02-9998. Pacific Gas & Electric Company, Pacific Gas & Electric Company, Northern California Power Agency v. Pacific Gas & Electric Company and the California Independent System Operator Corporation; Notice of Technical Conferences
-
Start Preamble
Start Printed Page 20110
April 18, 2002.
In the Commission's order issued on March 14, 2002,[1] the Commission directed a technical conference be held to address issues raised by the filing.
Take notice that a technical/settlement conference will be held on Wednesday through Friday, May 1-3, 2002 at 10 a.m. in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
A second technical/settlement conference will be held on Tuesday through Thursday, May 21-23, 2002 at 10:00 a.m. in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The parties will file a list of common issues in the above-referenced dockets with the Commission by April 25, 2002. Parties may file comments following the technical/settlement conferences by June 4, 2002, and reply comments by June 14, 2002.
All interested parties and staff are permitted to attend the conferences.
Start SignatureLinwood A. Watson, Jr.,
Deputy Secretary.
Footnotes
1. Pacific Gas & Electric Company, et al., 98 FERC ¶ 61,281 (2002).
Back to Citation[FR Doc. 02-9998 Filed 4-23-02; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 04/24/2002
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 02-9998
- Pages:
- 20110-20110 (1 pages)
- Docket Numbers:
- Docket Nos. ER01-2998-000, ER02-358-000, and Docket No. EL02-64-000 (Not Consolidated)
- EOCitation:
- of 2002-04-18
- PDF File:
- 02-9998.pdf