04-2086. Drawbridge Operation Regulations; Berwick Bay, Morgan City, LA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    Start Printed Page 5018

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Burlington Northern Railway Vertical Lift Span Railroad Bridge across Berwick Bay, mile 17.5 (Gulf Intracoastal Waterway (Morgan City to Port Allen Alternate Route), mile 0.4), at Morgan City, St. Mary Parish, Louisiana. This deviation provides for three (3) six-hour bridge closures to conduct scheduled maintenance to the railroad on the drawbridge.

    DATES:

    This deviation is effective from 8 a.m. on Wednesday, February 18, 2004 until 2 p.m. on Friday, February 20, 2004.

    ADDRESSES:

    Materials referred to in this document are available for inspection or copying at the office of the Eighth Coast Guard District, Bridge Administration Branch, Hale Boggs Federal Building, room 1313, 501 Magazine Street, New Orleans, Louisiana 70130-3396 between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (504) 589-2965. The Bridge Administration Branch of the Eighth Coast Guard District maintains the public docket for this temporary deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    David Frank, Bridge Administration Branch, telephone (504) 589-2965.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Burlington Northern Railway Company has requested a temporary deviation in order to repair and replace damaged rails on the lift span of the bridge across Berwick Bay, mile 17.5, at Morgan City, St. Mary Parish, Louisiana. This maintenance is essential for the continued safe operation of the railroad bridge. This temporary deviation will allow the bridge to remain in the closed-to-navigation position from 8 a.m. until 2 p.m., Wednesday through Friday from February 18, 2004 through February 20, 2004.

    The vertical lift span bridge has a vertical clearance of 4 feet above National Geodetic Vertical Datum (NGVD) in the closed-to-navigation position and 73 feet above NGVD in the open-to-navigation position. Navigation at the site of the bridge consists of tugs with tows transporting petroleum products, chemicals and construction equipment, commercial fishing vessels, oil industry related work boats and crew boats and some recreational craft. Since the lift span of the bridge will only be closed to navigation six hours per day for three days, ample time will be allowed for commercial and recreational vessels to schedule transits. Accordingly, it has been determined that this closure will not have a significant effect on vessel traffic. The bridge normally remains in the open-to-navigation position until a train enters the signal block, requiring it to close. An average number of openings for the passage of vessels is, therefore, not available. During the repair period, the bridge may open for emergencies; however, delays should be expected to remove all equipment from the bridge. The Intracoastal Waterway—Morgan City to Port Allen Landside Route is an alternate route for vessels with less than a 12-foot draft.

    In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: January 23, 2004.

    Marcus Redford,

    Bridge Administrator.

    End Signature End Supplemental Information

    [FR Doc. 04-2086 Filed 2-2-04; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
2/18/2004
Published:
02/03/2004
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
04-2086
Dates:
This deviation is effective from 8 a.m. on Wednesday, February 18, 2004 until 2 p.m. on Friday, February 20, 2004.
Pages:
5017-5018 (2 pages)
Docket Numbers:
CGD08-04-003
PDF File:
04-2086.pdf
CFR: (1)
33 CFR 117