03-6629. Drawbridge Operation Regulations: Taunton River, MA  

  • Start Preamble

    AGENCY:

    Coast Guard, HS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Brightman Street Bridge, mile 1.8, across the Taunton River between Fall River and Somerset, Massachusetts. This deviation from the regulations allows the bridge to remain in the closed position from 9 p.m. on March 14, 2003 through 4 p.m. on March 28, 2003. This deviation is necessary to facilitate scheduled maintenance at the bridge.

    DATES:

    This deviation is effected from March 14, 2003 through March 28, 2003.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    John W. McDonald, Project Officer, First Coast Guard District, at (617) 223-8364.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The vertical clearance under the bridge in the closed position is 27 feet at mean high water and 31 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.619(b).

    The bridge owner, Massachusetts Highway Department, requested a temporary deviation from the drawbridge operation regulations to facilitate necessary structural repairs at the bridge, replacement of the stringers on both bascule spans, at the bridge.

    Under this deviation the bridge may remain in the closed position from 9 p.m. on March 14, 2003 through 4 p.m. on March 28, 2003.

    There have been few requests to open this bridge during the requested time period scheduled for these structural repairs in past years. The Coast Guard and the bridge owner coordinated this closure with the facilities upstream from the bridge and no objections to this scheduled closure were received.

    This deviation from the operating regulations is authorized under 33 CFR 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible.

    Start Signature

    Dated: March 3, 2003.

    Vivien S. Crea,

    Rear Admiral, Coast Guard, Commander, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 03-6629 Filed 3-18-03; 8:45 am]

    BILLING CODE 4910-15-U

Document Information

Effective Date:
3/14/2003
Published:
03/19/2003
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
03-6629
Dates:
This deviation is effected from March 14, 2003 through March 28, 2003.
Pages:
13226-13226 (1 pages)
Docket Numbers:
CGD01-03-011
PDF File:
03-6629.pdf
CFR: (1)
33 CFR 117