02-9958. Prevailing Rate Systems; Change in the Survey Cycle for the Portland, OR, Appropriated Fund Wage Area  

  • Start Preamble Start Printed Page 20009

    AGENCY:

    Office of Personnel Management.

    ACTION:

    Interim rule with request for comments.

    SUMMARY:

    The Office of Personnel Management is issuing an interim rule to change the timing of local wage surveys in the Portland, Oregon, appropriated fund Federal Wage System (FWS) wage area. This change will help the Department of Defense better balance its FWS wage survey workload. DOD will conduct full-scale wage surveys in the Portland wage area in August of each even-numbered fiscal year beginning in August 2002.

    EFFECTIVE DATE:

    This interim rule is effective on April 24, 2002. Comments must be received on or before May 24, 2002.

    ADDRESSES:

    Send or deliver comments to Donald J. Winstead, Assistant Director for Compensation Administration, Workforce Compensation and Performance Service, Office of Personnel Management, Room 7H31, 1900 E Street NW., Washington, DC 20415-8200, or FAX: (202) 606-4264.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Chenty I. Carpenter at (202) 606-2838; by FAX at (202) 606-4264; or by e-mail at cicarpen@opm.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Department of Defense (DOD) requested that the Office of Personnel Management (OPM) change the timing of local wage surveys in the Portland, Oregon, appropriated fund Federal Wage System (FWS) wage area. Full-scale wage surveys currently begin in August of each odd-numbered fiscal year. Full-scale wage surveys will begin in the future in August of each even-numbered fiscal year. Under section 532.207 of title 5, Code of Federal Regulations, the scheduling of wage surveys takes into consideration the best timing in relation to wage adjustments in the principal local private enterprise establishments, a reasonable distribution of the workload of the lead agency, the timing of surveys for nearby wage areas, and scheduling relationships with other pay surveys.

    DOD asked OPM to change the starting time for local wage surveys in the Portland, Oregon, wage area to August of even-numbered fiscal years to balance the overall workload of its survey office. DOD conducted a full scale survey in August of 2001 and will conduct another full-scale wage survey in Portland in August 2002.

    The Federal Prevailing Rate Advisory Committee, the national labor-management committee responsible for advising OPM on matters concerning the pay of FWS employees, recommended by consensus that we change the full-scale survey cycle for the Portland wage area from August of each odd-numbered fiscal year to August of each even-numbered fiscal year.

    Regulatory Flexibility Act

    I certify that this regulation will not have a significant economic impact on a substantial number of small entities because it will affect only Federal agencies and employees.

    Start List of Subjects

    List of Subjects in 5 CFR Part 532

    • Administrative practice and procedure
    • Freedom of information
    • Government employees
    • Reporting and recordkeeping requirements
    • Wages
    End List of Subjects Start Signature

    Office of Personnel Management.

    Kay Coles James,

    Director.

    End Signature Start Amendment Part

    Accordingly, the Office of Personnel Management amends 5 CFR part 532 as follows:

    End Amendment Part Start Part

    PART 532—PREVAILING RATE SYSTEMS

    End Part Start Amendment Part

    1. The authority citation for part 532 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 5 U.S.C. 5343, 5346; § 532.707 also issued under 5 U.S.C. 552.

    End Authority

    Appendix A to Subpart B of Part 532 [Amended]

    Start Amendment Part

    2. Appendix A to subpart B of Part 532 is amended by revising “odd” to “even” under the heading Fiscal year of full-scale survey under the State of Oregon for the Portland appropriated fund wage area.

    End Amendment Part End Supplemental Information

    [FR Doc. 02-9958 Filed 4-23-02; 8:45 am]

    BILLING CODE 6325-39-M

Document Information

Effective Date:
4/24/2002
Published:
04/24/2002
Department:
Personnel Management Office
Entry Type:
Rule
Action:
Interim rule with request for comments.
Document Number:
02-9958
Dates:
This interim rule is effective on April 24, 2002. Comments must be received on or before May 24, 2002.
Pages:
20009-20009 (1 pages)
RINs:
3206-AJ60: Prevailing Rate Systems; Change in the Survey Cycle for the Portland, Oregon, Wage Area
RIN Links:
https://www.federalregister.gov/regulations/3206-AJ60/prevailing-rate-systems-change-in-the-survey-cycle-for-the-portland-oregon-wage-area
Topics:
Administrative practice and procedure, Freedom of information, Government employees, Reporting and recordkeeping requirements, Wages
PDF File:
02-9958.pdf
CFR: (1)
5 CFR 532