-
Start Preamble
AGENCY:
Federal Aviation Administration (FAA), DOT.
ACTION:
Monthly Notice of PFC Approvals and Disapprovals. In September 2001, there were four applications approved. Additionally, 19 approved amendments to previously approved applications are listed.
SUMMARY:
The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101-508) and part 158 of the Federal Aviation Regulations (14 CFR part 158). This notice is published pursuant to paragraph d of § 158.29.
PFC Applications Approved
Public Agency: County of Sheridan, Wyoming.
Application Number: 01-02-C-00-SHR.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $186,427.
Earliest Charge Effective Date: December 1, 2001.
Estimated Charge Expiration Date: March 1, 2005.
Class of Air Carriers not Required to Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use
Installation of edge drains for runway 14/32 and taxiway B.
Terminal building Americans with Disabilities Act improvements.
Design of runway rehabilitation and deicing containment facility.
Construction of deicing containment facility.
Runway 5/23 rehabilitation.
Decision Date: September 5, 2001.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Chris Schaffer, Denver Airports District Office, (303) 342-1258.
Public Agency: Municipal Airport Authority, Fargo, North Dakota.
Application Number: 01-05-C-00-FAR.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $1,942,080.
Earliest Charge Effective Date: September 1, 2002.
Estimated Charge Expiration Date: January 1, 2004.
Class of Air Carriers not Required to Collect PFC's: Air taxi/commercial operators filing FAA Form 1800-31.
Determination: Approved. Based on information contained in the public agency's application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Hector International Airport.
Brief Description of Projects Approved for Collection and Use
Emergency electrical generator for the passenger terminal.
Purchase and install jet bridge conversion equipment.
Purchase and install ultra high frequency radio system.
Purchase and install security announcement system.
Purchase and install passenger boarding bridge and rehabilitate boarding area.
Rehabilitate passenger terminal exterior and upgrade heating, ventilation, and air conditioning.
Electrical generator for snow removal equipment facility.
Install signage around perimeter of airport.
PFC development costs.
Truck mounted snow plow.
Security system modification.
Purchase passenger lift and stairs.
Truck mounted runway sanding unit.
Reimbursement for PFC audit and administrative fees.
Purchase and install automated passenger boarding bridge.
Purchase and install a flight information and display system.
Purchase forward looking infrared system.
Rehabilitate existing runway 17 threshold lights.
Acquire friction measuring device.
Terminal apron rehabilitation.
Taxiway B3 reconstruction.
Eastside general aviation apron improvements (phase I).
Eastside general aviation storm sewer rehabilitation (phase I).
Eastside commercial apron improvements (phase I).
Year 2000 upgrade of security access control system.
Upgrade runway surface sensor system for Year 2000.
Eastside general aviation apron improvements (phase II).
Eastside commercial apron improvements (phase II).
Eastside general aviation storm sewer rehabilitation (phase II).
Rehabilitate runway 13/31.
Improve surface drainage along taxiway A.
Install runway threshold lights on runway 8/26.
Construct county drain 10.
Construct airport perimeter road.
Plans and specifications for runway 8/26 extension and perimeter roads.
Conduct airport master plan update.
Decision Date: September 12, 2001.
End Further Info Start Further InfoFOR FURTHER INFORMATION CONTACT:
Tom Schauer, Bismarck Airports District Office, (701) 323-7380.
Public Agency: County of Clinton, Plattsburgh, New York.
Application Number: 01-05-C-00-PLB.
Application Type: Impose and use a PFC.
PFC Level: $3.00.
Total PFC Revenue Approved in This Decision: $56,500.
Earliest Charge Effective Date: December 1, 2002.
Estimated Charge Expiration Date: April 1, 2005.
Classes of Air Carriers not Required to Collect PFC's: Non-scheduled/on demand operators filing FAA Form 1800-31.
Determination: Approved. Based on information contained in the public agency's application, the FAA has Start Printed Page 56374determined that the approved class accounts for less than 1 percent of the total annual enplanements at Clinton County Airport.
Brief Description of Projects Approved for Collection and Use
Purchase runway sweeper.
Runways 1/19 and 14/32 crack repair.
Brief Description of Projects Approved for Use
On-airport obstruction removal.
Transient apron rehabilitation.
Decision Date: September 26, 2001.
End Further Info Start Further InfoFOR FURTHER INFORMATION CONTACT:
Robert Levine, New York Airports District Office, (516) 227-3807.
Public Agency: Gillette-Campbell County Airport Board, Gillette, Wyoming.
