Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Coast Guard has temporarily changed the drawbridge operation regulations that govern the operation of the SR 27 Bridge, at mile 0.7, across Townsend Gut, between Boothbay Harbor and Southport, Maine. This temporary rule requires the bridge to open at specific times between 6 a.m. and 6 p.m., each day, from March 14, 2005 through November 30, 2005. Additionally, this temporary rule would also allow four 4-day closures during the effective period of this rule when the bridge may remain in the closed position. This action is necessary to help facilitate rehabilitation construction at the bridge.
DATES:
This rule is effective on March 14, 2005, through November 30, 2005.
ADDRESSES:
Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket (CGD01-04-129) and are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts, 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. John W. McDonald, Project Officer, First Coast Guard District, (617) 223-8364.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Regulatory Information
On January 5, 2005, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulations, Townsend Gut, Maine, in the Federal Register (70 FR 773).
We received no comments in response to the notice of proposed rulemaking. No public hearing was requested and none was held.
Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register.
The Coast Guard believes making this final rule effective less than 30 days after publication is reasonable because the bridge rehabilitation construction is necessary vital work that needs to be performed as soon as possible.
Any delay in making this final rule effective would not be in the best interest of public or safety because performing this work during the non-winter months March 14, 2005 through November 30, 2005, is the best time period during which construction personnel may work in a more safe and productive manner to help restore the SR 27 Bridge to a more safe and reliable operational status.
Background and Purpose
The SR 27 Bridge has a vertical clearance of 10 feet at mean high water, and 19 feet at mean low water in the closed position. The existing drawbridge operating regulations under 33 CFR 117.5 require the bridge to open on signal at all times.
The bridge owner, Maine Department of Transportation, has requested a Start Printed Page 12806temporary rule to allow the bridge to open at specific times of either two or three hour intervals between 6 a.m. and 6 p.m., from March through November 2005.
The purpose of this temporary regulation is to help facilitate rehabilitation construction at the bridge. Frequent unscheduled bridge openings would greatly limit the progress of the rehabilitation project.
On January 5, 2005, we published a notice of proposed rulemaking (70 FR 773) with an effective period from March 1, 2005 through November 30, 2005. Subsequent to publication of the notice of proposed rulemaking the bridge owner advised us that they would not begin the rehabilitation construction work until March 14, 2005. As a result we have changed the effective period for this temporary final rule to be effective from March 14, 2005 through November 30, 2005.
Under this temporary final rule the SR 27 Bridge shall operate as follows:
From March 14, 2005 through May 26, 2005, and from September 6, 2005 through November 30, 2005, the draw shall open on signal every three hours at 6 a.m., 9 a.m., 12 p.m., 3 p.m. and 6 p.m., daily. From 6 p.m. to 6 a.m. and on holidays, the draw shall open on signal.
From May 27, 2005 through September 5, 2005, the draw shall open on signal every two hours at 6 a.m., 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., and 6 p.m., daily. From 6 p.m. through 6 a.m. and holidays, the draw shall open on signal.
In addition, this temporary rule would also allow bridge to remain in the closed position for four 4-day closures as follows: April 11, 2005 through April 14, 2005; April 25, 2005 through April 28; May 9 through May 12; May 23 through May 26; May 9 through May 12, and May 23 through May 26, 2005.
Discussion of Comments and Changes
The Coast Guard received no comments in response to the notice of proposed rulemaking. We changed the effective date of this final rule from March 1, 2005 to March 14, 2005, upon learning that work would not commence as originally scheduled.
Regulatory Evaluation
This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3), of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).
This conclusion is based on the fact that vessel traffic will still be able to transit through the SR27 Bridge under a fixed opening schedule. Vessel operators may adjust their schedules to correspond with the opening schedule at the bridge. Vessel operators may also use the alternate route should they need to transit at other times.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605(b), that this rule will not have a significant economic impact on a substantial number of small entities.
This conclusion is based on the fact that vessel traffic will still be able to transit through the SR27 Bridge under a fixed opening schedule. Vessel operators may adjust their schedules to correspond with the opening schedule at the bridge. Vessels operators may also use the alternate route should they need to transit at other times.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.
No small entities requested Coast Guard assistance and none was given.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).
Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.
Indian Tribal Governments
This final rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes. Start Printed Page 12807
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.
This proposed rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
Environment
We have analyzed this final rule under Commandant Instruction M16475.1D, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore, this rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction, from further environmental documentation. It has been determined that this final rule does not significantly impact the environment.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
Regulations
Start Amendment PartFor the reasons set out in the preamble, the Coast Guard amends 33 CFR part 117 as follows:
End Amendment Part Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. From March 14, 2005 through November 30, 2005, § 117.T536 is temporarily added to read as follows:
End Amendment PartTownsend Gut.The draw of the SR 27 Bridge, mile 0.7, across Townsend Gut shall operate as follows:
(a) From March 14, 2005 through May 26, 2005, and from September 6, 2005 through November 30, 2005, the draw shall open on signal at 6 a.m., 9 a.m., 12 p.m., 3 p.m., and 6 p.m., daily. From 6 p.m. through 6 a.m., and on holidays, the draw shall open on signal.
(b) From May 27, 2005 through September 5, 2005, the draw shall open on signal at 6 a.m., 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., and 6 p.m., daily. From 6 p.m. through 6 a.m., and on holidays, the draw shall open on signal.
(c) The bridge may remain in the closed position for four 4-day closures as follows: April 11 through April 14; April 25 through April 28; May 9 through May 12; and May 23 through May 26, 2005.
Dated: March 9, 2005.
John L. Grenier,
Captain, U.S. Coast Guard, Acting Commander, First Coast Guard District.
[FR Doc. 05-5188 Filed 3-15-05; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 3/14/2005
- Published:
- 03/16/2005
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 05-5188
- Dates:
- This rule is effective on March 14, 2005, through November 30, 2005.
- Pages:
- 12805-12807 (3 pages)
- Docket Numbers:
- CGD01-04-129
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 05-5188.pdf
- CFR: (1)
- 33 CFR 117.T536