; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Published:
02/22/2000
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of Filing.
Document Number:
00-4135
Dates:
Late 2001.
Pages:
8688-8688 (1 pages)
Docket Numbers:
Docket Nos. FE C&E 00-02-184
PDF File:
00-4135.pdf