Application Number: 01-03-C-00-GCC.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $163,944.
Earliest Charge Effective Date: December 1, 2001.
Estimated Charge Expiration Date: June 1, 2004.
Classes of Air Carriers not Required to Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use
Design project (rehabilitate runway 16/34 shoulders, groove runway 3/21, relocate taxiway C, and extend taxiway C).
Rehabilitate runway 16/34 shoulders and construct blast pads.
Groove runway 3/21.
Relocate taxiway C.
Extended taxiway C to the runway 21 threshold.
Brief Description of Projects Approved for Collection:
Construct new electrical vault.
Construct combined aircraft rescue and firefighting/snow removal equipment building.
Decision Date: September 28, 2001.
End Further Info Start Further InfoFOR FURTHER INFORMATION CONTACT:
Chris Schaffer, Denver Airports District Office, (303) 342-1258.
Amendments to PFC Approvals
Start SignatureAmendment No. city, state Amendment approved date Original approved net PFC revenue Amended approved net PFC revenue Original estimated charge exp. date Amended estimated charge exp. date 95-03-C-03-GPT Gulfport, MS 05/07/01 $4,608,400 $4,763,478 02/01/02 08/01/01 98-02-C-01-CRP Corpus Christi, TX 06/25/01 32,863,948 41,083,878 12/01/17 04/01/23 99-06-C-01-CLE Cleveland, OH 08/31/01 182,207,915 100,101,915 03/01/08 10/01/04 01-12-C-02-ORD Chicago, IL 09/05/01 1,594,827,790 1,315,327,790 10/01/18 10/01/16 98-04-C-02-CRW Charleston, WV 08/31/01 1,253,835 700,795 02/01/01 05/01/00 93-01-C-03-MSN Madison, WI 09/13/01 9,560,000 4,736,271 05/01/00 05/01/98 96-02-C-01-MSN Madison, WI 09/13/01 NA NA 05/01/00 05/01/98 99-04-C-01-MSN Madison, WI 09/13/01 9,716,667 5,396,747 12/01/06 11/01/01 *95-01-C-01-EAU Eau Claire, WI 09/14/01 755,028 757,028 09/01/05 01/01/06 98-02-C-01-RDM Redmond, OR 09/17/01 571,248 726,735 02/01/03 02/01/03 98-01-C-01-ROA Roanoke, VA 09/18/01 7,237,454 6,548,454 03/01/06 06/01/05 *98-01-C-02-ROA Roanoke, VA 09/20/01 6,548,454 6,463,183 06/01/05 05/01/04 00-10-C-01-BDL Windsor Locks, CT 09/21/01 4,358,000 1,869,103 01/01/01 01/01/01 *98-04-I-03-STL St. Louis, MO 09/21/01 178,756,391 200,257,958 09/01/01 05/01/02 99-05-U-02-STL St. Louis, MO 09/21/01 NA NA 09/01/01 05/01/02 *93-01-C-02-CAE Columbia, SC 09/25/01 32,892,904 70,528,884 09/01/01 12/01/10 *92-01-C-04-HPN White Plains, NY 09/27/01 19,383,000 17,932,607 10/01/13 05/01/04 *98-05-C-01-MEI Meridian, MS 09/28/01 121,650 121,650 09/01/02 09/01/02 *99-06-C-01-MEI Meridian, MS 09/28/01 148,000 148,000 05/01/04 05/01/04 Note: The amendments denoted by an asterisk (*) include a change to the PFS level charged from $3.00 per enplaned passenger to $4.50 per enplaned passenger. For Meridian, MS, St. Louis, MO, White Plains, NY, Columbia, SC, Roanoke, VA, and Eau Claire, WI, this change is effective on December 1, 2001. Issued in Washington, DC. on October 31, 2001.
Eric Gabler,
Manager, passenger Facility Charge Branch.
[FR Doc. 01-27996 Filed 11-6-01; 8:45 am]
BILLING CODE 4910-13-M
Document Information
- Effective Date:
- 12/1/2001
- Published:
- 11/07/2001
- Department:
- Federal Aviation Administration
- Entry Type:
- Notice
- Action:
- Monthly Notice of PFC Approvals and Disapprovals. In September 2001, there were four applications approved. Additionally, 19 approved amendments to previously approved applications are listed.
- Document Number:
- 01-27996
- Dates:
- December 1, 2001.
- Pages:
- 56373-56374 (2 pages)
- PDF File:
- 01-27996.pdf